{"@context":"https://data.qipu.org/context.jsonld","@id":"https://data.qipu.org/sf/place/fill/mission-bay","@type":"schema:Place","id":"qipu:sf/place/fill/mission-bay","url":"https://data.qipu.org/sf/place/fill/mission-bay","type":"place","kind":"fill_area","name":"Mission Bay","parent":{"id":"qipu:sf/place/city","url":"https://data.qipu.org/sf/place/city"},"lat":37.7668,"lon":-122.391,"neighbourhood":null,"same_as":{"wikidata":"Q6878535"},"source_of_geometry":"Wikidata Q6878535 (point, dates); radius set by qipu","children":null,"claims_columns":["when","property","what","outcome","precision","source","link","record_id","from_tables"],"claims":[["1800","described in","Mission Bay was gradually filled in the late 1800s and early 1900s",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n431","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1800","described in","formerly part of San Francisco Bay, filled in",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n458","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1850","described in","artificial fill, mostly unengineered, placed in a shallow inlet of the Bay",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n762","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1865","described in","gradually filled in between 1865 and 1913",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n543","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1866","depicted in","Railroad Map Of The City Of San Francisco California. Published By A. Gensoul Pacific Map Depot 511 Montgomery St. S. Franco. 1866. Lith. Britton & Co. S.F.",null,"area","Maps and images: Railroad Map Of The City Of San Francisco California. Published By A. Gensoul Pacif","https://archive.org/details/dr_railroad-map-of-the-city-of-san-francisco-california-published-by-a-genso-4655000","qipu:sf/place/fill/mission-bay","showcase_search"],["1868","conveyed","Southern Pacific railroad",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n42","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1868","conveyed","Southern Pacific railroad acquired the bulk of the Mission Bay property",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n54","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1868","documented in","San Francisco general plan : amendments to the general plan : adopted between August 1997 and June 1998",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between A","https://archive.org/details/C124922683/page/n31","ia:C124922683","x_dl_facts"],["1868","described in","Mission Bay and Mission Creek filled by Southern Pacific railroad",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between A","https://archive.org/details/C124922683/page/n31","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1873","depicted in","Sale map no. 12. Salt marsh and tide lands situate in the city and county of San Francisco, state of California. To be sold at public auction by order of the Board of Tide Land Commissioners ... at the sales rooms of Greenebaum & Co., auctioneers, nos. 115 & 117 Bush Street, San Francisco. Sale to c",null,"area","Maps and images: Sale map no. 12. Salt marsh and tide lands situate in the city and county of San Fr","https://archive.org/details/dr_sale-map-no-12-salt-marsh-and-tide-lands-situate-in-the-city-and-county-o-3971000","qipu:sf/place/fill/mission-bay","showcase_search"],["1908","concerns place","Rocks in San Francisco Harbor, California. Letter from the Secretary of War, transmitting, with a letter from the Chief of Engineers, reports of examination and survey of Mission Bay rocks, Packard rock, Whiting rock, Fifteen-Foot rock, Invincible rock, Noonday rocks, and Anita rock; also Centissima",null,"area","Open Library: Rocks in San Francisco Harbor, California. Letter from the Secretary of War, transmitt","https://openlibrary.org/works/OL11497881W","web:openlibrary.org/works/OL11497881W","showcase_search"],["1940","depicted in","San Francisco Scale Model L1",null,"area","Maps and images: San Francisco Scale Model L1","https://archive.org/details/dr_san-francisco-scale-model-l1-10261062","qipu:sf/place/fill/mission-bay","showcase_search"],["1940","depicted in","San Francisco Scale Model L2",null,"area","Maps and images: San Francisco Scale Model L2","https://archive.org/details/dr_san-francisco-scale-model-l2-10261063","qipu:sf/place/fill/mission-bay","showcase_search"],["1940","depicted in","San Francisco Scale Model K5",null,"area","Maps and images: San Francisco Scale Model K5","https://archive.org/details/dr_san-francisco-scale-model-k5-10261058","qipu:sf/place/fill/mission-bay","showcase_search"],["1954","concerns place","Collis Potter Huntington",null,"area","Books and texts: Collis Potter Huntington","https://archive.org/details/collispotterhunt02evan","ia:collispotterhunt02evan","showcase_search"],["1954","concerns place","Collis Potter Huntington",null,"area","Books and texts: Collis Potter Huntington","https://archive.org/details/collispotterhunt01evan","ia:collispotterhunt01evan","showcase_search"],["1963","depicted in","Mission Bay Railyards 1963 From Lost Landscapes No 1",null,"area","Films and video: Mission Bay Railyards 1963 From Lost Landscapes No 1","https://archive.org/details/mission-bay-railyards-1963-from-lost-landscapes-no-1","qipu:sf/place/fill/mission-bay","showcase_search"],["1973","documented in","San Francisco Bay area in-depth study : vessels and port facilities analysis channels, ports and related facilities inventory",null,"area","Democracy's Library: San Francisco Bay area in-depth study : vessels and port facilities analysis ch","https://archive.org/details/C123317767/page/n51","ia:C123317767","x_dl_facts"],["1973","described in","Normal operating capacity 450 cars (Southern Pacific)",null,"area","Democracy's Library: San Francisco Bay area in-depth study : vessels and port facilities analysis ch","https://archive.org/details/C123317767/page/n51","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1974","described in","DCP survey listed no buildings within the Mission Bay area; none of the structures are considered significant by DCP or Heritage",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n546","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1980","described in","Bay View and the Mission are highly motivated neighborhoods, but not enough is being done to help them",null,"area","Democracy's Library: San Francisco arts policy : a background paper","https://archive.org/details/C123307279/page/n169","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1980","documented in","San Francisco arts policy : a background paper",null,"area","Democracy's Library: San Francisco arts policy : a background paper","https://archive.org/details/C123307279/page/n169","ia:C123307279","x_dl_facts"],["1981","units","up to 9,000 housing units at 160 units per acre",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n33","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1982","proposed","residential development on approximately 127 gross acres in favored plan",null,"area","Democracy's Library: Local development policy survey update for San Francisco","https://archive.org/details/C124878958/page/n15","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1982","proposed","rejected by Southern Pacific because it ranked low in public and private goals",null,"area","Democracy's Library: Report to the Board of Supervisors of the City and County of San Francisco : re","https://archive.org/details/C124878444/page/n64","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1982","proposed","one of eleven potential development plans considered by Southern Pacific",null,"area","Democracy's Library: Report to the Board of Supervisors of the City and County of San Francisco : re","https://archive.org/details/C124878444/page/n64","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1983","documented in","Stadium feasibility analysis : task force report to the mayor, October 1983",null,"area","Democracy's Library: Stadium feasibility analysis : task force report to the mayor, October 1983","https://archive.org/details/c124897684/page/n54","ia:c124897684","x_dl_facts"],["1983","described in","over 12,000 parking spaces",null,"area","Democracy's Library: Stadium feasibility analysis : task force report to the mayor, October 1983","https://archive.org/details/c124897684/page/n54","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1983","described in","Southern Pacific is preparing a Master Plan for these properties",null,"area","Democracy's Library: Growth management alternatives for downtown San Francisco : downtown EIR consul","https://archive.org/details/c124896626/page/n116","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1983","described in","total parking supply between 29,000 and 32,000 spaces",null,"area","Democracy's Library: Stadium feasibility analysis : task force report to the mayor, October 1983","https://archive.org/details/c124897684/page/n54","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1983","proposed","Major new source of support commercial and secondary office space",null,"area","Democracy's Library: The downtown plan : proposal for citizen review","https://archive.org/details/c124897620/page/n40","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1983","proposed","Mixed-use project with substantial amounts of housing",null,"area","Democracy's Library: Growth management alternatives for downtown San Francisco : downtown EIR consul","https://archive.org/details/c124896626/page/n116","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1983","proposed","over 12,000 parking spaces",null,"area","Democracy's Library: Stadium feasibility analysis : task force report to the mayor, October 1983","https://archive.org/details/c124897684/page/n18","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1983","proposed","rezoning of Mission Bay, Rincon Hill, and Rincon Point-South Beach",null,"area","Democracy's Library: Local development policy survey update for San Francisco","https://archive.org/details/C124878958/page/n20","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1983","concerns place","North Mission News",null,"area","Books and texts: North Mission News","https://archive.org/details/northmissionnews05nort","ia:northmissionnews05nort","showcase_search"],["1983","concerns place","Telegraph Hill Semaphore",null,"area","Books and texts: Telegraph Hill Semaphore","https://archive.org/details/semaphore85tele","ia:semaphore85tele","showcase_search"],["1983","units","7,500 residential units tentatively planned on 153-acre site",null,"area","Democracy's Library: Local development policy survey update for San Francisco","https://archive.org/details/C124878958/page/n15","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1983","documented in","The downtown plan : proposal for citizen review",null,"area","Democracy's Library: The downtown plan : proposal for citizen review","https://archive.org/details/c124897620/page/n40","ia:c124897620","x_dl_facts"],["1983","described in","stadium sites located on or adjacent to Mission Bay project; shared parking could eliminate stadium parking need",null,"area","Democracy's Library: Stadium feasibility analysis : task force report to the mayor, October 1983","https://archive.org/details/c124897684/page/n18","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1983","described in","Southern Pacific",null,"area","Democracy's Library: Stadium feasibility analysis : task force report to the mayor, October 1983","https://archive.org/details/c124897684/page/n54","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1983","documented in","Growth management alternatives for downtown San Francisco : downtown EIR consultant's report",null,"area","Democracy's Library: Growth management alternatives for downtown San Francisco : downtown EIR consul","https://archive.org/details/c124896626/page/n116","ia:c124896626","x_dl_facts"],["1984","documented in","Report to the Board of Supervisors of the City and County of San Francisco : review of the report of the Mayor's Stadium Task Force",null,"area","Democracy's Library: Report to the Board of Supervisors of the City and County of San Francisco : re","https://archive.org/details/C124878444/page/n98","ia:C124878444","x_dl_facts"],["1984","documented in","Downtown : proposal as adopted by the City Planning Commission as a part of the master plan",null,"area","Democracy's Library: Downtown : proposal as adopted by the City Planning Commission as a part of the","https://archive.org/details/C124887761/page/n25","ia:C124887761","x_dl_facts"],["1984","described in","higher transportation access rankings and lower transportation improvement costs than expected at other downtown sites",null,"area","Democracy's Library: Report to the Board of Supervisors of the City and County of San Francisco : re","https://archive.org/details/C124878444/page/n26","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1984","described in","Resulted in more favorable transportation implications than analysis of the other sites would have produced",null,"segment","Democracy's Library: Report to the Board of Supervisors of the City and County of San Francisco : re","https://archive.org/details/C124878444/page/n82","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1984","described in","Four sites selected for detailed analysis within Task Force site zone",null,"area","Democracy's Library: Report to the Board of Supervisors of the City and County of San Francisco : re","https://archive.org/details/C124878444/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1984","documented in","Proposal to Pacific Fleet Battleship Homeporting Team",null,"area","Democracy's Library: Proposal to Pacific Fleet Battleship Homeporting Team","https://archive.org/details/C124891592/page/n68","ia:C124891592","x_dl_facts"],["1984","proposed","Mixed residential-commercial use area selected for housing on publicly owned land",null,"area","Democracy's Library: Residence : the residence element of the comprehensive plan of the city and Cou","https://archive.org/details/C124885198/page/n41","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1984","described in","up to 16,410 future parking spaces",null,"area","Democracy's Library: Report to the Board of Supervisors of the City and County of San Francisco : re","https://archive.org/details/C124878444/page/n90","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1984","described in","a major office, research and development and housing project",null,"area","Democracy's Library: Proposal to Pacific Fleet Battleship Homeporting Team","https://archive.org/details/C124891592/page/n68","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1984","described in","Task Force Report assigned a lower traffic, transit and pedestrian improvement cost than to Site 7 or Site 5",null,"segment","Democracy's Library: Report to the Board of Supervisors of the City and County of San Francisco : re","https://archive.org/details/C124878444/page/n82","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1984","proposed","Site 6 stadium alternative, downtown site evaluation",null,"segment","Democracy's Library: Report to the Board of Supervisors of the City and County of San Francisco : re","https://archive.org/details/C124878444/page/n58","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1984","proposed","Site 14 stadium alternative, downtown site evaluation",null,"segment","Democracy's Library: Report to the Board of Supervisors of the City and County of San Francisco : re","https://archive.org/details/C124878444/page/n58","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1984","described in","major new source of space for support commercial and secondary office",null,"area","Democracy's Library: Downtown : proposal as adopted by the City Planning Commission as a part of the","https://archive.org/details/C124887761/page/n25","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1984","described in","future development could increase parking supply significantly",null,"area","Democracy's Library: Report to the Board of Supervisors of the City and County of San Francisco : re","https://archive.org/details/C124878444/page/n98","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1984","documented in","Residence : the residence element of the comprehensive plan of the city and County of San Francisco",null,"area","Democracy's Library: Residence : the residence element of the comprehensive plan of the city and Cou","https://archive.org/details/C124885198/page/n39","ia:C124885198","x_dl_facts"],["1984","described in","Four sites within site zone generally comprising China Basin/Mission Bay project area",null,"area","Democracy's Library: Report to the Board of Supervisors of the City and County of San Francisco : re","https://archive.org/details/C124878444/page/n24","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1984","proposed","Site 9 stadium alternative, downtown site evaluation",null,"corner","Democracy's Library: Report to the Board of Supervisors of the City and County of San Francisco : re","https://archive.org/details/C124878444/page/n58","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1984","described in","8,800",null,"area","Democracy's Library: Residence : the residence element of the comprehensive plan of the city and Cou","https://archive.org/details/C124885198/page/n39","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1984","proposed","Evaluated for transportation impacts as one of three alternative downtown stadium sites; used as demonstration site",null,"segment","Democracy's Library: Report to the Board of Supervisors of the City and County of San Francisco : re","https://archive.org/details/C124878444/page/n82","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1984","units","7,577 units of housing",null,"area","Democracy's Library: Proposal to Pacific Fleet Battleship Homeporting Team","https://archive.org/details/C124891592/page/n68","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1984-02-28","proposed","Selected as the one final downtown site for analysis",null,"area","Democracy's Library: Report to the Board of Supervisors of the City and County of San Francisco : re","https://archive.org/details/C124878444/page/n8","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1985","concerns place","Objectives and policies, Mission Bay, San Francisco : proposal for citizen review",null,"area","SF Public Library scans: Objectives and policies, Mission Bay, San Francisco : proposal for citizen ","https://archive.org/details/objectivespolici3019sanf","ia:objectivespolici3019sanf","showcase_search"],["1985","documented in","South of Market rezoning study : housing, business activity, neighborhood livability, research findings",null,"area","Democracy's Library: South of Market rezoning study : housing, business activity, neighborhood livab","https://archive.org/details/C124884194/page/n104","ia:C124884194","x_dl_facts"],["1985","documented in","Recreation and open space element : proposal for citizen review : executive summary",null,"area","Democracy's Library: Recreation and open space element : proposal for citizen review : executive sum","https://archive.org/details/C124879800/page/n4","ia:C124879800","x_dl_facts"],["1985","proposed","maximum public access in future Port and private development",null,"area","Democracy's Library: Recreation and open space element of the master plan : proposal for citizen rev","https://archive.org/details/C124879916/page/n26","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1985","concerns place","Background and preliminary findings report, Mission Bay, San Francisco : draft working paper",null,"area","SF Public Library scans: Background and preliminary findings report, Mission Bay, San Francisco : dr","https://archive.org/details/backgroundprelim8198sanf","ia:backgroundprelim8198sanf","showcase_search"],["1985","concerns place","DTIC ADA159991: Proceedings of the Meeting of the Coastal Engineering Research Board (43rd) Held at Vicksburg, Mississippi on 22-24 May 1985.",null,"area","Books and texts: DTIC ADA159991: Proceedings of the Meeting of the Coastal Engineering Research Boar","https://archive.org/details/DTIC_ADA159991","ia:DTIC_ADA159991","showcase_search"],["1985","documented in","Recreation and open space element of the master plan : proposal for citizen review",null,"area","Democracy's Library: Recreation and open space element of the master plan : proposal for citizen rev","https://archive.org/details/C124879916/page/n43","ia:C124879916","x_dl_facts"],["1985","described in","Housing opportunity areas with little open space that would require parks if developed: Rincon Hill, Mission Bay, Rincon Point-South Beach Redevelopment areas, and other S.F. Redevelopment Agency sites",null,"area","Democracy's Library: Recreation and open space element : proposal for citizen review : executive sum","https://archive.org/details/C124879800/page/n4","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1985","documented in","Report on the 1984 South of Market artist live/work space survey",null,"area","Democracy's Library: Report on the 1984 South of Market artist live/work space survey","https://archive.org/details/C124884006/page/n18","ia:C124884006","x_dl_facts"],["1985","described in","Expected to provide large floor space for back office, business service, manufacturing and wholesale/distribution activities",null,"area","Democracy's Library: South of Market rezoning study : housing, business activity, neighborhood livab","https://archive.org/details/C124884194/page/n104","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1985","described in","comprehensive public planning process initiated",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n8","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1985","described in","about 10,000 jobs higher than ABAG projections",null,"area","Democracy's Library: San Francisco housing needs to 1995 : a component of the 1989-90 revisions of t","https://archive.org/details/C124894743/page/n26","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1985","documented in","San Francisco housing needs to 1995 : a component of the 1989-90 revisions of the residence element of the master plan and background for the Mayor's Housing Advisory Committee report",null,"area","Democracy's Library: San Francisco housing needs to 1995 : a component of the 1989-90 revisions of t","https://archive.org/details/C124894743/page/n26","ia:C124894743","x_dl_facts"],["1985","described in","Redevelopment of China Basin and the Mission Bay area is being considered",null,"area","Democracy's Library: Recreation and open space element of the master plan : proposal for citizen rev","https://archive.org/details/C124879916/page/n43","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1985","described in","developments to the south of the SOM area",null,"area","Democracy's Library: Report on the 1984 South of Market artist live/work space survey","https://archive.org/details/C124884006/page/n18","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1986","concerns place","The Potrero View (February 1986)",null,"area","Books and texts: The Potrero View (February 1986)","https://archive.org/details/potreroviewfebru11unse","ia:potreroviewfebru11unse","showcase_search"],["1986","described in","108 employment, Manufacturing Construction (4 businesses)",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n258","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1986","described in","City could not approve the currently proposed office components of both projects in one year without a separate vote of the people",null,"area","Democracy's Library: Legal effect of Proposition M","https://archive.org/details/C124889370/page/n4","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1986","concerns place","Choices for Mission Bay : planning considerations and alternative plans, Mission Bay, San Francisco : [draft] working paper",null,"area","SF Public Library scans: Choices for Mission Bay : planning considerations and alternative plans, Mi","https://archive.org/details/choicesformissio1986sanf","ia:choicesformissio1986sanf","showcase_search"],["1986","described in","mixture of office development and other uses",null,"area","Democracy's Library: Legal effect of Proposition M","https://archive.org/details/C124889370/page/n36","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1986","concerns place","Canal system, Mission Bay, San Francisco",null,"area","SF Public Library scans: Canal system, Mission Bay, San Francisco","https://archive.org/details/canalsystemmissi1986sanf","ia:canalsystemmissi1986sanf","showcase_search"],["1986","concerns place","Choices for Mission Bay : planning considerations, Mission Bay, San Francisco : draft",null,"area","SF Public Library scans: Choices for Mission Bay : planning considerations, Mission Bay, San Francis","https://archive.org/details/choicesformissio1119sanf","ia:choicesformissio1119sanf","showcase_search"],["1986","concerns place","Commercial building prototypes for Mission Bay",null,"area","SF Public Library scans: Commercial building prototypes for Mission Bay","https://archive.org/details/commercialbuildi1619else","ia:commercialbuildi1619else","showcase_search"],["1986","concerns place","Soil conditions, Mission Bay, San Francisco",null,"area","SF Public Library scans: Soil conditions, Mission Bay, San Francisco","https://archive.org/details/soilconditionsmi86sanf","ia:soilconditionsmi86sanf","showcase_search"],["1986","concerns place","Noise/buffering, Mission Bay, San Francisco",null,"area","Open Library: Noise/buffering, Mission Bay, San Francisco","https://openlibrary.org/works/OL22948067M","web:openlibrary.org/works/OL22948067M","showcase_search"],["1986","described in","39 employment, Offices (8 businesses)",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n258","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1986","described in","Environmental Review application submitted by Santa Fe Pacific Realty Corporation, case 86.505E",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n44","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1986","described in","32 employment, Warehouse and Distribution (5 businesses)",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n258","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1986","concerns place","The Potrero View (March 1986)",null,"area","Books and texts: The Potrero View (March 1986)","https://archive.org/details/potreroviewmarch22unse","ia:potreroviewmarch22unse","showcase_search"],["1986","described in","3 employment, Vehicle and Equipment Storage (4 businesses)",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n258","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1986","concerns place","Seismic safety, Mission Bay, San Francisco",null,"area","SF Public Library scans: Seismic safety, Mission Bay, San Francisco","https://archive.org/details/seismicsafetymis1986eqee","ia:seismicsafetymis1986eqee","showcase_search"],["1986","described in","497 employment, Transportation (18 businesses)",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n258","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1986","described in","Transportation: 18 businesses",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n258","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1986","described in","office component cannot be approved in one year without a separate vote of the people",null,"area","Democracy's Library: Legal effect of Proposition M","https://archive.org/details/C124889370/page/n34","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1986","described in","office development portion exceeds 400,000 square feet",null,"area","Democracy's Library: Legal effect of Proposition M","https://archive.org/details/C124889370/page/n36","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1986","documented in","Legal effect of Proposition M",null,"area","Democracy's Library: Legal effect of Proposition M","https://archive.org/details/C124889370/page/n36","ia:C124889370","x_dl_facts"],["1986","concerns place","Retail demand : a retail analysis for Mission Bay planning",null,"area","SF Public Library scans: Retail demand : a retail analysis for Mission Bay planning","https://archive.org/details/retaildemandreta1986edaw","ia:retaildemandreta1986edaw","showcase_search"],["1987","documented in","Issues report for the South Bayshore Study Area",null,"area","Democracy's Library: Issues report for the South Bayshore Study Area","https://archive.org/details/C124902184/page/n154","ia:C124902184","x_dl_facts"],["1987","documented in","Historic preservation in San Francisco : an evaluation of programs affecting historic resources for the National Trust for Historic Preservation and the San Francisco Department of City Planning",null,"area","Democracy's Library: Historic preservation in San Francisco : an evaluation of programs affecting hi","https://archive.org/details/C124889732/page/n166","ia:C124889732","x_dl_facts"],["1987","described in","In 1987 proposal: about seven million square feet of commercial and industrial space up to eight stories, 7,700 housing units",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n45","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1987","concerns place","The Potrero View (July 1987)",null,"area","Books and texts: The Potrero View (July 1987)","https://archive.org/details/potreroviewjuly106unse","ia:potreroviewjuly106unse","showcase_search"],["1987","concerns place","The Potrero View (February 1987)",null,"area","Books and texts: The Potrero View (February 1987)","https://archive.org/details/potreroviewfebru01unse","ia:potreroviewfebru01unse","showcase_search"],["1987","concerns place","The Potrero View (March 1987)",null,"area","Books and texts: The Potrero View (March 1987)","https://archive.org/details/potreroviewmarch02unse","ia:potreroviewmarch02unse","showcase_search"],["1987","described in","planning consultants to Santa Fe/Southern Pacific",null,"area","Democracy's Library: [Study of the San Francisco juvenile probation system] : [fact sheets]","https://archive.org/details/C124889185/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1987","area","multi-use community proposed for a 330 acre site",null,"area","Democracy's Library: Issues report for the South Bayshore Study Area","https://archive.org/details/C124902184/page/n154","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1987","described in","$85,200,000 (≈ $252.7 million in 2026 dollars) based on 1987 cost estimates by Department of Public Works",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1987","described in","special historic/architectural review of public works affecting such resources",null,"area","Democracy's Library: Historic preservation in San Francisco : an evaluation of programs affecting hi","https://archive.org/details/C124889732/page/n166","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1987","described in","$24,900,000 (≈ $73.9 million in 2026 dollars) based on 1987 cost estimates by Public Utilities Commission",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1987","concerns place","The Mission Bay plan : proposal for citizen review",null,"area","SF Public Library scans: The Mission Bay plan : proposal for citizen review","https://archive.org/details/missionbayplanpr1987sanf","ia:missionbayplanpr1987sanf","showcase_search"],["1987","documented in","[Study of the San Francisco juvenile probation system] : [fact sheets]",null,"area","Democracy's Library: [Study of the San Francisco juvenile probation system] : [fact sheets]","https://archive.org/details/C124889185/page/n12","ia:C124889185","x_dl_facts"],["1987","units","7,700 housing units (2,300 affordable, averaging $125,000 (≈ $370,753 in 2026 dollars))",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n33","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1987","described in","Specific Plan based largely upon original Mission Bay Plan released January 1987",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n10","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1988","concerns place","Mission Bay : draft environmental impact report",null,"area","SF Public Library scans: Mission Bay : draft environmental impact report","https://archive.org/details/missionbaydraft1219sanf_1","ia:missionbaydraft1219sanf_1","showcase_search"],["1988","concerns place","Telegraph Hill Semaphore",null,"area","Books and texts: Telegraph Hill Semaphore","https://archive.org/details/semaphore105tele","ia:semaphore105tele","showcase_search"],["1988","concerns place","The Potrero View (September 1988)",null,"area","Books and texts: The Potrero View (September 1988)","https://archive.org/details/potreroviewsepte98unse","ia:potreroviewsepte98unse","showcase_search"],["1988","concerns place","Mission Bay : draft environmental impact report",null,"area","SF Public Library scans: Mission Bay : draft environmental impact report","https://archive.org/details/missionbaydraft1219sanf_0","ia:missionbaydraft1219sanf_0","showcase_search"],["1988","described in","$2 billion (≈ $5.7 billion in 2026 dollars)",null,"area","Democracy's Library: South of Market plan","https://archive.org/details/c124899406/page/n30","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1988","concerns place","Mission Bay : draft environmental impact report",null,"area","SF Public Library scans: Mission Bay : draft environmental impact report","https://archive.org/details/missionbaydrafte1219sanf","ia:missionbaydrafte1219sanf","showcase_search"],["1988","described in","effect on relocating heavy industries into South Bayshore",null,"area","Democracy's Library: South Bayshore plan : a proposal for citizen review","https://archive.org/details/C124905627/page/n132","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1988","concerns place","Mission Bay : draft environmental impact report",null,"area","SF Public Library scans: Mission Bay : draft environmental impact report","https://archive.org/details/missionbaydraft1219sanf_2","ia:missionbaydraft1219sanf_2","showcase_search"],["1988","described in","8,800 (OCR: 8.800) potential units, selected mixed residential-commercial use area",null,"area","Democracy's Library: An affordable housing action plan for San Francisco : draft report","https://archive.org/details/C124894734/page/n88","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1988","documented in","South of Market plan",null,"area","Democracy's Library: South of Market plan","https://archive.org/details/c124899406/page/n30","ia:c124899406","x_dl_facts"],["1988","concerns place","The Potrero View (December 1988)",null,"area","Books and texts: The Potrero View (December 1988)","https://archive.org/details/potreroviewdecem11unse_1","ia:potreroviewdecem11unse_1","showcase_search"],["1989","described in","Planning effort initiated or completed; no actual units produced during reporting period",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : final draft fo","https://archive.org/details/C124925579/page/n205","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1989","documented in","An affordable housing action plan for San Francisco : draft report",null,"area","Democracy's Library: An affordable housing action plan for San Francisco : draft report","https://archive.org/details/C124894734/page/n55","ia:C124894734","x_dl_facts"],["1989","described in","Department of City Planning negotiating a Development Agreement with Santa Fe Pacific and reviewing responses to the draft EIR",null,"area","Democracy's Library: An affordable housing action plan for San Francisco : draft report","https://archive.org/details/C124894734/page/n119","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1989","described in","1989 Average Market Rate Rent $939 (≈ $2,552 in 2026 dollars), citywide average $819 (≈ $2,225 in 2026 dollars)",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n110","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1989","described in","approximately $90 million (≈ $244.6 million in 2026 dollars) (1989 dollars) city subsidy",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n4","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1989","described in","at least half of job types in services and retail sectors fall below $25,000 (≈ $67,931 in 2026 dollars) a year in salary",null,"area","Democracy's Library: San Francisco housing needs to 1995 : a component of the 1989-90 revisions of t","https://archive.org/details/C124894743/page/n26","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1989","described in","annual net fiscal balance slightly positive in initial years with first year surplus of approximately $100,000 (≈ $271,726 in 2026 dollars)",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n20","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1989","described in","90 acres of underutilized sites suitable for housing",null,"area","Democracy's Library: An affordable housing action plan for San Francisco : draft report","https://archive.org/details/C124894734/page/n55","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1989","described in","privately held land not zoned residential; major land resource for affordable housing for next 20 years",null,"area","Democracy's Library: An affordable housing action plan for San Francisco : draft report","https://archive.org/details/C124894734/page/n55","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1989","described in","yet to be determined amount of land as part of the Mission Bay agreement",null,"area","Democracy's Library: An affordable housing action plan for San Francisco : draft report","https://archive.org/details/C124894734/page/n63","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1989","described in","Task force created to examine parts of overall housing needs",null,"area","Democracy's Library: An affordable housing action plan for San Francisco : draft report","https://archive.org/details/C124894734/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1989","described in","Figure 6: graphic comparison of annual net fiscal effects on General Fund for Land Use Program (1989 dollars)",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n26","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1989","described in","Development Agreement Application filed by Catellus Development Corporation",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n44","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1989","documented in","Real property owned by the city and county of San Francisco / 1989",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 1989","https://archive.org/details/igsl_san-francisco-real-prop-report_1989/page/n78","ia:igsl_san-francisco-real-prop-report_1989","x_dl_facts"],["1989","described in","Potential for affordable housing, but over two-thirds of 20-year affordable housing needs must be met on other sites",null,"area","Democracy's Library: An affordable housing action plan for San Francisco : draft report","https://archive.org/details/C124894734/page/n19","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1989","proposed","Energy efficient guidelines for new construction proposed for incorporation in the plan",null,"area","Democracy's Library: South Bayshore plan : a proposal for citizen review","https://archive.org/details/C124905627/page/n120","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1989","documented in","South Bayshore plan : a proposal for citizen review",null,"area","Democracy's Library: South Bayshore plan : a proposal for citizen review","https://archive.org/details/C124905627/page/n120","ia:C124905627","x_dl_facts"],["1989","described in","Mission Bay can meet only 1/3 of need",null,"area","Democracy's Library: An affordable housing action plan for San Francisco : draft report","https://archive.org/details/C124894734/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1989","held by department","DPW",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 1989","https://archive.org/details/igsl_san-francisco-real-prop-report_1989/page/n78","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1989","described in","pending; half of the remaining housing units accounted for in Redevelopment areas and Mission Bay",null,"area","Democracy's Library: An affordable housing action plan for San Francisco : draft report","https://archive.org/details/C124894734/page/n54","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1989","described in","Development Agreement Application filed with the Department",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1989","proposed","Mixed use housing and commercial development with 8,000 to 10,000 housing units, 30% for low and moderate income households",null,"area","Democracy's Library: An affordable housing action plan for San Francisco : draft report","https://archive.org/details/C124894734/page/n119","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1989","concerns place","Glen Park News",null,"area","Books and texts: Glen Park News","https://archive.org/details/glenparknews1989unse","ia:glenparknews1989unse","showcase_search"],["1990","described in","$1 (≈ $2.58 in 2026 dollars) per square foot on office, commercial/light industrial, and hotel uses, totalling $6.1 million (≈ $15.7 million in 2026 dollars)",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$3.1 million (≈ $8.0 million in 2026 dollars)",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Median household income TOTAL $35,726 (≈ $92,100 in 2026 dollars) (106.92% of citywide median)",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n107","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","10.8 acre wetlands",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","500-room hotel",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about 26 acres of land dedicated to the City",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","at least $2.4 million (≈ $6.2 million in 2026 dollars) in-lieu fee to City child care fund",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n15","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Alternatives with the highest commercial densities generate the largest fiscal surpluses",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n24","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","City Planning Commission adopted the resolution",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n49","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","More than two miles of shoreline along the Bay and China Basin Channel to be reclaimed as parks, plazas, playfields and promenades",null,"segment","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n40","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Amendments to Maps 2, 3, 4 and 5 related to Mission Bay Plan",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between A","https://archive.org/details/C124922683/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","standards for minority business participation",null,"area","Democracy's Library: Getting things done : visions & goals for San Francisco : a two-year progress r","https://archive.org/details/C124904562/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","800 units built directly by the Project Sponsor",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n4","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","190.6 acres, 60.5%, City",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n4","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","approved by the City and incorporated into the General Plan",null,"area","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n110","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Land dedications by Project Sponsor to City provide sites for City-subsidized affordable housing",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n10","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","150 housing units per 107,000 sq ft of office and commercial/light industrial space",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n19","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","four Project Alternatives considered in the EIR",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n24","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Amendments adopting Mission Bay Plan related changes to Map 4 Citywide Recreation and Open Space Plan",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n10","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","TOTAL ACREAGE 314.8 (100.0%)",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n4","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","22 acres licensed to Catellus for parks",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n20","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","maximize access to Mission Bay areas south of China Basin Channel by strengthening freeway structures and bridges and providing redundant roadway connections",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n19","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","3,000 affordable homes on-site plus 250 off-site",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n30","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Open Space 67.9 acres including 4.7 acres in commercial and residential areas",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n30","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Transit Preferential Streets, Rapid Transit, Signed Bikeways and Preferred Commute Bike Route maps amended",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","lien-to-value ratio just over 10 percent",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Commission continued Mission Bay matters to September 27, 1990 at 11:00 am",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n35","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","General Fund revenues exceed public service and maintenance costs by over $13 million (≈ $33.5 million in 2026 dollars) annually at maturity",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Mission Bay Plan adopted as part of the Master Plan",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n48","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$4.5 million (≈ $11.6 million in 2026 dollars) cultural center/theater",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","construction of housing, some of which must be affordable housing",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n56","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Hotel 400,000 sq. ft, 500 rooms",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n30","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$9.3 million (≈ $24.0 million in 2026 dollars) school fee paid by Catellus",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n15","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","580 building maintenance, security and parking jobs",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n44","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Commission certified the Final Environmental Impact Report by Motion No. 12006",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n34","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","24 acres of former street lands transferred from City to Catellus",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n15","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Planning Commission reviewed and considered the Mission Bay FEIR; Motion No. 12006 certified the EIR",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n354","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","68 acres total open space",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","SCH No. 86070113, certified August 23, 1990, Department of City Planning",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n771","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Department presented Mission Bay Master Plan to public and Commission",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n47","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$2 (≈ $5.16 in 2026 dollars) per sq. ft. of office space",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n3","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","3,000 affordable dwellings",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n9","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","nearly 80 percent (approximately $231 million (≈ $595.5 million in 2026 dollars)) of Mission Bay financing costs",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Affordable housing on- and off-site must represent 37.5% of the total housing",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n50","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$60 million (≈ $154.7 million in 2026 dollars) ($2 million (≈ $5.2 million in 2026 dollars) a year for 30 years, escalated) to Port for open space lands",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n24","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about $125 million (≈ $322.2 million in 2026 dollars) surplus if the $90 million (≈ $232.0 million in 2026 dollars) housing program were deducted",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n3","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","at least ten percent of affordable housing accessible to handicapped persons",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Adopting amendments related to Mission Bay Plan (Resolution R 12040)",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","3,100 commercial/light industrial jobs",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n44","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","2 miles of walking/jogging paths, park pathways and along shorelines",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","80 units per acre housing density",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Generalized Residential Use Plan Map and Residential Density Plan Maps reflecting Mission Bay adopted",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n38","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Port licenses 22 acres of land to Catellus for parks",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Adopting amendments related to Mission Bay Plan (Resolution R 12040)",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","MUNI Metro and six other transit lines serving Mission Bay",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n10","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","maximum acceptable lien-to-value ratio in the range of 25 percent",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about $10 million (≈ $25.8 million in 2026 dollars) from $2 (≈ $5.16 in 2026 dollars) per sq. ft. of office space",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","all significant environmental effects analyzed in the FEIR; no additional information required",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n36","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","documented in","Final report Balboa and Francisco Reservoirs needs assessment",null,"area","Democracy's Library: Final report Balboa and Francisco Reservoirs needs assessment","https://archive.org/details/C124904960/page/n176","ia:C124904960","x_dl_facts"],["1990","described in","workshops and duly noticed public hearings, totaling over 70 hours",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n46","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Public Facilities 16 acres (public use site, police, fire, school, pump station)",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n30","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","initial goals of at least 20% MBE and 6% WBE; targets of 30% MBE and 9% WBE in contracts",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n18","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Generally bounded by Third Street, Berry Street, Fourth Street, the China Basin Channel, China Basin Street, Mariposa Street, Pennsylvania Street, Seventh Street, and Townsend Street; Assessor's Blocks 3795-3798, 3804-3806, 3809, 3810, 3813, 3819, 3822, 3832, 3835, 3837-3841, 3849-3853, 3880…",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Mission Bay Plan approved by the City",null,"area","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n114","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","at least 8,200 housing units on-site",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n10","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","2,000 units commenced within ten years",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","concerns place","North Mission News",null,"area","Books and texts: North Mission News","https://archive.org/details/northmissionnew1990unse_9","ia:northmissionnew1990unse_9","showcase_search"],["1990","concerns place","Mission Bay plan : proposal for adoption",null,"area","SF Public Library scans: Mission Bay plan : proposal for adoption","https://archive.org/details/missionbayplanpr1990sanf","ia:missionbayplanpr1990sanf","showcase_search"],["1990","described in","3,250 affordable units",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","one acre of public open space per 107,000 sq ft of office and commercial/light industrial space",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n19","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","documented in","Amendments to the master plan adopted between September 1988 and March 1995",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n32","ia:C124914759","x_dl_facts"],["1990","area","67.9 acres dedicated to parks, open space and wetlands",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","12.5 acres",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n40","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","childcare facilities for about 1,000 children",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","423-635 construction jobs per year during construction over 20-30 years",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n44","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$4 million (≈ $10.3 million in 2026 dollars) to 250 affordable units off-site",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n30","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","as much as another 6 inches of total settlement",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n760","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Amending Map 2 Generalized Land Use Plan, p. 1.1.7; and Map 3 Residential Density Plan, p. 1.1.9",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n4","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","dedicating 30+ acres of its land for parks",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Revised Mission Bay Plan and documents made available to public and Commission",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n47","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","subsidized units would range in price from $50,000 (≈ $128,898 in 2026 dollars) to $147,000 (≈ $378,961 in 2026 dollars)",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about 20% of project area allocated to open space",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n8","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","no taller than 45 feet, three and four stories",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n11","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","8,520 total homes including off-site",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n30","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Small parks associated with other development; acreages included in the land distribution table",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n21","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$4.5 million (≈ $11.6 million in 2026 dollars), 200-seat theater, exhibition space, community meeting rooms",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n48","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$30 million (≈ $77.3 million in 2026 dollars) security provided by Catellus to the City",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n54","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Nearly 11 acres of wetland park",null,"corner","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n41","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","concerns place","Mission Bay : final environmental impact report",null,"area","SF Public Library scans: Mission Bay : final environmental impact report","https://archive.org/details/missionbayfinal1990sanf_1","ia:missionbayfinal1990sanf_1","showcase_search"],["1990","documented in","Seismic retrofitting alternatives for San Francisco's unreinforced masonry buildings : socioeconomic and land use implications of alternative requirements",null,"area","Democracy's Library: Seismic retrofitting alternatives for San Francisco's unreinforced masonry buil","https://archive.org/details/C124905937/page/n200","ia:C124905937","x_dl_facts"],["1990","described in","one acre of open space for every 150 dwellings",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n3","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about 4,800 parking spaces",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n13","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","concerns place","Fiscal and financial evaluation of the Mission Bay Project",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391","ia:C124903391","showcase_search"],["1990","concerns place","The Potrero View (February 1990)",null,"area","Books and texts: The Potrero View (February 1990)","https://archive.org/details/potreroviewfebru01unse_2","ia:potreroviewfebru01unse_2","showcase_search"],["1990","described in","7.5 miles of improved streets",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","2,200 units built by City",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Catellus to construct cultural center by certificates of occupancy for 2,000 housing units",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n22","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","No new duplicative fees on negotiated public benefits during first 15 years of project",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n22","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Average Price $80,000 (≈ $206,237 in 2026 dollars) (1990 proposal)",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Resolution No. 12008 directing modification of proposed Mission Bay Plan and Master Plan Amendments",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n35","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","16 acres dedicated by Catellus for a new Mission Bay street",null,"street","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n15","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","documented in","Report to the Board of Supervisors, city and county of San Francisco : review and analysis of the Deputy Mayor function in the Office of the Mayor",null,"area","Democracy's Library: Report to the Board of Supervisors, city and county of San Francisco : review a","https://archive.org/details/C124902980/page/n78","ia:C124902980","x_dl_facts"],["1990","described in","peak period goal of 68% transit, 18% rideshare, 1.4 persons per auto",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","amendments to five Master Plan elements adopted for consistency (Exhibit 3)",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n49","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Mission Bay Plan dated September 20, 1990, adopted as part of the Master Plan",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n48","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","geo-seismic measures incorporated as requirements for any development",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n761","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","average overall housing density of 80 units per acre",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n10","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","8,000 residential units (5,000 market rate, 3,000 affordable)",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Child care centers handling around a thousand children",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n41","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","employment goal of 75% San Francisco residents for new hires in the permanent work force",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n18","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","held by department","three acres of existing City property",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Chapter 4 - Implementation released for public review",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n33","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Pile foundations will be used",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n50","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Years of industrial uses may have polluted the land; mitigation cost uncertain but could be significant",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n8","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","4.8 million square feet of office space",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","assumed industrial buildout of Mission Bay",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n26","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","16,600 office jobs",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n44","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$22.9 million (≈ $59.0 million in 2026 dollars) for MUNI Metro extension and Metro East",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n26","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","6 miles of water lines",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Development Agreement obliges City to approve development consistent with Land Use Program",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n10","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","SFPR $8.4 million (≈ $21.7 million in 2026 dollars); City $2 million (≈ $5.2 million in 2026 dollars) for 1/2 of police station",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","approximately 11 acre area",null,"corner","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n42","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Planning Commission approved the Mission Bay Plan and related amendments",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n354","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","900,000 square feet of commercial-light industrial",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","certified August 1990",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n760","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","concerns place","Mission Bay : final environmental impact report",null,"area","SF Public Library scans: Mission Bay : final environmental impact report","https://archive.org/details/missionbayfinale1990sanf","ia:missionbayfinale1990sanf","showcase_search"],["1990","area","16 acres of anticipated office development",null,"area","Democracy's Library: Local development policy survey update for San Francisco","https://archive.org/details/C124878958/page/n17","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Comparison of City's Annual Fiscal Balance and Housing Subsidy Cost Resulting from Mission Bay Project (Figure 9)",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Streets & Transit 94.7 acres",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n30","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","3,000 units of affordable housing on-site",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n36","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","10 acres of community-serving development, post-1990 supply",null,"area","Democracy's Library: Local development policy survey update for San Francisco","https://archive.org/details/C124878958/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","piles driven to stable material for structures more than five stories or settlement over six inches",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n444","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","1 school",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","2,240 retail jobs",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n44","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Commission continued matters to September 27, 1990 at 11:00 am",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n47","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","concerns place","Tenant Times",null,"area","Books and texts: Tenant Times","https://archive.org/details/tenanttimes04sanf","ia:tenanttimes04sanf","showcase_search"],["1990","described in","$54.1 million (≈ $139.5 million in 2026 dollars) for streets, sewers and utilities paid by Catellus",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n15","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","amendments to Citywide Recreation and Open Space Plan Map 4 and Eastern Shoreline Plan Map 8",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n5","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","over $215 million (≈ $554.3 million in 2026 dollars) of fiscal benefits to the City over 30-year buildout",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","ADOPTS the Mission Bay Plan dated September 20, 1990",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n36","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Final EIR found adequate, accurate and objective; Motion No. 12006",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n46","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","half the police station, $2.0 million (≈ $5.2 million in 2026 dollars)",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","net annual balance may exceed $3.6 million (≈ $9.3 million in 2026 dollars) by end of second phase (tenth year)",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n22","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","3,000 units affordable (37.5%)",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","8,000 housing units",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","model projected public revenues and costs for a 35-year period",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n18","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","concerns place","Calendar",null,"area","SF Public Library scans: Calendar","https://archive.org/details/calendar1990sanf","ia:calendar1990sanf","showcase_search"],["1990","proposed","Amending Policies 3, 4, and 5 under Industry Objective 4, p. 1.2.13, related to Mission Bay Plan",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n9","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","total General Fund revenues will exceed $36 million (≈ $92.8 million in 2026 dollars) annually at buildout",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n20","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$12.6 million (≈ $32.5 million in 2026 dollars) in school impact fees collected from the Project",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","41,419 district jobs, 16 and over",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n112","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","13,000 sq. ft. police station",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","affordable homes will range in price between $22,000 (≈ $56,715 in 2026 dollars) and $130,000 (≈ $335,135 in 2026 dollars)",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n36","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","5,900 units on about 74 acres",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n10","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","well-designed buildings expected to sustain slight to severe damage but not collapse",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n444","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","transformed into a scenic waterway with planted south banks and public north promenade",null,"segment","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n40","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","more than 3,600 trees",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","approximately 13,000 square feet",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n48","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","New City-wide Muni Metro East underground maintenance yard in Mission Bay",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n46","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","2 softball fields, tennis and basketball courts",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Elimination of existing pollution-generating activities at Mission Bay; surface runoff quality expected to improve; impact not significant",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n463","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","1% of office and hotel construction costs",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","held by department","City",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","315 acres",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","substantial positive cost/revenue balance to the City",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n18","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","2 percent (approximately $5 million (≈ $12.9 million in 2026 dollars)) of Mission Bay financing costs, including $3 million (≈ $7.7 million in 2026 dollars) school fee for affordable housing",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about 7 acres of land at fair market value",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","public park system and community facilities such as child care centers and a police and fire station",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n56","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","8,000 total residential homes",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","one hotel (500 rooms)",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$5 million (≈ $12.9 million in 2026 dollars)",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","police and fire stations, a school, recreation, cultural, child care and seniors centers",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n8","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","2.5 acres devoted to recreation",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n41","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","soil may be contaminated with a variety of hazardous wastes from landfill and industrial and transportation uses",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n34","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$12.5 million (≈ $32.2 million in 2026 dollars)",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","public service costs step functions following budget commitments",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n20","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","1 cultural center",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","School site ready for conveyance to Unified School District when Mission Bay population reaches 1,000 students",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n22","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","370 hotel jobs",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n44","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","at least 75% of total open space open to public during daylight hours",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n38","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about 15 acres of City-owned land shared 50/50",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Hazardous Waste Mitigation Program",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n34","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Commission intended to approve Mission Bay Plan and Master Plan Amendments if modifications incorporated",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n47","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","3,000 affordable homes",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n36","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","documented in","Local development policy survey update for San Francisco",null,"area","Democracy's Library: Local development policy survey update for San Francisco","https://archive.org/details/C124878958/page/n16","ia:C124878958","x_dl_facts"],["1990","documented in","Findings and methodology for the 1990 precensus local review program",null,"segment","Democracy's Library: Findings and methodology for the 1990 precensus local review program","https://archive.org/details/C124905326/page/n24","ia:C124905326","x_dl_facts"],["1990","area","10.8 acres",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n40","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$3.3 million (≈ $8.5 million in 2026 dollars) school fee paid by the City",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n15","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","concerns place","Mission Bay status report",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704","ia:C124902704","showcase_search"],["1990","described in","750,000 SF retail",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","16,888 residents (2.33% of citywide total)",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n107","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","one housing unit for every 712 square feet of commercial development",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Catellus pays TIDF totaling $24 million (≈ $61.9 million in 2026 dollars)",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$2 (≈ $5.16 in 2026 dollars) per square foot fee on office development, totalling between $9.6 (≈ $24.75 in 2026 dollars) and 11.4 million",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","public access to China Basin Channel and San Francisco Bay through public open space along all shorelines",null,"segment","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n29","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","4.8 million square feet of office developments",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n9","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$30 million (≈ $77.3 million in 2026 dollars) financial assurance to City to guarantee remediation prior to commencing subarea toxics investigations",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n24","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$85 million (≈ $219.1 million in 2026 dollars) SFPR, $31 million (≈ $79.9 million in 2026 dollars) state and federal grants",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","adopted as part of the Master Plan by the Planning Commission",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n8","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","up to 8,270 housing units (3,000 affordable) on-site, plus 250 off-site very low income units",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n45","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","About 68 acres devoted to parks, recreation areas and open space",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n40","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$2.5 million (≈ $6.4 million in 2026 dollars) for Economic Development Fund within 6 months",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n24","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","The Department of City Planning",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n50","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","conveyed","Port would license 22 acres to Project Sponsor to be developed as parks",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n10","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$4.5 million (≈ $11.6 million in 2026 dollars)",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$60 million (≈ $154.7 million in 2026 dollars) lease term cost for 22 acres of open space",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Site is 315 acres and lacks the infrastructure necessary for proposed development",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n8","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Backup cisterns or water storage tanks throughout the project area",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n50","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","planned for 26,000 sq. ft.",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","fiscal impact analysis by the Budget Division",null,"area","Democracy's Library: Report to the Board of Supervisors, city and county of San Francisco : review a","https://archive.org/details/C124902980/page/n78","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","18 percent (approximately $63 million (≈ $162.4 million in 2026 dollars)) of Mission Bay financing costs",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Catellus will pay for construction of community and cultural facilities",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n48","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$2.5 million (≈ $6.4 million in 2026 dollars) initial contribution",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n17","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","nearly $300 million (≈ $773.4 million in 2026 dollars) in infrastructure, parks, community facilities and development fees",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","findings of significant environmental impacts that could not be mitigated to insignificance",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n46","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","City fiscal surpluses about $215 million (≈ $554.3 million in 2026 dollars) by project buildout",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n3","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Commercial/Industrial 900,000 sq. ft.",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n30","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","rezoned","Use Districts and Height & Bulk Districts amended for Mission Bay area",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n33","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","exempt up to 4.8 million sq ft of new office space in Mission Bay from the annual office limit",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n56","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","available for working individuals and families with incomes between $15,000 (≈ $38,669 in 2026 dollars) and $58,000 (≈ $149,522 in 2026 dollars)",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n36","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Goal of 2/3 of Mission Bay employees riding transit",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n46","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","900,000 square feet of commercial/light industrial space",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n9","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Office 4,800,000 sq. ft.",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n30","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Catellus pays all costs of investigating and remediating hazardous wastes in Mission Bay",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n54","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Generalized Residential Land Use Plan Map and Residential Density Plan Maps for Mission Bay adopted with Residence Element",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n50","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Mission Bay EIR Findings",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n52","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","concerns place","Mission Bay : a new San Francisco neighborhood",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581","ia:C124881581","showcase_search"],["1990","described in","Optional CFD mechanism to fund certain infrastructure improvements using special tax",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n10","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","315 acres",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between A","https://archive.org/details/C124922683/page/n33","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","2,300 affordable housing units on an additional 26 acres",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n10","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","3,000 affordable homes",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","approximately $300 million (≈ $773.4 million in 2026 dollars) total infrastructure, parks, and community facilities",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$5 (≈ $12.89 in 2026 dollars) per square foot of office development, totalling $24 million (≈ $61.9 million in 2026 dollars)",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","market rate housing with retail on about 12 acres",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Port transfers about 15 acres to Catellus",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","26 acres dedicated to the City for housing after hazardous waste mitigation",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n4","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Maximize access to areas south of China Basin Channel",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n50","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","about 15 acres of the 315-acre site, costs shared 50/50",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n3","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Office Affordable Housing Production Program will not be applied in Mission Bay",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","amendments related to Mission Bay Plan",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n13","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$9.3M (≈ $24.0 million in 2026 dollars)",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n5","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","4.8 million square feet of offices",null,"street","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n13","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about $60 (≈ $155 in 2026 dollars) ($2M (≈ $5.2 million in 2026 dollars)/yr. for 30 years, escalated)",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n5","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Mission Bay Plan adopted by Resolution No. 12040",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n352","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","over 3,600 street trees",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n40","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","315-acre site",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n18","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Muni will seek Federal and State funds to build the Muni Metro East maintenance yard",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n47","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","12.5-acre China Basin Channel",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","320 housing-related jobs",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n44","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$60.0 (≈ $155 in 2026 dollars)",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n5","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about 145 acres presently owned by City and Port, rising to about 189 acres",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","250 very low income housing units off-site",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n36","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","2,200 affordable units",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n26","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","122.6 acres, 38.9%, SFPR",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n4","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","up to eight stories (110 feet)",null,"street","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n13","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","16 acres of affordable housing lands provided by Catellus",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n15","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","at least 20% Minority-owned Business Enterprises",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n34","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about $60 million (≈ $154.7 million in 2026 dollars) over 30 years",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n20","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Sub-area about 17 acres plus 300 to 500 foot buffer zone, investigated before construction",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n54","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","1% for public art in office, hotel, community facilities and open space construction",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$4.5 million (≈ $11.6 million in 2026 dollars)",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n41","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","adopted by Resolution No. 12040 and amended in 1995",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n329","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","up to 21,350 sq. ft. child care facilities",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n15","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","8,200 to 8,270 units on-site in the proposed plan",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n8","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","68 acres of parks and open space",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n24","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","At least 75% of the total open space shall be open to the public during daylight hours",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n50","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$3.3 million (≈ $8.5 million in 2026 dollars)",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","six-acre portion purchased by the City",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","5,200 market rate housing units",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n10","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Catellus to provide land and funding for police and fire stations by permits for 2,000 housing units",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n22","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about 23,000 permanent private sector jobs",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n8","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","22 acres at $2 million (≈ $5.2 million in 2026 dollars) per year for 30 years (or $60 million (≈ $154.7 million in 2026 dollars))",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","0.9 acres",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n40","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","hire 75% San Francisco residents",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n34","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","settlement of as much as another 6 inches expected during the next 30 years",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n760","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","City Planning Commission adopted Resolution Nos. 12040 and 12041 approving Mission Bay Documents",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n100","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Adoption of Mission Bay Plan as Part 2 of the Central Waterfront Plan",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between A","https://archive.org/details/C124922683/page/n13","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","about 15 acres of the 315-acre site",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about $5 million (≈ $12.9 million in 2026 dollars) annually over the 30 year buildout",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n11","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","2 fountains",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","City cash subsidy estimated at $90 million (≈ $232.0 million in 2026 dollars)",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Ballot measure under Proposition M to consider exemption from annual office limitation provisions",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n0","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","15,500 to 36,600 sq.ft. of child care in office areas",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$3.3 million (≈ $8.5 million in 2026 dollars) for affordable housing School Impact Fee",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n26","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Mission Bay Plan, a Specific Plan added to the Master Plan for the Project area",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n45","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Port licenses about 22 acres to Catellus for parks",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$2.5 million (≈ $6.4 million in 2026 dollars) plus $2 (≈ $5.16 in 2026 dollars)/sq. ft. office, $12.1 (≈ $31.19 in 2026 dollars)-$13.9M (≈ $35.8 million in 2026 dollars) total",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n20","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Presentation of proposed land use plan and program by City agencies (City Planning Commission workshop)",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n0","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","85,000 square feet available for other community facilities",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n9","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","One housing unit for every 712 sq.ft. commercial",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","An increase in parking and turnaround areas will be considered part of Mission Bay Green",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n50","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$3.3M (≈ $8.5 million in 2026 dollars)",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n5","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","24,000 jobs",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","67 acres of parks in the 1990 vision",null,"area","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n110","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","68 acres of parks, including wetlands",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","about sixty-eight (68) acres of open space",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n29","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","1,771 district residents (20.47%) work in the district",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n107","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Amended to reflect the Mission Bay Plan (Resolution No. 12040)",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n198","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Revised Mission Bay Plan made available to the public and the Commission",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n35","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","maximum of about $14 million (≈ $36.1 million in 2026 dollars) at buildout",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","City will allow expansion of existing non-conforming uses within Mission Bay until Project Sponsor proceeds with development",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n38","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","15.5 acres",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n40","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","office, housing, retail and light industrial uses, expanded transit service, street improvements, parks and other community facilities",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n56","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Catellus pays City's Transit Impact Development Fee (TIDF)",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","up to ten stories (110 feet)",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n11","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Hazardous wastes in the soil must be mitigated prior to the changes in use proposed for Mission Bay",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n4","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","new housing/commercial demands not expected to exceed previous industrial demands; model not adjusted",null,"area","Democracy's Library: Final report Balboa and Francisco Reservoirs needs assessment","https://archive.org/details/C124904960/page/n176","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","About 200 affordable housing units for seniors",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n37","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Total Land Area 313.3 acres",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n30","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","one acre for every 150 dwellings",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$12.6 million (≈ $32.5 million in 2026 dollars), probably an Elementary School",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n48","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","concerns place","Mission Bay : final environmental impact report",null,"area","SF Public Library scans: Mission Bay : final environmental impact report","https://archive.org/details/missionbayfinal1990sanf_0","ia:missionbayfinal1990sanf_0","showcase_search"],["1990","described in","annual subsidy costs average $3 million (≈ $7.7 million in 2026 dollars) under cash approach",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","School District to construct school on site dedicated by Project Sponsor",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$12.9 million (≈ $33.3 million in 2026 dollars) and 3 acres of land for community and cultural facilities",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n24","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","1% of construction costs",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","approximately 16,000 residents",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Fiscal and financial evaluation prepared for the City of San Francisco",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n0","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","cumulative annual fiscal surpluses over 30-year buildout total $215 million (≈ $554.3 million in 2026 dollars)",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n22","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","8,450 to 8,520 dwelling units on- and off-site",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","4,250,000 sq.ft. office space",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Commission found FEIR complied with CEQA by Motion No. 12006",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n100","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","13,815,000 sq.ft. total space",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Retail 750,000 sq. ft.",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n30","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Persons per Housing Unit 2.20; citywide average 2.20",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n110","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","23,210 permanent private sector workers",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n44","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Kings Street Office 4-8 Floors",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n1","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","could be expanded by approximately 1-2 acres if the Port tenant relocates",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n42","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","3,000 affordable housing units",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n4","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$31 million (≈ $79.9 million in 2026 dollars) estimated",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n40","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","forecasts and impact assessment prepared",null,"area","Democracy's Library: Seismic retrofitting alternatives for San Francisco's unreinforced masonry buil","https://archive.org/details/C124905937/page/n200","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","new Railway light rail facility proposed under the Mission Bay area development plan",null,"area","Democracy's Library: Report to the Board of Supervisors, city and county of San Francisco : review a","https://archive.org/details/C124902980/page/n94","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","comprehensive economic development, affirmative action and job training program",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n17","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about 16,000 people",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n9","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Amendments adopting revisions related to Mission Bay Plan (R 12040)",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between A","https://archive.org/details/C124922683/page/n3","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Labor force 8,652 (2.10% of citywide total)",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n107","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","34 liveaboards",null,"segment","Democracy's Library: Findings and methodology for the 1990 precensus local review program","https://archive.org/details/C124905326/page/n24","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Project Sponsor will investigate and mitigate hazardous wastes on Western Pacific Property it will exchange with the Port",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n34","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","up to 750,000 square feet of retail",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n45","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","SFPR $9.3 million (≈ $24.0 million in 2026 dollars) school impact fee; City $3.3 million (≈ $8.5 million in 2026 dollars) school fee",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","over $231 million (≈ $595.5 million in 2026 dollars)",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","500-room hotel",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n9","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","approximately 23,000 private sector employees",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","City fiscal surplus of maximum about $14 million (≈ $36.1 million in 2026 dollars) at buildout",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n3","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","concerns place","Mission Bay : final environmental impact report",null,"area","SF Public Library scans: Mission Bay : final environmental impact report","https://archive.org/details/missionbayfinal1990sanf_3","ia:missionbayfinal1990sanf_3","showcase_search"],["1990","described in","assumed buildout period of 30 years",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n24","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about 23,210 permanent private sector workers",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n13","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","documented in","Fiscal and financial evaluation of the Mission Bay Project",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n16","ia:C124903391","x_dl_facts"],["1990","described in","$2 million (≈ $5.2 million in 2026 dollars), City pays half",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n48","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","City provides 50 percent of cost, $2 million (≈ $5.2 million in 2026 dollars)",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Mission Bay Final Environmental Impact Report, Department of City Planning",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n545","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$30M (≈ $77.3 million in 2026 dollars) Letter of Credit",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n3","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$31 million (≈ $79.9 million in 2026 dollars) for road, bridge and freeway improvements",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","800 affordable units created by Project Sponsor",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$2 million (≈ $5.2 million in 2026 dollars) for 125 off-site very low income units within 6 months",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n24","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","26,000-square foot, 200-seat theater/cultural center",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n41","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Amendments would add the Mission Bay Plan, a Specific Plan, to the Master Plan for the Project area",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n33","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$9 million (≈ $23.2 million in 2026 dollars)",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","documented in","Getting things done : visions & goals for San Francisco : a two-year progress report",null,"area","Democracy's Library: Getting things done : visions & goals for San Francisco : a two-year progress r","https://archive.org/details/C124904562/page/n28","ia:C124904562","x_dl_facts"],["1990","described in","$1.56 (≈ $4.02 in 2026 dollars) per square foot of residential development",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about $10 million (≈ $25.8 million in 2026 dollars) building-based contribution over buildout",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n17","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","annual shortfalls of approximately $0.5 million (≈ $1.3 million in 2026 dollars) during first 2 or 3 years under debt subsidy approach",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Mission Bay Plan, a Specific Plan added to the Master Plan for the Project area",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n45","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$24 million (≈ $61.9 million in 2026 dollars) in transit impact development fees",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n47","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$85.2 million (≈ $219.6 million in 2026 dollars) total estimated basic infrastructure cost",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","about 8,270 housing units",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","contingency cost factor of 10 percent included",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Board of Supervisors expected to consider draft development agreement and related documents",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n0","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$3.3 million (≈ $8.5 million in 2026 dollars)",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n48","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$85.2 million (≈ $219.6 million in 2026 dollars) and land for infrastructure (e.g. streets, utilities, traffic signals)",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n24","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Catellus Development Corporation responsible for paying and building all parks",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n40","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","26 acres of former street lands to Catellus",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n26","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$30M (≈ $77.3 million in 2026 dollars) financial assurance",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Project Sponsor 169.3 acres; City and County 142.1 acres; other owners 1.9 acres",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","about 860 square feet average unit size",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n11","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","annual net surplus may reach $2.0 million (≈ $5.2 million in 2026 dollars) by end of fifth year",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n20","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","12.5 acres of City land occupied by China Basin Channel",null,"segment","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","8 floors",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n10","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","concerns place","Mission Bay fiscal impact",null,"area","SF Public Library scans: Mission Bay fiscal impact","https://archive.org/details/missionbayfiscal31990sanf","ia:missionbayfiscal31990sanf","showcase_search"],["1990","described in","about 68 acres of public open space and parks",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","hazardous waste mitigation shared equally by City and Project Sponsor",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n34","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","4.4 miles of sewer lines",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$9.6 (≈ $24.75 in 2026 dollars)-$11.4M (≈ $29.4 million in 2026 dollars) total",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n5","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","22 acres",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n5","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","hazardous waste mitigation and additional foundation costs add significantly to private sector development costs",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","314.8 acres site size",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","1% set-aside of office, hotel, community facility and park construction costs",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n20","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Map 5 Waste Water And Solid Waste Facilities Plan, p. I 7.23",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between A","https://archive.org/details/C124922683/page/n8","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$150 million (≈ $386.7 million in 2026 dollars) for 2,200 affordable units",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n26","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","certified August 1990",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n443","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","800 units",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n30","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","12.7 acres",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n40","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","about 68 acres of parks and open space",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n9","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","new CalTrain Station within Mission Bay",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n8","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","one- to two-story structures on spread footings or stiffened slabs where settlement is not excessive",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n444","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","8,270 total homes",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n36","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","313 acres",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$4.5 million (≈ $11.6 million in 2026 dollars) for 10 child care centers",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n48","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","affordable housing on- and off-site must represent 37.5% of total housing",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n38","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","up to 8,270 housing units on-site (3,000 affordable)",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n33","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$4 million (≈ $10.3 million in 2026 dollars) to help finance 250 very low income housing units off-site",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n29","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","26 acres of clean, improved affordable housing land to City",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n24","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","6.1 million square feet of commercial development",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n9","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$54.1 million (≈ $139.5 million in 2026 dollars) total",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n20","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","2,200 affordable housing units constructed by City",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Mission Bay proposal",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","8,000 housing units (3,000 affordable), 4.8 million square feet of office, 900,000 square feet of commercial/light industrial, 735,000 square feet of retail, 500-room hotel",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n45","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","additional funding of $7 million (≈ $18.0 million in 2026 dollars) ($1 million (≈ $2.6 million in 2026 dollars) per year) required under cash scenario",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","total new office space in Mission Bay deducted from annual limit at 200,000 sq ft each year",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n56","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","EIR Mitigation Monitoring Program attached to Planning Commission Resolution",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n52","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Mission Bay Plan - Proposal for Adoption Chapters 1, 2 and 3 released for public review",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n44","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","400,000 square foot hotel",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n9","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","Housing Units 7,721, 2.35% of citywide total",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n110","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","child care and TIDF fees could increase once every 5 years for first 15 years",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Amendments to Map 5 Waste Water And Solid Waste Facilities Plan and Map 6 Public Schools Facilities Plan",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","7,700 housing units (total, 1990)",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n110","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","8,270 homes on-site including 100 live-work",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n30","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","estimated $31 million (≈ $79.9 million in 2026 dollars) construction costs for parks",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$54 million (≈ $139.2 million in 2026 dollars), including the I-280 freeway regional transportation connections",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Adopting amendments related to Mission Bay Plan: amending Map 2 Generalized Land Use Plan, p. I.1.7; and Map 3 Residential Density Plan, p. 1.1.9",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n8","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Adopted as part of the 1990 Mission Bay FEIR",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n462","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","City fiscal surpluses add to about $215 million (≈ $554.3 million in 2026 dollars) by buildout",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","at least 53% of employees commute by public transit at buildout",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$100 million (≈ $257.8 million in 2026 dollars) total over 30 years after escalation",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","major waterfront park system, affordable housing plan, cultural center, child care, school site and hazardous materials remediation plan",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n46","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Two miles of park pathways along original Bay shoreline",null,"segment","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n41","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","4.8 MSF secondary or back offices",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","dedicates 16 acres of new streets to City",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","1 recreation center",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Housing Units per Acre 3.60; citywide average 11.00",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n110","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","mix of housing, transportation and office space",null,"area","Democracy's Library: Getting things done : visions & goals for San Francisco : a two-year progress r","https://archive.org/details/C124904562/page/n26","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","amendments to Industry Objective 4 policies and Commerce and Industry land use maps",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n5","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","1 fire station",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about 69 acres of publicly-accessible open space and parks",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n45","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","14 acres for public facilities",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","2,000 housing units with 740 affordable units within 10 years",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n24","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$5.3 million (≈ $13.7 million in 2026 dollars)",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n19","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","first homes ready for occupancy in about two years",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n37","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","market rate homes will range from approximately $100,000 (≈ $257,796 in 2026 dollars) to $300,000 (≈ $773,389 in 2026 dollars)",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n36","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","adopts the Mission Bay Findings dated September 7 as amended September 13 and September 20, 1990",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n36","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","documented in","Mission Bay : a new San Francisco neighborhood",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n32","ia:C124881581","x_dl_facts"],["1990","described in","first increment of housing started within five years of the start date",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","EIR Alternative B and EIR Public Hearing Alternative would not fully fund City subsidy for Housing Program",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n26","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","new hotel with 500 rooms along China Basin Channel",null,"segment","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$12.5 million (≈ $32.2 million in 2026 dollars)",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n34","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","8,200 to 8,270 homes on-site",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n9","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","8,000 housing units (3,000 affordable, averaging $98,000 (≈ $252,641 in 2026 dollars))",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n33","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","900,000 SF commercial/industrial",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","two- to five-story structures on compensating foundations floating on engineered fill",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n444","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Unemployment rate 6.70%, compared with citywide rate of 6.3%",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n107","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","8,270 homes on-site, 3,000 affordable",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n29","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","45,000 to 95,000 square feet of retail space",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","About 69 acres",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n8","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Adoption of Mission Bay Plan as Part 2 of the Central Waterfront Plan",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n9","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about 10.5% of land set aside for office and commercial/light industrial uses",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n8","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","total of 68 acres of open space in 1990",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n10","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Proposed Development Agreement released for public review",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n33","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Mitigation measures for reducing visual quality impacts",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n534","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Estimated investigation and remediation costs are far less than $30 million (≈ $77.3 million in 2026 dollars)",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n54","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","held by department","City",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n4","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$60 million (≈ $154.7 million in 2026 dollars) to the Port over 30 years",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","recommended modifications to the proposed Development Agreement and Mission Bay Plan",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n46","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","at least 15,500 square feet for child care",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n15","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","documented in","Mission Bay status report",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n5","ia:C124902704","x_dl_facts"],["1990","described in","M-2 (Heavy Industrial) Use District; Height Districts 40 to 200 feet",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","concerns place","The Potrero View (June 1990)",null,"area","Books and texts: The Potrero View (June 1990)","https://archive.org/details/potreroviewjune105unse_2","ia:potreroviewjune105unse_2","showcase_search"],["1990","described in","City Planning Commission Resolution No. 12040",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n44","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","3,000 subsidized units (37.5%)",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","8,500 residences in the 1990 vision",null,"area","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n110","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Draft development agreement, specific plan, zoning amendments and proposed final EIR to be completed for Planning Commission hearings",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n0","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Mission Bay Master Plan resolution adopted by City Planning Commission",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n37","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Median Gross Rent $857 (≈ $2,209 in 2026 dollars), citywide median $662 (≈ $1,707 in 2026 dollars)",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n110","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$54.1 million (≈ $139.5 million in 2026 dollars) funded directly by Project Sponsor",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Amendments to Map 5 Waste Water and Solid Waste Facilities Plan (p. 17.23) and Map 6 Public Schools Facilities Plan (p. 1.7.20)",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","new storage and maintenance facility for MUNI",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n8","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","nearly 32% of project area devoted to housing",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n8","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$2 (≈ $5.16 in 2026 dollars) for each square foot of office space",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n17","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","use","MUNI Metro storage and maintenance yard",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","expanded to 10,000 sq. ft.",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","approximately 313 acres",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","cultural center on a prime public site on Long Bridge Plaza",null,"street","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n29","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","22 acres of Port open space lands licensed to Catellus",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n26","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","3.1 acres dedicated by Catellus",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","half of all homes will be 2 bedrooms and larger",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n36","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$150 million (≈ $386.7 million in 2026 dollars) each",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n37","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","indemnifies City for up to 25 years",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","units","250 units subsidized off-site",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n9","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","2.5 acres with softball field and courts",null,"corner","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n41","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","4.8 million sq. ft. office",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","City transfers 24 acres of former streets and obtains 16 acres of developable housing sites",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Large public agency office building would cause a small reduction in overall property taxes projected",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n24","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","8,073 district residents 16 and over, by occupation (total)",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n108","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","at least 85,000 square feet of unallocated community space",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","total surplus of about $215 million (≈ $554.3 million in 2026 dollars) between project initiation and buildout",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n18","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$2 (≈ $5.16 in 2026 dollars) Billion",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Port transfers 15 acres to Catellus for housing, retail and community service uses",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Commission considered modifications and continued matters to September 20, 1990",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n47","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","proposed","Adoption of Mission Bay Plan as Part 2 of the Central Waterfront Plan",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n19","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about $68 million (≈ $175.3 million in 2026 dollars) in Federal, State, and BART funds",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n47","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","1% of office, hotel, community facility and park construction costs",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n5","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","$98,000 (≈ $252,641 in 2026 dollars) average price",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n7","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","68.8 acres recreation and open space",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Presentation of financial aspects of the project and fiscal impact on the City (City Planning Commission workshop)",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n0","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about 23,000 private sector jobs",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","about 16,000 residents",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","13,000 sq. ft. recreation center",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Project Sponsor costs for capital improvement items, at $231 million (≈ $595.5 million in 2026 dollars)",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","held by department","City",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n4","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","artificially filled former tidal inlet with unengineered fill up to 200 feet deep",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n444","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","15 acres of Port lands exchanged for 26 acres of Catellus land near Pier 80",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n20","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","8,073 district residents by industry of employment (total)",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n108","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Catellus housing guaranteed affordable for 30 years",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","concerns place","Mission Bay : final environmental impact report",null,"area","SF Public Library scans: Mission Bay : final environmental impact report","https://archive.org/details/missionbayfinal1990sanf_2","ia:missionbayfinal1990sanf_2","showcase_search"],["1990","proposed","approved by City Planning Commission and referred to Board of Supervisors",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n8","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","area","300-acre Mission Bay Project Area",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n460","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","concerns place","The Potrero View (August 1990)",null,"area","Books and texts: The Potrero View (August 1990)","https://archive.org/details/potreroviewaugus07unse_1","ia:potreroviewaugus07unse_1","showcase_search"],["1990","described in","Emergency hydrant system to pull water from the Bay",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n50","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990","described in","Catellus to provide land and construct recreation center before development starts on park abutting to north",null,"area","Democracy's Library: Mission Bay : a new San Francisco neighborhood","https://archive.org/details/C124881581/page/n22","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990-02-28","units","8,000 dwelling units",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990-02-28","described in","1% of office and hotel construction costs",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990-02-28","area","735,000 SF retail",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990-02-28","area","Port transfers 14.8 acres to SFPR for housing, retail and community service uses",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990-02-28","area","at least 15,500 square feet of licensable child care space",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990-02-28","area","68.8 acres of parks",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990-02-28","units","3000 affordable units",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990-02-28","described in","500-room hotel",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990-02-28","described in","$5 (≈ $12.89 in 2026 dollars) per sq. ft. of office space",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990-02-28","area","900,000 SF commercial/industrial",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990-02-28","described in","about 23,000 private sector jobs",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990-02-28","described in","about 16,000 residents",null,"area","Democracy's Library: Mission Bay status report","https://archive.org/details/C124902704/page/n2","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1990-08-23","described in","City Planning Commission held workshops and public hearings March 29 through August 23, 1990",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n34","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","Development Agreement between City and Catellus Development Corporation",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n352","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","proposed","approved by the City",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n230","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","units","about 7,600 units South of the Channel",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n103","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","Chief Administrative Officer's office, with the Department of City Planning and other City agencies",null,"area","Democracy's Library: A guide to City Hall, city & county of San Francisco","https://archive.org/details/C124903568/page/n33","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","proposed","Mission Bay Plan Amendments (Exhibit C) adopted by City Planning Commission",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n102","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","proposed","approved in 1991",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919175/page/n19","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","cash contributions of about $5,000,000 (≈ $12.4 million in 2026 dollars)",null,"area","Democracy's Library: 1992 comprehensive housing affordability strategy, city and county of San Franc","https://archive.org/details/C124905450/page/n111","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","units","about 8500 new housing units",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n103","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","units","8,750 homes",null,"area","Democracy's Library: Things to be proud of","https://archive.org/details/C124905335/page/n29","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","Amendments increase the proposed number of housing units and live/work units",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between A","https://archive.org/details/C124922683/page/n13","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","area","900,000 gsf commercial/light industrial space",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n333","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","CAO prepares an annual report on implementation of the agreement",null,"area","Democracy's Library: A guide to City Hall, city & county of San Francisco","https://archive.org/details/C124903568/page/n33","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","$13,100,000 (≈ $32.4 million in 2026 dollars) general fund requirement for 148 units",null,"area","Democracy's Library: 1992 comprehensive housing affordability strategy, city and county of San Franc","https://archive.org/details/C124905450/page/n114","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","500-room hotel",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n333","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","over $140 million (≈ $346.3 million in 2026 dollars) in cash and land from developer",null,"area","Democracy's Library: Things to be proud of","https://archive.org/details/C124905335/page/n29","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","Assessor's Blocks 3795-3798, 3804-3806, 3809, 3810, 3813, 3819, 3822, 3832, 3835, 3837-3841, 3849-3853, 3880, 3892, 3942 and 3944",null,"block","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n100","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","$5,000,000 (≈ $12.4 million in 2026 dollars) cash contributions for 250 SRO units off-site",null,"area","Democracy's Library: 1992 comprehensive housing affordability strategy, city and county of San Franc","https://archive.org/details/C124905450/page/n114","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","passed by the Board for second reading",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n101","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","proposed","Adopted February 1991",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n333","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","contributions of land valued at approximately $3,700,000 (≈ $9.2 million in 2026 dollars)",null,"area","Democracy's Library: 1992 comprehensive housing affordability strategy, city and county of San Franc","https://archive.org/details/C124905450/page/n111","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","units","at least 3,500 affordable units",null,"area","Democracy's Library: Things to be proud of","https://archive.org/details/C124905335/page/n29","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","units","up to an additional 250 on-site affordable housing units",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n102","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","area","69 acres of open space",null,"area","Democracy's Library: Things to be proud of","https://archive.org/details/C124905335/page/n29","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","units","2,300 units of affordable housing",null,"area","Democracy's Library: A guide to City Hall, city & county of San Francisco","https://archive.org/details/C124903568/page/n30","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","Commission considered recommendations and heard public testimony",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n101","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","1991 Development Agreement terminated by the land owner",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919175/page/n25","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","M-2 Heavy Industrial Use District",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n330","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","documented in","A guide to City Hall, city & county of San Francisco",null,"area","Democracy's Library: A guide to City Hall, city & county of San Francisco","https://archive.org/details/C124903568/page/n30","ia:C124903568","x_dl_facts"],["1991","documented in","Things to be proud of",null,"area","Democracy's Library: Things to be proud of","https://archive.org/details/C124905335/page/n29","ia:C124905335","x_dl_facts"],["1991","proposed","Development Agreement amendments (Exhibit D) approved by City Planning Commission",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n102","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","$16,300,000 (≈ $40.3 million in 2026 dollars) local subsidy dollars",null,"area","Democracy's Library: 1992 comprehensive housing affordability strategy, city and county of San Franc","https://archive.org/details/C124905450/page/n111","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","units","8,500 housing units",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n333","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","documented in","1992 comprehensive housing affordability strategy, city and county of San Francisco",null,"area","Democracy's Library: 1992 comprehensive housing affordability strategy, city and county of San Franc","https://archive.org/details/C124905450/page/n111","ia:C124905450","x_dl_facts"],["1991","area","750,000 gsf retail space",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n333","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","proposed","Extension of the Municipal Railway subway, above ground to Mission Bay",null,"area","Democracy's Library: A guide to City Hall, city & county of San Francisco","https://archive.org/details/C124903568/page/n34","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","area","67.9 acres of open space",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n333","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","area","4.8 million gsf office/institutional space",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n333","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","Included in the City's 1991 Mission Bay Plan and Development Agreement; City and developer reevaluating the Plan",null,"parcel","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919175/page/n26","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","proposed","Mission Bay Specific Plan approved in 1991",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919184/page/n84","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","Greatest opportunities for such construction are in redevelopment areas and underutilized industrial areas in Mission Bay and the South Bayshore",null,"area","Democracy's Library: 1992 comprehensive housing affordability strategy, city and county of San Franc","https://archive.org/details/C124905450/page/n67","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","Amendments increase the proposed number of housing units and live/work units",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n19","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","one-third of the city's housing potential",null,"area","Democracy's Library: 1992 comprehensive housing affordability strategy, city and county of San Franc","https://archive.org/details/C124905450/page/n55","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","units","approximately 148 units of affordable housing",null,"area","Democracy's Library: 1992 comprehensive housing affordability strategy, city and county of San Franc","https://archive.org/details/C124905450/page/n111","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","Generally bounded by Third, Berry, Fourth, China Basin Channel, China Basin, Mariposa, Pennsylvania, Seventh and Townsend Streets",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n100","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","$3,700,000 (≈ $9.2 million in 2026 dollars) land contributions for 148 units",null,"area","Democracy's Library: 1992 comprehensive housing affordability strategy, city and county of San Franc","https://archive.org/details/C124905450/page/n114","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","$3,200,000 (≈ $7.9 million in 2026 dollars) tax increment bonds, no state subsidies",null,"area","Democracy's Library: 1992 comprehensive housing affordability strategy, city and county of San Franc","https://archive.org/details/C124905450/page/n114","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1991","described in","defeated, then compromise brought by Agnos Administration",null,"area","Democracy's Library: Things to be proud of","https://archive.org/details/C124905335/page/n29","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","will have a particularly adverse impact on the supply of land for container shipping support services",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n259","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","documented in","Report to the San Francisco Board of Supervisors : management audit of the San Francisco Redevelopment Agency",null,"area","Democracy's Library: Report to the San Francisco Board of Supervisors : management audit of the San ","https://archive.org/details/C124903911/page/n46","ia:C124903911","x_dl_facts"],["1992","documented in","[Public information documents relating to Port of San Francisco waterfront plan project]",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n261","ia:C124908577","x_dl_facts"],["1992","described in","BCDC amended the Seaport Plan to provide for a possible modification of the marine terminal designation",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n109","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","proposed","small boat facilities developed with private funding at public parks",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n77","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","679 employees",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n265","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","rezoning will have a particularly adverse impact on the supply of land for support services to container shipping",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n259","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","nearly 50% of employees of existing businesses at Mission Bay were San Francisco residents",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n244","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","Agency could become focus of activities if requested by City officials",null,"area","Democracy's Library: Report to the San Francisco Board of Supervisors : management audit of the San ","https://archive.org/details/C124903911/page/n46","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","Specific Plan completed by City and Catellus",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n330","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","The Support Services for cargo shipping are also the most likely to be adversely affected by the implementation of the Mission Bay project",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n245","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","implementation depends on Port strategy, acceptable to BCDC, reserving port priority use areas",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n205","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","rezoned","300+ acres rezoned from light and heavy industry to residential and commercial uses",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n235","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","concerns place","The Potrero View (June 1992)",null,"area","Books and texts: The Potrero View (June 1992)","https://archive.org/details/potreroviewjune105unse_4","ia:potreroviewjune105unse_4","showcase_search"],["1992","rezoned","300+ acres rezoned from light and heavy industry to residential and commercial uses",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n257","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","located near anticipated residential development as part of the Mission Bay development",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n156","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","Port will face tough choices in allocating its facilities as Mission Bay project is implemented and off-Port land supply declines",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n244","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","will eventually displace a number of businesses that serve the container industry",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n218","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","possible dedicated terminal space for imports of finished iron and steel products if warranted by Mission Bay demand",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n27","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","concerns place","Analysis of the Small Business Development Corporation's (SBDC) findings regarding Mission Bay",null,"area","SF Public Library scans: Analysis of the Small Business Development Corporation's (SBDC) findings re","https://archive.org/details/analysisofsmallb61992sanf","ia:analysisofsmallb61992sanf","showcase_search"],["1992","described in","39 maritime related establishments",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n265","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","some truckers use Port of San Francisco facilities as often as 25 times a day",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n259","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","nearly 50% of employees were San Francisco residents",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n265","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","existing maritime related establishments including ship repair, ship maintenance/servicing, cargo handling and storage, intermodal transport, and freight forwarding",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n236","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","679 employees at 39 maritime related businesses",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n244","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","documented in","Into the 21st century : building a new facility to continue Laguna Honda Hospital's mission",null,"area","Democracy's Library: Into the 21st century : building a new facility to continue Laguna Honda Hospit","https://archive.org/details/C124902290/page/n54","ia:C124902290","x_dl_facts"],["1992","concerns place","The Potrero View (July 1992)",null,"area","Books and texts: The Potrero View (July 1992)","https://archive.org/details/potreroviewjuly106unse_3","ia:potreroviewjuly106unse_3","showcase_search"],["1992","described in","jobs in these industries tend to be high paying, possibly union, available to San Francisco residents",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n273","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","rezoning will ultimately displace a number of Support Service businesses, including cargo sourcing, warehousing and transportation companies",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n257","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","supply of support services to breakbulk shipping adversely affected by competition for land from commercial and residential uses",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n260","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","proposed","alternate sites investigated; none met all of the Hospital's needs, including space",null,"area","Democracy's Library: Into the 21st century : building a new facility to continue Laguna Honda Hospit","https://archive.org/details/C124902290/page/n54","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","proposed","Mission Bay Plan, a Specific Plan, completed by City and Catellus for development of 294 to 309 acres",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n330","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","Displacement of cargo support service businesses from Mission Bay creates additional demand for Port land",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n189","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","amended to accommodate H & H Ship Service waste oil and bilge use, previously slated for wetland/park",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n261","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","described in","Mission Bay project will adversely affect cargo shipping support services",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n267","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","area","between 294 and 309 acres",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n330","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1992","rezoned","300+ acres rezoned from light and heavy industry to residential and commercial uses",null,"area","Democracy's Library: [Public information documents relating to Port of San Francisco waterfront plan","https://archive.org/details/C124908577/page/n235","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1993","concerns place","Tar Flat, Rincon Hill, and the shore of Mission Bay : archaeological research design and treatment plan for SF-480 terminal separation rebuild. Volume 3.",null,"area","Books and texts: Tar Flat, Rincon Hill, and the shore of Mission Bay : archaeological research desig","https://archive.org/details/PraetzellisTarFlatMissionBayV3","ia:PraetzellisTarFlatMissionBayV3","showcase_search"],["1993","described in","Mission Bay Project Area included in Enterprise Zone",null,"area","Democracy's Library: May 19, 1993 Budget Committee meeting, Items 1 and 2, Files 127-93-2 and 127-93","https://archive.org/details/C124917706/page/n4","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1993","concerns place","Tar Flat, Rincon Hill, and the shore of Mission Bay : archaeological research design and treatment plan for SF-480 terminal separation rebuild. Volume 2.",null,"area","Books and texts: Tar Flat, Rincon Hill, and the shore of Mission Bay : archaeological research desig","https://archive.org/details/PraetzellisTarFlatMissionBayV2","ia:PraetzellisTarFlatMissionBayV2","showcase_search"],["1993","concerns place","The Semaphore",null,"area","Books and texts: The Semaphore","https://archive.org/details/semaphore124tele","ia:semaphore124tele","showcase_search"],["1993","concerns place","Tar Flat, Rincon Hill, and the shore of Mission Bay : archaeological research design and treatment plan for SF-480 terminal separation rebuild, volume 1.",null,"area","Books and texts: Tar Flat, Rincon Hill, and the shore of Mission Bay : archaeological research desig","https://archive.org/details/PraetzellisTarFlatVOne","ia:PraetzellisTarFlatVOne","showcase_search"],["1993","described in","18,273 industrial jobs",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n112","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1993","described in","115 other jobs",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n112","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1993","described in","33,013 total jobs",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n112","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1993","described in","23 hotel jobs",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n112","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1993","described in","2,381 cultural and institutional jobs",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n112","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1993","described in","3,649 retail jobs",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n112","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1993","described in","Central thoroughfare through the developing Mission Bay area",null,"area","Democracy's Library: Transit terminal study","https://archive.org/details/C124914494/page/n23","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1993","described in","8,572 office jobs",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n112","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1993","documented in","Transit terminal study",null,"area","Democracy's Library: Transit terminal study","https://archive.org/details/C124914494/page/n23","ia:C124914494","x_dl_facts"],["1993","documented in","May 19, 1993 Budget Committee meeting, Items 1 and 2, Files 127-93-2 and 127-93-3 : [proposed San Francisco ordinances to exempt firms which create new jobs from some business taxes]",null,"area","Democracy's Library: May 19, 1993 Budget Committee meeting, Items 1 and 2, Files 127-93-2 and 127-93","https://archive.org/details/C124917706/page/n4","ia:C124917706","x_dl_facts"],["1994","area","approximately six acres designated as backland for cargo or other maritime operations",null,"area","Democracy's Library: Draft waterfront land use plan","https://archive.org/details/C101737381/page/n184","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","area","Approximately 20 acres on Port property",null,"area","Democracy's Library: Draft waterfront land use plan","https://archive.org/details/C101737381/page/n188","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","proposed","mixed-use waterfront neighborhood over 25 years",null,"area","Democracy's Library: Draft waterfront land use plan","https://archive.org/details/C101737381/page/n188","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","described in","extend shoreline Port Walk through the area and pedestrian connection between South Beach and Mission Bay at China Basin Channel",null,"area","Democracy's Library: Draft waterfront land use plan","https://archive.org/details/C101737381/page/n190","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","described in","11 acre wetlands approved as part of the Mission Bay Plan",null,"area","Democracy's Library: Port of San Francisco : draft waterfront land use plan","https://archive.org/details/C124908106/page/n48","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","described in","No sensitive plant or wildlife species are known to exist on the site",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n484","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","area","300+ acre site",null,"area","Democracy's Library: Port of San Francisco : draft waterfront land use plan","https://archive.org/details/C124908106/page/n115","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","area","Approximately 20 acres on Port property",null,"area","Democracy's Library: Port of San Francisco : draft waterfront land use plan","https://archive.org/details/C124908106/page/n115","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","proposed","Repair the public boat launch near Pier 52 and return it to full service as soon as possible",null,"parcel","Democracy's Library: Port of San Francisco : draft waterfront land use plan","https://archive.org/details/C124908106/page/n129","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","documented in","Draft waterfront land use plan",null,"area","Democracy's Library: Draft waterfront land use plan","https://archive.org/details/C101737381/page/n190","ia:C101737381","x_dl_facts"],["1994","proposed","possible reuse of Pier 52 for a new small boat hoist, temporary storage, or other support services",null,"parcel","Democracy's Library: Port of San Francisco : draft waterfront land use plan","https://archive.org/details/C124908106/page/n129","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","area","67 acres of open space south of China Basin Channel",null,"area","Democracy's Library: Draft waterfront land use plan","https://archive.org/details/C101737381/page/n188","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","units","8,500 residential units",null,"area","Democracy's Library: Draft waterfront land use plan","https://archive.org/details/C101737381/page/n188","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","described in","Potentially liquefiable material beneath the surface, per 1994 Treadwell & Rollo letter report",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n764","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","documented in","Port of San Francisco : draft waterfront land use plan",null,"area","Democracy's Library: Port of San Francisco : draft waterfront land use plan","https://archive.org/details/C124908106/page/n48","ia:C124908106","x_dl_facts"],["1994","units","8,500 residential units",null,"area","Democracy's Library: Port of San Francisco : draft waterfront land use plan","https://archive.org/details/C124908106/page/n115","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","described in","report submitted to Catellus Development Corporation",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n762","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","described in","geo-seismic characteristics investigated by Treadwell & Rollo, Inc.",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n444","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","area","approximately six acres adjacent to Piers 48 and 50, designated as backland for cargo or other maritime operations",null,"area","Democracy's Library: Port of San Francisco : draft waterfront land use plan","https://archive.org/details/C124908106/page/n113","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","proposed","11 acre wetlands and other waterfront open spaces",null,"area","Democracy's Library: Draft waterfront land use plan","https://archive.org/details/C101737381/page/n68","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","described in","Address parking needs of recreational boaters in design of open space",null,"area","Democracy's Library: Draft waterfront land use plan","https://archive.org/details/C101737381/page/n210","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","area","67 acres of open space south of China Basin Channel",null,"area","Democracy's Library: Port of San Francisco : draft waterfront land use plan","https://archive.org/details/C124908106/page/n115","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","area","Approximately 4 million square feet of new general offices north of China Basin Channel",null,"area","Democracy's Library: Draft waterfront land use plan","https://archive.org/details/C101737381/page/n188","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994","described in","located south of China Basin, adjacent to Mission Bay",null,"area","Democracy's Library: Draft waterfront land use plan","https://archive.org/details/C101737381/page/n56","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1994-11-04","described in","Address the parking needs of recreational boaters in the design of the open space",null,"area","Democracy's Library: Port of San Francisco : draft waterfront land use plan","https://archive.org/details/C124908106/page/n130","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","described in","Total projected daily vehicle trips by mode split (Table 12-6 total)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n378","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","rezoned","zoned for community facilities; potential site for sports-oriented entertainment complex, possibly baseball stadium",null,"block","Democracy's Library: Transbay area plan : background data report","https://archive.org/details/C124914193/page/n99","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","use","railroad holding yard of Southern Pacific Railroad",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n42","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","documented in","Transbay area plan : background data report",null,"area","Democracy's Library: Transbay area plan : background data report","https://archive.org/details/C124914193/page/n99","ia:C124914193","x_dl_facts"],["1995","documented in","Final status report on CAO projects/departments prior to my retirement",null,"area","Democracy's Library: Final status report on CAO projects/departments prior to my retirement","https://archive.org/details/C124913658/page/n12","ia:C124913658","x_dl_facts"],["1995","described in","Require a dedicated bicycle recreational element in new developments and re-development areas such as Mission Bay and Embarcadero",null,"area","Democracy's Library: San Francisco bicycle plan : draft report","https://archive.org/details/C124920755/page/n110","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","proposed","bike trail loop at the perimeter of Mission Bay",null,"area","Democracy's Library: San Francisco bicycle plan : draft report","https://archive.org/details/C124920755/page/n108","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","described in","Learning facility recommended at China Basin",null,"area","Democracy's Library: San Francisco bicycle plan : draft report","https://archive.org/details/C124920755/page/n18","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","described in","Segment 5: 83+55 - 90+55 Future Mission Bay Station",null,"segment","Democracy's Library: Transbay area plan : background data report","https://archive.org/details/C124914193/page/n65","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","documented in","Transportation : an element of the master plan of the city and county of San Francisco",null,"area","Democracy's Library: Transportation : an element of the master plan of the city and county of San Fr","https://archive.org/details/C124916766/page/n27","ia:C124916766","x_dl_facts"],["1995","described in","Total population 10,816; total average daily vehicle trips 4,198 (parking demand estimate)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n386","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","described in","Financial Assurance required by the Development Agreement not provided by Catellus",null,"area","Democracy's Library: Final status report on CAO projects/departments prior to my retirement","https://archive.org/details/C124913658/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","described in","Total LRDP water use approximately 0.58 mgd, an increase of 0.6 percent over 1995 annual use in San Francisco",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n568","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","units","8,000 new housing units",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n46","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","described in","development agreement between the City and County of San Francisco and Catellus Development Corporation",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n40","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","described in","Learning facility at China Basin",null,"area","Democracy's Library: San Francisco bicycle plan : draft report","https://archive.org/details/C124920755/page/n107","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","described in","approximately 260 acres of Bay waters",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n42","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","documented in","San Francisco bicycle plan : draft report",null,"area","Democracy's Library: San Francisco bicycle plan : draft report","https://archive.org/details/C124920755/page/n110","ia:C124920755","x_dl_facts"],["1995","described in","should have a dedicated bicycle element as part of their circulation/open space plan",null,"area","Democracy's Library: San Francisco bicycle plan : draft report","https://archive.org/details/C124920755/page/n19","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","described in","1995 Estimated Market Rate Rent $1,127 (≈ $2,492 in 2026 dollars), citywide average $983 (≈ $2,173 in 2026 dollars)",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n110","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","described in","Proposed major amendments to Development Agreement to go before Planning Commission and Board of Supervisors",null,"area","Democracy's Library: Final status report on CAO projects/departments prior to my retirement","https://archive.org/details/C124913658/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","described in","plans drawn connecting CalTrain to Muni Metro and BART",null,"area","Democracy's Library: Transportation : an element of the master plan of the city and county of San Fr","https://archive.org/details/C124916766/page/n27","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","described in","2,363 district establishments (5.82% of citywide establishments)",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n111","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","area","over six million square feet for employment",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n46","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","described in","Vendors/Service trips assumed 100% drive alone",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n378","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","described in","large floor plate offices with ground floor retail in four to eight story structures proposed",null,"area","Democracy's Library: Transbay area plan : background data report","https://archive.org/details/C124914193/page/n99","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","described in","$2,229,897 thousand (≈ $4.9 billion in 2026 dollars) total gross receipts (8.16% of citywide receipts)",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n111","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","described in","initial closure anticipated",null,"area","Democracy's Library: Final status report on CAO projects/departments prior to my retirement","https://archive.org/details/C124913658/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","rezoned","zoned for high density residential use",null,"block","Democracy's Library: Transbay area plan : background data report","https://archive.org/details/C124914193/page/n99","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","described in","Community Facilities District not yet created",null,"area","Democracy's Library: Final status report on CAO projects/departments prior to my retirement","https://archive.org/details/C124913658/page/n12","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","area","315 acres",null,"area","Democracy's Library: Amendments to the master plan adopted between September 1988 and March 1995","https://archive.org/details/C124914759/page/n45","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1995","depicted in","Mission Creek",null,"area","Films and video: Mission Creek","https://archive.org/details/ssfMISSCRK","qipu:sf/place/fill/mission-bay","showcase_search"],["1996","proposed","potential site in the southeastern area of Mission Bay, shown on Figure 2-8",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n529","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Regulatory background for visual quality; Mission Bay Plan contains design objectives and policies applying to Mission Bay area",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n153","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Keep basements and streets above local water table to avoid dewatering (Measure K6)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n765","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","approximately 30 acres of shoreline parks and open space on Port property",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919184/page/n141","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","transit ridership effects would not be significant",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n556","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","bounded by Townsend Street to the north, Seventh Street and Pennsylvania Avenue on the west, Mariposa Street on the south",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n641","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Increase average dry-weather wastewater flow to Southeast Plant by 0.34 mgd, using 1.4 percent of plant surplus capacity of 25 mgd",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n79","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Future build-out under the city's adopted Mission Bay Plan, with effects similar to Major New Site",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n605","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","No significant UCSF development effects would occur at Mission Bay under this alternative, but cumulative effects would not be avoided in the long term",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n592","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","not expected to have significant effects on wildlife or vegetation",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n606","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Mission Bay as a potential Major New Site",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n448","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Construction noise at a Major New Site would be a temporary but significant impact",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n406","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","2.65 million gross square feet",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n498","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Repair the public boat launch near Pier 52 and return it to full service as soon as possible",null,"parcel","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919184/page/n158","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","water demand increase",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n508","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","units","up to 8,500 residential units",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n551","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Hazardous chemical, radioactive and biohazardous materials use; less than significant with compliance with state, federal and local rules",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n64","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","seismic sea wave flooding less than one foot in most extreme case",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n445","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","nearly level to gently undulating surface, generally about +10 feet msl",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n444","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","11 acre wetlands and other waterfront open spaces",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919184/page/n64","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Mission Bay as alternative location; Executive Park uses would relocate to Major New Site",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n306","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","up to 1,580 pedestrian/bicycle trips per day",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n59","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Development would not substantially change the amount or quality of surface runoff",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n72","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Encourage improvements to enhance the passive recreational features of this park",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919175/page/n171","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Loss of integrity of historic or architectural resources not expected; design responsive to surrounding scale and character",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n548","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Less Than Significant. None required.",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n536","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","encompasses the Mission Bay area, plus two sub-areas including China Basin, the northern half of Central Basin and adjacent inland areas",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n81","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Would increase potential for fire emergency and medical aid response; would not reduce city-wide response capacity",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n76","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Increase density of liquefaction-prone materials (Measure K15)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n765","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","no recorded prehistoric or protohistoric archaeological sites within Mission Bay",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n544","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","about 4,180 parking spaces needed",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n556","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Mission Bay Plan and zoning still in effect and used in traffic analysis",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n340","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Potential historic archaeological resources; cultural resource effects less than significant with mitigation",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n559","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Annual use of approximately 42,200 gallons of liquid chemicals, 235,000 pounds of solid chemicals and 122,000 cubic feet of compressed gases",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n420","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","sediment and grease traps in local stormwater intakes during construction",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n766","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","duly noticed public hearing held; public testimony heard",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n330","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Mission Bay Site is in San Francisco's Special Geologic Study Areas for potential ground failure hazards",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n763","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","height limits ranging from 45 to 110 feet",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n533","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","about 313 acres",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n68","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","4.8 million gsf of office/institutional space",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n641","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","In-depth site investigation to characterize soil and groundwater conditions, guided by a comprehensive sampling plan",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n68","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Central Waterfront Plan applies to Mission Bay area and two subareas including China Basin",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n333","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","piles needed for structures more than 5 stories high",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n761","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","about 8,100 net new jobs",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n608","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Surface extension of MUNI Metro service into Mission Bay",null,"area","Democracy's Library: Transit terminal study","https://archive.org/details/C124914494/page/n23","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","use","golf driving range with high fencing and night lighting",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n528","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Cumulative impacts analyzed in Chapter 12",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n578","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","about 1,150,000 gsf of research space",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n334","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","estimated parking demand 5,300 spaces at two spaces per 1,000 gross sq ft",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n385","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","as much as 57 feet of unengineered fill over 20 to 120 feet of Bay Mud",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n760","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","documented in","Port of San Francisco waterfront land use plan : draft for public review and comment",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919184/page/n141","ia:C124919184","x_dl_facts"],["1996","described in","Site-specific Mitigation Measures 12M2-1 and 12M4-2; impact reduced to less than significant",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n81","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","23.717 Ac.",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 1996","https://archive.org/details/igsl_san-francisco-real-prop-report_1996/page/n48","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","surface generally about 10 feet above mean sea level",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n762","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Use of underground storage tanks has been pervasive over an extended period",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n431","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","would not be expected to have significant effects on visual quality",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n607","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","potentially significant impact (alteration of views)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n512","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","9,100 employees",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n498","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Mitigation Measure 12D4-2 (Significant/Unavoidable): TDM measures would not reduce trips below the 80 lb/day threshold",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n404","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","350,000 gsf of logistics space",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n334","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","height districts may require modification, but no change in permitted maximum height is expected",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n535","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Special Geologic Study Area for potential ground failure and inundation hazards; site-specific investigations required before new development",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n763","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","300+ acres",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919184/page/n141","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Transportation of hazardous materials to, from and among UCSF facilities; less than significant with compliance with state, federal and UCSF policies",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n64","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Changes existing site character from industrial to research campus uses",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n335","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","wastewater impact not significant",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n508","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","about five miles apart",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n602","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","smaller than the Major New Site at Mission Bay in the LRDP",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n606","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Less Than Significant; none required",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n495","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Site is not in an Alquist-Priolo Earthquake Fault Zone; little chance surface would be ruptured by a fault",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n764","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Subject to Modified Mercalli Intensity VII from M7.5 Hayward Fault maximum credible earthquake; IX to XI from M8.3 San Andreas",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n764","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","In-depth site investigation to characterize soil and groundwater conditions",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n433","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Pile foundations where soils are inappropriate for foundation support (Measure K2)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n765","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Low-pressure domestic water at 1,000 gpm; high-pressure firefighting system at 10,000 gpm",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n494","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","increase water demand by 0.51 mgd, 0.56 percent of San Francisco's existing use of 90 mgd",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n507","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Natural gas: 543 million cubic feet (cf) per year",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n498","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Development would increase hazardous material use in the vicinity, exposing more people to potential hazards",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n420","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Reduces UCSF-related traffic by about 35 percent compared to Major New Site scenario",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n604","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Water supply and pressure adequate for next 15 years",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n494","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Encourage improvements to enhance the passive recreational features of this park",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919184/page/n158","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","900,000 gsf of service/light industrial/research & development uses",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n334","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","basements constructed above the water table, eliminating dewatering",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n761","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","18,400 external person-trips on a weekday",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n377","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","SFFD can serve site within current capacity without additional resources",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n494","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","about 4,800,000 gsf of office space",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n334","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","units","8,500 housing units",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n641","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Carbon monoxide impacts less than significant",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n404","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Mitigation Measure 12H4-4 revises Mitigation Measure L.15",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n463","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","about 325 acres",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n641","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","resulting plan incorporated technical experts' recommendations to minimize earthquake risks",null,"area","Democracy's Library: Community safety : draft for citizen review : an element of the Master plan of ","https://archive.org/details/C124916696/page/n33","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","peak parking demand of about 4,200 spaces",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n58","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Roadside CO levels: less than significant before and after mitigation (none required); no CO standard violations near the site",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n61","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","as much as 57 feet of unengineered fill overlying 20 to 120 feet of Bay Mud",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n760","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","adequate for the existing demand",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n376","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","best of the three major new site locations to pair with the Presidio under the two-satellite alternative",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n615","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","all new development preceded by special site-specific investigations",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n763","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","average daily population of 8,250",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n488","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","six overflow structures along China Basin Channel",null,"segment","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n460","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","could require an amendment to the Mission Bay Plan to address a change in land use mix",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n554","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","loose artificial fill from about 1 foot to more than 30 feet thick",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n444","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Area occupied by a large variety of industries with potential to produce hazardous waste",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n431","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","units","up to 8,500 dwelling units",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n319","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","One-hour average CO future 5.2 ppm",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n403","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Eight-hour average CO future 3.5 ppm",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n403","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","convert 300 acre site to new mixed-use waterfront neighborhood and UCSF research campus",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919175/page/n25","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Spread of groundwater contamination (construction): no mitigation required, less than significant",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n71","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Tidal flooding impact is significant for the project",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n463","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","about 3,390 person-trips per day added to MUNI lines serving Mission Bay",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n58","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Part of site covered by San Francisco Master Plan Central Waterfront Area Plan",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n152","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","existing traffic noise levels already exceed noise/land use compatibility criteria",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n557","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Catellus Development Corporation withdrew from the Mission Bay Development Agreement",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n340","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","requiring a mass care facility in the Mission Bay planning area",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n762","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","313-acre area owned predominantly by Catellus Development Corporation",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n330","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","average daily population of 8,250",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n498","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Alteration of existing views would be less than significant",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n534","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Mitigation Measure 1214-1 (Less Than Significant): none required",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n485","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Water: 0.51 million gallons per day, or 571 acre-feet per year",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n498","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Catellus Development Corporation has withdrawn; Mission Bay Plan and zoning remain in place",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n603","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Not proposed for use and not to be demolished by UCSF",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n547","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","construct similar high-level platforms",null,"area","Democracy's Library: Management audit of the San Francisco Municipal Railway","https://archive.org/details/C124921892/page/n103","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Alteration of views including obstruction of some bay views from residential buildings; overall change not substantial",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n80","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Development would be consistent with local land use plans, zoning codes, and environmental goals, plans and policies (less than significant, no mitigation)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n53","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","establishes a concept for a new neighborhood in the Mission Bay area",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n81","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","sewage overflows into China Basin Channel at seven overflow points during large storms",null,"segment","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n507","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","adopted specific plan for Mission Bay",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n71","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Bay Mud, 10 to 70 feet of soft, water-saturated silty clay",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n445","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Housing, commercial-industrial uses, a hotel, a variety of retail uses, and shoreline and other open spaces, plus UCSF campus",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919175/page/n26","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Construction could disturb prehistoric archaeological resources; Mission Bay Plan measures would avoid significant effects",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n83","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Measure K1 mandates a comprehensive site-specific geotechnical study for all structures three stories high or higher",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n764","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Less than significant effect on National Register resources through loss of integrity",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n547","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","China Basin Channel houseboats, San Francisco Recreational Vehicle Park, Washington Hotel",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n402","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Facilities could be subject to tidal flooding due to low elevations and rising sea levels",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n72","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Land use and planning impacts similar to those in Chapter 12; smaller than Major New Site at Mission Bay under the LRDP",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n604","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","water supply impact less than significant",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n508","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","about one-third of the site is at or below the maximum predicted wave run-up level",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n766","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","about 1,200,000 gsf of office uses",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n334","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Development avoiding sensitive habitat along Mission Creek would be less than significant",null,"segment","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n485","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Public service impacts less-than-significant; utilities impacts comparable in magnitude at each location including Mission Bay",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n559","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Wastewater treatment impact is less than significant; no mitigation required",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n79","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","analyzes UCSF development at the Presidio and Mission Bay sites",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n602","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","planning process included geotechnical assessments of a largely filled-land site",null,"area","Democracy's Library: Community safety : draft for citizen review : an element of the Master plan of ","https://archive.org/details/C124916696/page/n33","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Design and build residential units per State Title 24 indoor noise standards",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n418","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Expanded boat trailer parking areas in the design of the open space",null,"segment","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919175/page/n171","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","UCSF considering Mission Bay as a Major New Site location",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n63","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","v/c ratio deterioration on US 101 and I-280 freeway near the site; significant unavoidable impact",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n33","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Existing traffic noise at Mission Bay already exceeds noise compatibility criteria, as is often the case in a developed urban setting",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n34","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","backland for cargo shipping or other maritime operations",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919175/page/n148","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","potentially significant hydrology and subsurface water quality effects mitigated as for Major New Site",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n606","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","about 1,620 vehicle trips in the pm peak hour",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n377","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Consistent with Mission Bay Plan goals",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n335","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","approximately 2.65 million gsf of institutional uses",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n334","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","up to 1,580 pedestrian/bicycle trips per day",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n385","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Remove Pier 64; consider applying fill credits from removal to new development projects",null,"parcel","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919175/page/n171","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Old or abandoned underground storage tanks may be present in areas to be developed",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n433","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","new shade from the Major New Site at Mission Bay would not be considered significant",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n536","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","67 lb/day of ROG would meet the threshold",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n404","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Development of a Major New Site at Mission Bay would not involve any wetland issues",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n558","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","documented in","San Francisco economic summit, April 16-17, 1996 : final report",null,"area","Democracy's Library: San Francisco economic summit, April 16-17, 1996 : final report","https://archive.org/details/C124921856/page/n27","ia:C124921856","x_dl_facts"],["1996","described in","Section 15 geo-seismic measures K1 through K23",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n445","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","UCSF impacts at Mission Bay reduced compared to a Major New Site at Mission Bay",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n41","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","construction of a mass-care facility for use in emergency situations",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n766","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","approximately 49 known existing and former tanks in the shallow subsurface zone",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n432","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","seismic sea wave flooding depth less than one foot in most extreme case",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n763","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Consistent with uses envisioned in the adopted Mission Bay Plan",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n604","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","general concept shown in Figure 2-8",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n71","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Net new vehicle trips would generate criteria air pollutants above the BAAQMD 80 lb/day Best Available Control Technology threshold",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n577","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","Approximately 30 acres of shoreline parks and open space on Port property",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919175/page/n150","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Neither CNDDB nor the Mission Bay FEIR identified sensitive habitat or sensitive species within the Mission Bay planning area",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n485","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","No use of groundwater at the Major New Site",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n462","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Development would not endanger or damage sensitive species and sensitive habitat; not a significant impact",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n485","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","10,820 daily vehicle-trips",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n377","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","4.8 million gsf office/institutional space",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n68","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Fire emergency and medical aid response impact would not be significant",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n494","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Adds about 3,390 person-trips per day to MUNI lines serving Mission Bay",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n384","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","67.9 acres of open space",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n68","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","more likely locations for prehistoric habitation and resource-gathering encampments",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n544","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Archaeological retention, exploration programs and monitoring in areas shown on Figure 12-28",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n547","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","same potential significant impact of disturbance to historic archaeological resources as the Major New Site under the LRDP",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n608","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","potential significant impacts from increased tidal flooding hazards",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n35","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Soil contamination requires remediation, so construction could not begin immediately",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n611","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Prepare and implement a Remedial Action Plan under oversight of DTSC or the Regional Water Quality Control Board",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n68","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","least vehicle-related emissions; 69 percent drive-alone trips",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n556","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","up to 2.65 million gsf (plus parking)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n636","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Stormwater runoff from most of Mission Bay is collected in storm drains connected to the city's combined sanitary sewage/stormwater system",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n459","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","about 3,390 person-trips per day added to MUNI lines",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n58","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","about 110 feet",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n534","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Most of the underground storage tanks have been removed",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n432","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","would need to be modified to accommodate UCSF at Mission Bay",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n641","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Mission Bay site does not include sensitive habitat or species that would be disturbed by a Major New Site",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n36","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","units","8,500 housing units",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n68","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","highest point nearly +25 feet msl",null,"corner","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n762","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Particular attention to construction where development is proposed on the late 19th-century city dump",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n83","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","utility demand at a Major New Site at Mission Bay about 35 percent of that under the LRDP",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n601","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","documented in","Port of San Francisco waterfront land use plan : draft for public review and comment",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919175/page/n25","ia:C124919175","x_dl_facts"],["1996","documented in","Real property owned by the city and county of San Francisco / 1996",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 1996","https://archive.org/details/igsl_san-francisco-real-prop-report_1996/page/n48","ia:igsl_san-francisco-real-prop-report_1996","x_dl_facts"],["1996","described in","Catellus Development Corporation modified Mission Bay Project Area boundary to exclude Port Seawall Lot 337, designated open space",null,"parcel","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919175/page/n30","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Depth to groundwater ranges from 3.5 feet to 9 feet below the ground surface",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n459","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","documented in","Draft EIR : long range development plan, University of California, San Francisco",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n81","ia:C124922948","x_dl_facts"],["1996","described in","fill overlying Bay Mud and other unconsolidated sediments in a seismically active area, found at this location",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n557","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Would not be expected to change the overall housing and employment uses envisioned in the Mission Bay Plan",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n555","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Mission Bay Site not located on an active fault and not subject to fault rupture",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n763","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","protection of low-lying areas with setbacks from the water's edge",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n766","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","buildings less than 40 feet in height exempt from Section 295 controls",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n533","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Eight-hour average CO existing 5.4 ppm",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n403","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","No portions of Mission Bay lie within the 100-year floodplain, but portions may lie beneath the 100-year high tide elevation",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n463","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","approximately six acres designated as backland for cargo shipping or other maritime operations",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919184/page/n139","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","units","96 family student spaces",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n550","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","approximately 40 acres of contiguous parcels",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n641","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Northern coastal salt marsh habitat is not sufficiently developed at Mission Bay to support the salt marsh harvest mouse",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n485","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Complete a risk assessment for potential contaminants",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n433","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Mission Bay as a potential Major New Site",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n18","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Contaminated sediments due to erosion (construction): significant before mitigation, less than significant after mitigation",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n71","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Mission Bay Park using brownfields, balanced with affordable housing needs",null,"area","Democracy's Library: San Francisco economic summit, April 16-17, 1996 : final report","https://archive.org/details/C124921856/page/n27","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Wave run-up of 4.6 to 4.8 feet during the 100-year event",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n765","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Measures in place would remediate existing groundwater contamination and avoid further contamination; impact less than significant",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n462","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","2.65 million gsf",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n314","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","peak parking demand about 4,200 spaces",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n385","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","units","248 single student spaces",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n550","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","500-room hotel",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n68","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","would not be expected to limit use of open space substantially",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n535","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","announced it was exercising its right to withdraw from the 1991 Mission Bay Plan and Development Agreement",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n68","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Catellus Development Corporation has withdrawn from the Development Agreement",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n334","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Remove Pier 64",null,"parcel","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919184/page/n158","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Remedial Action Plan to be prepared and implemented under DTSC or Regional Water Quality Control Board oversight",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n433","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Mission Bay site characterized as contaminated with hazardous materials from past industrial or railroad uses; conditions to be mitigated below significance through remediation",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n34","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Construction could disturb historic archaeological resources",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n83","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Urban setting developed for industrial uses (rail yards, truck terminals, warehouses, maritime); much of the area is vacant",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n484","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Net new vehicle trips would generate criteria air pollutants in excess of the BAAQMD 80 lb/day threshold (Less Than Significant)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n404","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Groundwater is brackish and appeared to be contaminated with sewage",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n459","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Increased shadow coverage; not expected to limit use of open space substantially",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n81","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Mission Bay (potential Major New Site, with Brisbane Baylands/Executive Park and Harbor Bay)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n390","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","approximately 2.65 million gsf of development",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n512","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","299 to 313 acres",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n336","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Bay Mud generally unsuitable for foundation support",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n762","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","No site investigations have been conducted to confirm soil and groundwater contamination",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n431","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Major New Site could be located anywhere within Mission Bay planned development",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n318","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Bay Mud thickness nearly 70 feet along northern boundary",null,"segment","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n762","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Old Bay Clay thickness from less than 1 foot to about 40 feet",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n763","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","fill thickness less than 1 foot to more than 30 feet, averaging about 18 to 20 feet",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n762","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","9,100 total employees",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n488","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Site-specific geotechnical investigation and pile foundations to isolate structures from mud waves",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n765","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","residential, commercial and parking uses on about 69 acres",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n68","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Protect low-lying areas from sea level rise through setbacks, increased elevation and other methods",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n72","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","use","designated in approved plans for business park or industrial park use",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n338","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Possible reuse of Pier 52 for a new small boat hoist, temporary storage, or other support services",null,"parcel","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919175/page/n171","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Noise impacts expected to be similar to a Major New Site, including limited noise effects",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n605","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","500-room hotel",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n641","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Average weekday population of 8,250, including employees and visitors",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n550","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","areas of potential historical archaeological resources from the 19th century",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n538","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Pickleweed is an indicator species for northern coastal salt marsh, a sensitive habitat",null,"segment","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n485","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","candidate for potential major new campus",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n636","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Development Agreement terminated by developer; new plans being developed for Mission Bay north and south of China Basin Channel",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919175/page/n27","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","could be located at any site or combination of sites within the Mission Bay plan area",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n529","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","use","Stub of I-280, CalTrain operations, mobile home park, vacant land, golf driving range, industrial trucking and port-related uses",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n331","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","750,000 gsf of retail space",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n641","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Loose unengineered fill present beneath the surface",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n765","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","characterized as contaminated with hazardous materials from past industrial or railroad uses; conditions to be mitigated below significance",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n557","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","about 4,180 parking spaces",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n33","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Construction workers could be exposed to contaminated soil or groundwater if pre-construction remediation is not completed; significant impact",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n432","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Potentially significant impact: construction could disturb prehistoric and historic archaeological resources",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n81","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","documented in","Wireless telecommunications services (WTS) facilities siting guidelines",null,"area","Democracy's Library: Wireless telecommunications services (WTS) facilities siting guidelines","https://archive.org/details/C124915018/page/n22","ia:C124915018","x_dl_facts"],["1996","described in","about 12,100 new vehicular trips per day at full buildout",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n404","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Major New Site at Mission Bay, one of three sites considered in the 1996 LRDP",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n554","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Pacific herring spawn near the Bay shoreline at the mouth of the channel, December through March",null,"segment","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n485","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","would not have a significant visual effect",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n535","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Wastewater: 0.46 million gallons per day average dry weather flow (ADWF)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n498","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Development of a baseball stadium would worsen conditions on corridors serving the stadium area",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n387","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","communication facilities allowed as principal use in Moderate and High Density Residential Districts and prohibited in Lower Density Residential District",null,"area","Democracy's Library: Wireless telecommunications services (WTS) facilities siting guidelines","https://archive.org/details/C124915018/page/n22","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Could contribute to loss of integrity of existing and potential National Register resources; not a significant effect",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n83","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","location included in the 1990 Mission Bay EIR but not specifically analyzed by it",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n760","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Potential major new campus site, minimum 2.65 million gsf",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n612","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","reuse of Pier 52 for a new small boat hoist, temporary storage, or other support services",null,"parcel","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919184/page/n158","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","residential, open space and commercial uses",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n334","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","about 6 feet to 15 feet above mean sea level",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n458","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Bay Mud present beneath the surface",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n765","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","67 acres of open space south of China Basin Channel",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919184/page/n141","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","2.65 million gsf of research, academic, support and related space",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n488","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","area of potential inundation hazard due to tsunami run-up",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n458","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","No existing water supply problems or constraints have been identified for the Mission Bay area",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n507","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","313 acres",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n330","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","possible parking structure to deal with ballpark and neighborhood needs, pending analyses and future Mission Bay land use",null,"area","Democracy's Library: Review of the projected costs and economic benefits associated with the San Fra","https://archive.org/details/C124918144/page/n27","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Catellus Development Corporation, the Mission Bay developer",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n462","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Mission Bay (one of three potential sites)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n314","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Mission Bay alternative location",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Increase in MUNI ridership: less than significant impact",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n384","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","documented in","Draft EIR : long range development plan, University of California, San Francisco",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n760","ia:C124922850","x_dl_facts"],["1996","described in","potential significant impacts from contaminated sediments introduced into the sewer system and spread of groundwater contamination",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n35","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Implement Development Scenario Mitigation Measure 12H1-1",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n461","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","meets UCSF need for 3.43 million gsf at two smaller satellites instead of one Major New Site",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n41","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Vehicle operation air pollutant emissions: significant before mitigation, significant unavoidable after TDM measures; exceeds BAAQMD 80 lb/day threshold",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n61","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","reduced potential for casting new shadows at Mission Bay; impacts remain less than significant",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n601","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","documented in","Management audit of the San Francisco Municipal Railway",null,"area","Democracy's Library: Management audit of the San Francisco Municipal Railway","https://archive.org/details/C124921892/page/n103","ia:C124921892","x_dl_facts"],["1996","proposed","Potential Major New Site under consideration",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n46","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","UCSF would protect low-lying areas from sea level rise through setbacks, increased elevation and other methods in the Mission Bay Design Guidelines",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n463","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","1- to 2-story structures on spread footings or stiffened slabs",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n761","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","each building or complex to have an emergency response plan integrated with the City's plan",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n766","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Mission Bay in San Francisco",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n19","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Franciscan bedrock at about -30 to -130 feet msl",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n445","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Transit ridership effects would not be significant",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n33","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","1,665,000 gsf at Mission Bay",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n40","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Groundwater contamination highly likely in Mission Bay due to probable chemical releases, pesticide use, fuel spills, and leaking underground storage tanks",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n461","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","use as a University campus would concentrate Bay Area population in a geo-seismic hazard location",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n766","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Development Agreement terminated without implementation of the Plan",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n352","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","loose artificial fill, about 1 to more than 30 feet thick",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n444","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Mariposa Street west of I-280, Third Street south of Folsom Street and Fourth Street south of Howard Street pass through residential areas",null,"segment","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n416","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Potential requirement for an amendment to the Mission Bay Plan to change its land use mix",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","units","Total planned housing units expected to be retained (no number given)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n335","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","900,000 gsf commercial/light industrial space",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n68","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","impacts on transit service not expected to be significant",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n385","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Mitigation Measure 12H4-2: less than significant, none required",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n462","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","between 7.6 feet and 8.0 feet of wave run-up during the 500-year event",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n766","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Traffic noise levels expected to meet compatibility criteria for commercial uses",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n418","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","seven locations with potentially significant historical archaeological deposits",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n544","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","15 to 50 acres available to UCSF",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n615","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Adopt urban design guidelines with height variation, tower separation, mid-block paths or courts, and facade materials",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n534","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Construction noise: significant before mitigation, significant unavoidable after mitigation; exceeds local noise ordinance limits",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n61","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","peak demand for about 4,200 parking spaces",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n58","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Mission Bay site does not include sensitive habitat or species that would be disturbed by a Major New Site",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n558","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Would not be expected to change the overall housing and employment uses envisioned in the Mission Bay Plan",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","750,000 gsf retail space",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n68","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","would not create a significant impact (less than significant, no mitigation required)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n74","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Redevelopment plan for housing units, commercial retail and entertainment uses and shoreline open spaces",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919175/page/n26","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","several feet of total and differential settlement since filling began, more expected",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n444","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Mitigation measures would enable satisfactory LOS at four intersections serving the stadium",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n387","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","approximately 4 million square feet of office space north of China Basin Channel",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919175/page/n150","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","units","8,500 residential units",null,"area","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919184/page/n141","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Could be eligible for listing on the National Register",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n547","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","withdrew from the Mission Bay Development Agreement with the City and County of San Francisco",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n376","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Part of Mission Bay is below six feet mean sea level and certain areas would be subject to flooding without mitigating site design",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n463","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Surface runoff: no net increase in stormwater runoff expected; impact not substantially changed",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n462","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Compatible with existing land use in the area",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n335","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","No wetland issues would be involved in developing a Major New Site at Mission Bay",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n36","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","None required (Less Than Significant)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n418","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Expand the UCSF shuttle system to include the Major New Site (TDM measure)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n404","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Residents located in the houseboats; the only existing noise receptors in Mission Bay",null,"street","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n416","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","documented in","Review of the projected costs and economic benefits associated with the San Francisco Giants' proposed ballpark at China Basin",null,"area","Democracy's Library: Review of the projected costs and economic benefits associated with the San Fra","https://archive.org/details/C124918144/page/n27","ia:C124918144","x_dl_facts"],["1996","described in","98 lb/day of NOx and 206 lb/day of PM10 would exceed BAAQMD significance thresholds",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n404","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Channel supports a minor amount of wetland vegetation, a pickleweed fringe above the high tide line",null,"segment","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n484","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","1,665,000 gsf",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n602","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Construction could expose workers to contaminated soil or groundwater if pre-construction remediation is not completed",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n433","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","buildings up to 75 feet in height",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n535","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Potential historic archaeological resources; effects less than significant with mitigation",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n37","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Develop a Storm Water Pollution Prevention Plan (Mitigation Measure 12H1-1)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n72","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","proposed","Accommodate expanded boat trailer parking areas in the design of the open space",null,"segment","Democracy's Library: Port of San Francisco waterfront land use plan : draft for public review and co","https://archive.org/details/C124919184/page/n158","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","area","67.9 acres of open space",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n641","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","significant unavoidable air quality impact from vehicular traffic (NOx and PM10)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n566","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","One-hour average CO existing 8.1 ppm",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n403","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Existing L_dn noise levels range from the high 60s to the low 70s dBA",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n416","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","documented in","Community safety : draft for citizen review : an element of the Master plan of the City and County of San Francisco",null,"area","Democracy's Library: Community safety : draft for citizen review : an element of the Master plan of ","https://archive.org/details/C124916696/page/n33","ia:C124916696","x_dl_facts"],["1996","described in","Withdrawal of Catellus from Mission Bay Development Agreement; Mission Bay Plan and zoning remain applicable land use controls",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n331","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","1,730 vehicle trips in the am peak hour",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n377","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Significant impact on historic archaeological resources during construction",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n547","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","electricity demand based on 72 percent of Parnassus Heights use",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n508","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","front door-only boarding during peak periods would seriously degrade schedule adherence",null,"area","Democracy's Library: Management audit of the San Francisco Municipal Railway","https://archive.org/details/C124921892/page/n103","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Re-establish a working relationship with Catellus to maintain obligations on housing and environment",null,"area","Democracy's Library: San Francisco economic summit, April 16-17, 1996 : final report","https://archive.org/details/C124921856/page/n27","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Worker exposure to contaminated soil or groundwater during construction (12F4-1), if pre-construction remediation is not completed",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n68","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996","described in","Increase water demand of 0.37 mgd, 0.4 percent of existing use of 90 mgd; could be served within existing and planned supply capacity",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n79","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996-11-21","proposed","Planning Commission adopts said amendments to the General Plan and recommends them to the Board of Supervisors",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n331","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1996-11-21","proposed","General Advertising Signs on Transit Stations and Public Service Kiosks",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n331","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","proposed","Create a new waterfront walkway from the Third Street Bridge extending along Terry Francois Boulevard",null,"segment","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n109","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","area","increase Commercial-Light Industrial space from 900,000 to 1,020,000 square feet",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n359","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","proposed","Catellus and other housing acreage changed to 72.8 acres",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n360","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Objectives and policies published separately as the Mission Bay Plan, organized as a Specific Plan",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n52","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Hazardous waste mitigation measures N.1 and N.2 rejected; information to be generated for DPH and SWQCB",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n357","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Boundary changes exclude Seawall Lot 337 from the Plan area",null,"parcel","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n114","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview11unse_4","ia:potreroview11unse_4","showcase_search"],["1997","area","Commercial-Light Industrial space increased from 900,000 to 1,020,000 square feet",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n353","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Create a major open space",null,"parcel","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n114","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","74% of residents rent, versus 65% citywide",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n106","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","95 foot height limit retained for the Site",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n355","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","$857 (≈ $1,799 in 2026 dollars) median rent, 29% above citywide median ($662 (≈ $1,390 in 2026 dollars))",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n106","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","area","300+ acre redevelopment area, the largest single redevelopment site in San Francisco",null,"area","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n109","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","documented in","San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n356","ia:C124922692","x_dl_facts"],["1997","described in","Project site exempted from the area wide Transportation Management Program",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n358","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","stories","six floors",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n364","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","proposed","Commercial light industrial changed to 1,020,000 sq ft and 11.2 acres",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n360","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview10unse_3","ia:potreroview10unse_3","showcase_search"],["1997","described in","vertical facade changes at a maximum of 50 foot intervals for residential uses",null,"area","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n115","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","approximately 3,600 passengers southbound peak load within Mission Bay, 4 p.m. to 6 p.m.",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n182","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Development agreement between City and County of San Francisco and Catellus Development Corporation",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n52","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","analysis started",null,"area","Democracy's Library: Revised draft environmental impact statement/environmental impact report for th","https://archive.org/details/C124910717/page/n576","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","No subsequent or supplemental EIR is required",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n356","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","use","Public boat launch with adjoining waterfront edge access",null,"area","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","8.2% of total gross receipts of citywide establishments",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n106","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","area","Six acres reserved for maritime support activities",null,"parcel","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n114","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","documented in","San Francisco neighborhood profiles",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n111","ia:C123300590","x_dl_facts"],["1997","described in","does not raise important new issues about the significant effects of the Project",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n357","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","2.5 off-street parking spaces per 1,000 sq ft of office/commercial/light industrial development as accessory parking",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n355","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","proposed","CPC R14467-8; BoS Ord. 026-98",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between A","https://archive.org/details/C124922683/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","proposed","16th/I-280/King alignment through Mission Bay eliminated by PTC",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n79","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","documented in","The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan",null,"area","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n109","ia:C124919111","x_dl_facts"],["1997","proposed","8,500 new housing units",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n360","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","area","over six million square feet for employment",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n58","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","area","Commercial-Light Industrial space increased from 900,000 to 1,020,000 square feet",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n353","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Add block numbers 29, 29A, 34 and 34A",null,"block","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n363","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","About 2% of San Francisco's total population",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n106","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","units","Up to 150 live-work units in about 75,000 square feet along the Third Street corridor",null,"street","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n362","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","units","reduce housing and reallocate 464 dwelling units to other Mission Bay blocks",null,"block","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n353","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","units","8,000 new housing units",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n58","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","About 23,500 permanent private sector jobs",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n363","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","analysis started",null,"area","Democracy's Library: Final environmental impact statement for the disposal and reuse of Hunters Poin","https://archive.org/details/C124922531/page/n524","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","No longer in use due to deteriorated condition",null,"parcel","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n113","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","proposed","Improvements to the public boat launch and 400 feet of waterfront edge",null,"segment","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n32","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","units","About 8,500 new units, approximately 3,250 affordable; City to construct 2,300 units on about 26 acres of Project Sponsor property",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n362","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","residential land use 36% of total building area",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n106","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","area","approximately 260 acres",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n54","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","City 2,300 housing units includes 266 units; Catellus 5,970 housing units includes 198 units on other sites",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n360","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","area","approximately 313 acres",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n44","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","area","315 acres",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n57","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Mitigation Measure E.5 (Area Wide TMP) is hereby rejected; site-specific TMP required before first Certificate of Occupancy",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n358","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Planning Commission public hearing on Mission Bay Plan amendments",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n356","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","residence values 15% higher than citywide; office values 49% lower than citywide",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n106","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","proposed","coordinate maritime and public access improvements with Mission Bay development",null,"area","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n115","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Commerce and Industry Design Guidelines do not allow billboards",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n329","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","about 100 primarily industrial uses",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n44","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","separate major new development from the waterfront by open space west of Terry Francois Boulevard",null,"street","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n115","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","proposed","Housing acreage changed to 96.3 acres",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n360","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Site largely on filled land; planning included geotechnical assessments",null,"area","Democracy's Library: Community safety : implementation programs : an element of the Master plan of t","https://archive.org/details/C124916243/page/n8","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Remove dilapidated Pier 64 as funds become available",null,"parcel","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n113","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","6.8% of total jobs citywide",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n106","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","area","3.7 acre development site",null,"parcel","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n352","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","units","A total of another 441 affordable units may be added in blocks designated A; another 268 market rate units and 125 affordable units elsewhere",null,"block","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n362","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","use","Open space on south side of China Basin Channel",null,"segment","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n30","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","proposed","Additional approximately 250 affordable housing units by City and Catellus",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n360","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","area","an additional 330 acres of marsh",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n54","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","proposed","hazardous waste mitigation measures rejected",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n357","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Planning Commission initiated proposed amendments",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n354","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","proposed","Future open space in the Mission Bay area",null,"area","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n22","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Site removed from the area-wide Transportation Management Program of the Plan",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n355","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Project is included within the scope of the development analyzed in the Mission Bay FEIR",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n356","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Resolution No. 14355 adopting Mission Bay Plan amendments",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n357","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Amendments related to the development of the UCSF Laboratory Building",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n19","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","allowing general advertising signs on transit shelters and transit boarding platforms",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n330","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","concerns place","Minutes",null,"area","SF Public Library scans: Minutes","https://archive.org/details/minutes1997sanf_4","ia:minutes1997sanf_4","showcase_search"],["1997","proposed","Resolution Adopting Mission Bay Plan Amendments related to Owens, Sixth and Sixteenth Streets",null,"street","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n357","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","proposed","adopting General Plan Amendments allowing General Advertising Signs on Transit Stations and Public Service Kiosks",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n330","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","approximately 3,900 passengers northbound peak load within Mission Bay, 7 a.m. to 9 a.m.",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n182","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","unemployment rate 6.7%, slightly higher than citywide 6.3%",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n106","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Office of Environmental Review published FEIR Addendum No. 2, File No. 96.684E",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n354","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","documented in","Community safety : implementation programs : an element of the Master plan of the City and County of San Francisco",null,"area","Democracy's Library: Community safety : implementation programs : an element of the Master plan of t","https://archive.org/details/C124916243/page/n8","ia:C124916243","x_dl_facts"],["1997","units","3,000 units of affordable housing on-site",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n48","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","incorporated by reference, as set forth in Attachment A to Resolution No. 12040 and modified in Resolution No. 13017",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n357","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","plan being prepared; public access to shoreline and adequate parks and public open space to be considered",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between A","https://archive.org/details/C124922683/page/n84","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Establish an east/west view and circulation corridor through the mid-portion of the lot",null,"parcel","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n114","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","proposed","Proposed linear open space running parallel to Terry Francois Boulevard",null,"street","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n113","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Total permitted development in commercial-light industrial district (Block 45 and portions of Blocks 29, 29A, 34, 34A) is 1,020,000 square feet",null,"block","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n363","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Amendments do not affect any landmarks or historic buildings",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n356","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","proposed","Resolution No. 14355 adopting Mission Bay Plan amendments",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n355","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview08unse_2","ia:potreroview08unse_2","showcase_search"],["1997","described in","Planning Commission hearing on the amendments",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n358","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","proposed","Commercial-light industrial space changed to 1,020,000 sq ft",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n360","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","proposed","eliminated by PTC",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n27","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Amends text of the Proposed Transportation Management Program for Mission Bay, p.36",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n20","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","use","Long-term reserve sites for cargo shipping uses",null,"parcel","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n109","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","consistent with the Priority Policies of Planning Code Section 101.1",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n330","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","FEIR adequate, accurate and objective (Motion No. 12006)",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n101","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Assessor's Blocks 3795-3798, 3804-3806, 3809, 3810, 3813, 3819, 3822, 3832, 3835, 3837-3841, 3849-3853, 3880, 3892, 3942, and 3944",null,"block","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n44","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","1.74 workers per thousand sq. feet of non-residential net land area; citywide average 3.37",null,"area","Democracy's Library: San Francisco neighborhood profiles","https://archive.org/details/C123300590/page/n111","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","use","Planted area and fishing pier with views of Pier 70",null,"segment","Democracy's Library: The Port of San Francisco waterfront design & access : an element of the Waterf","https://archive.org/details/C124919111/page/n30","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","plan for development in this area, consistent with the Central Waterfront deletion",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n210","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","described in","Billboards are not allowed, except general advertising signs on transit shelters or boarding platforms",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n332","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","proposed","City of S.F. affordable housing acreage changed to 23.7 acres",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n360","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","units","Up to 256 714 additional units can be accommodated in association with other uses on these sites",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n362","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997","proposed","Resolution No. 14355 adopting Mission Bay Plan amendments",null,"street","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n356","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997-04-10","units","2,266 affordable units shown; amended to 1,934 affordable units at specific sites",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n362","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1997-04-10","units","Up to 256 516 affordable units and 198 market rate units added by City and Catellus south of the Channel",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between S","https://archive.org/details/C124922692/page/n362","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","area","350,000 square feet retail complex close to the ballpark",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n239","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","500-room hotel",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n63","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","area","65 acres between Third and Seventh Streets",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n239","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","Vehicles presently parking on the affected segments",null,"segment","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n207","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","Flat, open expanse extending the length of Segment 5",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n271","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","Retained station locations; added a second Mission Bay station south of Mission Creek",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n80","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","units","over 6,000 dwelling units",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n25","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","proposed","mixed-use development including retail space, UCSF extension campus, light manufacturing, public school, hotel, police and fire stations, and residential units",null,"area","Democracy's Library: Revised draft environmental impact statement/environmental impact report for th","https://archive.org/details/C124910717/page/n113","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","concerns place","Design for development for the Mission Bay north project area",null,"area","SF Public Library scans: Design for development for the Mission Bay north project area","https://archive.org/details/designfordevelop1719sanf","ia:designfordevelop1719sanf","showcase_search"],["1998","conveyed","narrow strips of land totaling approximately 975 square meters, to be donated by Catellus",null,"segment","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n342","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","3.7-meter (12-foot) wide sidewalks along Third and Fourth Streets",null,"segment","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n213","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","concerns place","Mission Bay subsequent environmental impact report : final",null,"area","SF Public Library scans: Mission Bay subsequent environmental impact report : final","https://archive.org/details/missionbaysubseq1719sanf","ia:missionbaysubseq1719sanf","showcase_search"],["1998","described in","new UCSF campus and biotechnology/light industrial uses",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n100","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","Objectives and policies for the Mission Bay subarea, published separately as a Specific Plan",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between A","https://archive.org/details/C124922683/page/n28","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","Expand transit services to, from, through and within Mission Bay",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n487","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","concerns place","Redevelopment plan for the Mission Bay North Project Area",null,"area","SF Public Library scans: Redevelopment plan for the Mission Bay North Project Area","https://archive.org/details/redevelopmentpla2619sanf","ia:redevelopmentpla2619sanf","showcase_search"],["1998","described in","no existing community or public facilities would be affected by building activities",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n352","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","area","600,000 square feet of retail/commercial space",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n239","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","Area of historic industrial use",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n305","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","proposed","Mission Bay Alignment Option 2",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n105","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","conveyed","strip of land totaling 510 square meters required from the Port of San Francisco",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n342","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","area","250,000 square feet of retail uses",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n239","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview02unse_3","ia:potreroview02unse_3","showcase_search"],["1998","units","3,000 housing units",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n239","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","City certified completion of a Subsequent EIR",null,"area","Democracy's Library: Final environmental impact statement for the disposal and reuse of Hunters Poin","https://archive.org/details/C124922531/page/n103","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","area","900,000 square feet of industrial and institutional space",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n230","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","Light rail in exclusive right-of-way except as noted",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n105","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","units","8,700 residential units",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n230","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","DSEIR published",null,"area","Democracy's Library: Final environmental impact statement for the disposal and reuse of Hunters Poin","https://archive.org/details/C124922531/page/n524","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","concerns place","Mission Bay subsequent environmental impact report : draft",null,"area","SF Public Library scans: Mission Bay subsequent environmental impact report : draft","https://archive.org/details/missionbaysubseq1998sanf","ia:missionbaysubseq1998sanf","showcase_search"],["1998","proposed","Amendments to Chapter 4 of the Mission Bay Plan",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between A","https://archive.org/details/C124922683/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","Light rail would help facilitate redevelopment of Mission Bay",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n344","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","proposed","development plan incorporating a UCSF campus",null,"area","Democracy's Library: Revised draft environmental impact statement/environmental impact report for th","https://archive.org/details/C124910717/page/n400","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","Planned development, facilitated by improved light rail transit service, including relocation of UCSF research facilities",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n338","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","almost 470 displaced parking spaces in Mission Bay",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n36","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","possible noise sensitive receptors (residences, schools, day care facilities) may be planned",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n420","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","proposed","proposed redevelopment with planned residential, UCSF, laboratory and childcare uses",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n328","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","25-screen cineplex",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n63","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","Parking displaced on Third and Fourth Streets",null,"segment","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n207","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","Five sites with reported unauthorized releases of TPH from leaking USTs",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n305","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","area","2,781,000 sq ft of research and development space",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n63","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","documented in","Revised draft environmental impact statement/environmental impact report for the disposal and reuse of Hunters Point Shipyard",null,"area","Democracy's Library: Revised draft environmental impact statement/environmental impact report for th","https://archive.org/details/C124910717/page/n400","ia:C124910717","x_dl_facts"],["1998","described in","All parking on Third Street and existing Fourth Street between King and Mariposa displaced for Mission Bay project; impact not significant",null,"segment","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n41","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","substantial job growth anticipated during next 20 years",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n251","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","proposed","Redevelopment Plan and Design Guidelines adopted",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : final draft fo","https://archive.org/details/C124925579/page/n206","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","two-car light rail trains expected only at four proposed Mission Bay stations",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n214","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","area","1,476,000 sq ft of office space",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n63","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","area","approximately four acres of open space along the north shore of the channel",null,"segment","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n239","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","proposed","restripe roadway for four lanes of traffic and two bicycle lanes",null,"street","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n87","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","area","over six million square feet of employment",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between A","https://archive.org/details/C124922683/page/n36","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","area","43 acres",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n239","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","planned for large scale redevelopment",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n254","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","Total weekday peak-hour trips between Mission Bay and Market Street, Mission Bay development assumptions",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n512","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","Planned redevelopment",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n338","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","documented in","Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n432","ia:C124915258","x_dl_facts"],["1998","units","3,000 new housing units north of China Basin",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n230","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","500-room hotel",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n239","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","tax increment from adjacent redevelopment project areas: Bayview Hunter’s Point, India Basin, Mission Bay",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n451","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","area","100,000 sq ft of restaurant space",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n63","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","area","5 million square feet of office space",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n230","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","Total weekday peak-hour Third Street LRT/MUNI Metro Extension trips between Mission Bay and Market Street, EIR assumptions (Mission Bay buildout assumed)",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n512","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","concerns place","Mission Bay subsequent environmental impact report : draft",null,"area","SF Public Library scans: Mission Bay subsequent environmental impact report : draft","https://archive.org/details/missionbaysubse1998sanf_0","ia:missionbaysubse1998sanf_0","showcase_search"],["1998","described in","DSEIR published",null,"area","Democracy's Library: Revised draft environmental impact statement/environmental impact report for th","https://archive.org/details/C124910717/page/n576","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","use","small houseboat community",null,"segment","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n247","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","concerns place","Mission Bay subsequent environmental impact report : final",null,"area","SF Public Library scans: Mission Bay subsequent environmental impact report : final","https://archive.org/details/missionbaysubse1719sanf_2","ia:missionbaysubse1719sanf_2","showcase_search"],["1998","units","6,090 dwelling units",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n63","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","area","1,263,000 sq ft of retail space",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n63","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","concerns place","Mission Bay subsequent environmental impact report : final",null,"area","SF Public Library scans: Mission Bay subsequent environmental impact report : final","https://archive.org/details/missionbaysubse1719sanf_0","ia:missionbaysubse1719sanf_0","showcase_search"],["1998","proposed","proposed Mission Bay development",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n179","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","concerns place","Mission Bay subsequent environmental impact report : final",null,"area","SF Public Library scans: Mission Bay subsequent environmental impact report : final","https://archive.org/details/missionbaysubse1719sanf_1","ia:missionbaysubse1719sanf_1","showcase_search"],["1998","proposed","Proposed development whose increased flows add to cumulative storm drain/sewer load",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n385","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","Text amended",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between A","https://archive.org/details/C124922683/page/n14","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","Net gain of parking spaces within Mission Bay",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n207","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","City and County of San Francisco Redevelopment Agency and Department of City Planning",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n63","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","City certified completion of a Subsequent EIR for the Mission Bay project",null,"area","Democracy's Library: Revised draft environmental impact statement/environmental impact report for th","https://archive.org/details/C124910717/page/n113","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","key infrastructure improvement supporting planned development in Mission Bay",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n24","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","net gain of about 40 parking spaces within Mission Bay",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n36","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","units","8,270 new housing units",null,"area","Democracy's Library: San Francisco general plan : amendments to the general plan : adopted between A","https://archive.org/details/C124922683/page/n36","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","concerns place","Mission Bay subsequent environmental impact report : draft",null,"area","SF Public Library scans: Mission Bay subsequent environmental impact report : draft","https://archive.org/details/missionbaysubse1998sanf_1","ia:missionbaysubse1998sanf_1","showcase_search"],["1998","area","2,650,000 sq ft developed space for the new UCSF campus",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n63","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","units","3,000 new housing units south of China Basin",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n230","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","hotel complex planned",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n420","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","500-room hotel",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n25","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","concerns place","Design for development for the Mission Bay South Project Area",null,"area","SF Public Library scans: Design for development for the Mission Bay South Project Area","https://archive.org/details/designfordevelo1719sanf_0","ia:designfordevelo1719sanf_0","showcase_search"],["1998","proposed","six new traction power substations",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n365","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","Redevelopment expected to proceed whether or not the light rail line is built",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n432","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","approximately 9,000 workers",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n239","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","street grid south of Mission Creek proposed to be altered",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n100","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","area","600,000 square feet of commercial retail and entertainment space",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n230","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","area","approximately five million square feet of office and industrial space",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n239","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","light rail travels through Mission Bay, which is undergoing redevelopment planning",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n100","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","proposed","Mission Bay alignment sub-options Third/King or 16th/I-280/King",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n77","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","additional 12,000 jobs from retail, office and industrial uses",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n239","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","slated for redevelopment with relatively high density housing and UCSF research relocation",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n247","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","concerns place","Redevelopment plan for the Mission Bay South Project Area",null,"area","SF Public Library scans: Redevelopment plan for the Mission Bay South Project Area","https://archive.org/details/redevelopmentpla2199sanf","ia:redevelopmentpla2199sanf","showcase_search"],["1998","units","maximum of 3,000 residential units",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n239","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","described in","Would replace the current Mission Bay Plan",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n231","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1998","proposed","dropped because of conflicting land use with planned UCSF campus",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n78","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1999","described in","Land Exchange Agreements recorded between City, Port, State and Catellus Development Corporation",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 2000","https://archive.org/details/igsl_san-francisco-real-prop-report_2000/page/n5","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1999","described in","future operating shortfalls foreseen as service extensions into Mission Bay demand more resources",null,"area","Democracy's Library: A plan to fix Muni : a special report","https://archive.org/details/C124921218/page/n26","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1999","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview07unse_4","ia:potreroview07unse_4","showcase_search"],["1999","proposed","15 minute peak and 60 minute off-peak headways from Berkeley to San Francisco/Mission Bay to Alameda",null,"area","Democracy's Library: Bay area transportation blueprint for the 21st century. Project notebook of can","https://archive.org/details/C124923818/page/n113","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1999","documented in","A plan to fix Muni : a special report",null,"area","Democracy's Library: A plan to fix Muni : a special report","https://archive.org/details/C124921218/page/n26","ia:C124921218","x_dl_facts"],["1999","documented in","Bay area transportation blueprint for the 21st century. Project notebook of candidate projects",null,"area","Democracy's Library: Bay area transportation blueprint for the 21st century. Project notebook of can","https://archive.org/details/C124923818/page/n113","ia:C124923818","x_dl_facts"],["1999","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview03unse_4","ia:potreroview03unse_4","showcase_search"],["1999","described in","Total Annual Operating Cost $3.2 million (≈ $6.5 million in 2026 dollars); farebox recovery 53%",null,"segment","Democracy's Library: Bay area transportation blueprint for the 21st century. Project notebook of can","https://archive.org/details/C124923818/page/n66","qipu:sf/place/fill/mission-bay","x_dl_facts"],["1999","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview06unse_4","ia:potreroview06unse_4","showcase_search"],["1999","documented in","Real property owned by the city and county of San Francisco / 2000",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 2000","https://archive.org/details/igsl_san-francisco-real-prop-report_2000/page/n5","ia:igsl_san-francisco-real-prop-report_2000","x_dl_facts"],["2000","described in","Assumed completion of ballpark in year 2000",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n387","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","described in","connects growing housing and employment in Mission Bay with downtown",null,"area","Democracy's Library: Bay area transportation blueprint for the 21st century. Project notebook of can","https://archive.org/details/C124923818/page/n266","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","proposed","new Mission Bay development plan incorporating a UCSF campus",null,"area","Democracy's Library: Final environmental impact statement for the disposal and reuse of Hunters Poin","https://archive.org/details/C124922531/page/n339","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","described in","Reduction in estimated CSOs",null,"area","Democracy's Library: Final environmental impact statement for the disposal and reuse of Hunters Poin","https://archive.org/details/C124922522/page/n353","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","described in","Construction of the IOS commences; Mission Bay development ongoing; Pacific Bell Ballpark in final construction stages",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n373","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","documented in","Final environmental impact statement for the disposal and reuse of Hunters Point Shipyard",null,"area","Democracy's Library: Final environmental impact statement for the disposal and reuse of Hunters Poin","https://archive.org/details/C124922522/page/n353","ia:C124922522","x_dl_facts"],["2000","described in","Vortex-type treatment units at each of five outfalls treat all storm water flows",null,"area","Democracy's Library: Final environmental impact statement for the disposal and reuse of Hunters Poin","https://archive.org/details/C124922522/page/n262","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","described in","available space in the reuse plan limited sand filters to two segments of the project",null,"area","Democracy's Library: Final environmental impact statement for the disposal and reuse of Hunters Poin","https://archive.org/details/C124922522/page/n373","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","area","approximately 43 acres donated by Catellus and the City",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 2000","https://archive.org/details/igsl_san-francisco-real-prop-report_2000/page/n5","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","described in","first phase projected to begin construction in mid-1998 and open",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n239","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","described in","PUC assisting Catellus in feasibility study of on-site wastewater treatment",null,"area","Democracy's Library: Final environmental impact statement for the disposal and reuse of Hunters Poin","https://archive.org/details/C124922522/page/n358","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","described in","analysis based on San Francisco Redevelopment Agency cumulative scenario",null,"area","Democracy's Library: Final environmental impact statement for the disposal and reuse of Hunters Poin","https://archive.org/details/C124922531/page/n336","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","documented in","Final environmental impact statement for the disposal and reuse of Hunters Point Shipyard",null,"area","Democracy's Library: Final environmental impact statement for the disposal and reuse of Hunters Poin","https://archive.org/details/C124922531/page/n339","ia:C124922531","x_dl_facts"],["2000","described in","Caltrain linkage to South-of-Market development, including PacBell Stadium and Mission Bay",null,"area","Democracy's Library: Bay area transportation blueprint for the 21st century. Project notebook of can","https://archive.org/details/C124923818/page/n248","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","held by department","Department of Public Works",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 2000","https://archive.org/details/igsl_san-francisco-real-prop-report_2000/page/n66","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","proposed","new Police/Fire Station",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 2000","https://archive.org/details/igsl_san-francisco-real-prop-report_2000/page/n5","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","described in","developer committed to separated system; saves $800,000 (≈ $1.6 million in 2026 dollars) over combined system",null,"area","Democracy's Library: Final environmental impact statement for the disposal and reuse of Hunters Poin","https://archive.org/details/C124922522/page/n330","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","units","up to 1,100 affordable rental and for sale residential units",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 2000","https://archive.org/details/igsl_san-francisco-real-prop-report_2000/page/n5","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","proposed","Replace existing ferries with high-speed ferries (25 knots) and extend service to Mission Bay",null,"segment","Democracy's Library: Bay area transportation blueprint for the 21st century. Project notebook of can","https://archive.org/details/C124923818/page/n66","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","described in","Sanitary sewage directed to SEWPCP at build-out",null,"area","Democracy's Library: Final environmental impact statement for the disposal and reuse of Hunters Poin","https://archive.org/details/C124922522/page/n353","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","proposed","Mixed-use development including retail, a UCSF extension campus, light manufacturing, public school, hotel, police and fire stations, and residential units",null,"area","Democracy's Library: Final environmental impact statement for the disposal and reuse of Hunters Poin","https://archive.org/details/C124922531/page/n103","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","described in","will send close to a billion gallons of sewage to Bayview",null,"area","Democracy's Library: Final environmental impact statement for the disposal and reuse of Hunters Poin","https://archive.org/details/C124922522/page/n326","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","described in","$22.4 million (≈ $43.8 million in 2026 dollars) (capital, includes feeder bus costs)",null,"area","Democracy's Library: Bay area transportation blueprint for the 21st century. Project notebook of can","https://archive.org/details/C124923818/page/n280","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","proposed","open space site, exact location not yet determined",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 2000","https://archive.org/details/igsl_san-francisco-real-prop-report_2000/page/n6","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","area","approximately 50 acres of parks and community facilities",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 2000","https://archive.org/details/igsl_san-francisco-real-prop-report_2000/page/n5","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","described in","Increase in storm water discharged to the Bay",null,"area","Democracy's Library: Final environmental impact statement for the disposal and reuse of Hunters Poin","https://archive.org/details/C124922522/page/n353","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","documented in","Neglect of reporting requirements : interim report : report of the 1999-2000 San Francisco Civil Grand Jury",null,"area","Democracy's Library: Neglect of reporting requirements : interim report : report of the 1999-2000 Sa","https://archive.org/details/C101744619/page/n46","ia:C101744619","x_dl_facts"],["2000","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview02unse_10","ia:potreroview02unse_10","showcase_search"],["2000","described in","listed in Neglect of Reporting Requirements table (Table 1)",null,"area","Democracy's Library: Neglect of reporting requirements : interim report : report of the 1999-2000 Sa","https://archive.org/details/C101744619/page/n46","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","described in","no land set aside for the separated system option",null,"area","Democracy's Library: Final environmental impact statement for the disposal and reuse of Hunters Poin","https://archive.org/details/C124922522/page/n521","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","described in","land is very tight; no place identified for sand filters, grassy swales or a treatment facility",null,"area","Democracy's Library: Final environmental impact statement for the disposal and reuse of Hunters Poin","https://archive.org/details/C124922522/page/n521","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","described in","Route run in 30 minutes; 30 minute peak headways, 60 minute off-peak headways",null,"segment","Democracy's Library: Bay area transportation blueprint for the 21st century. Project notebook of can","https://archive.org/details/C124923818/page/n66","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000","described in","all storm water flows treated by Vortex-type treatment units installed at five outfalls",null,"area","Democracy's Library: Final environmental impact statement for the disposal and reuse of Hunters Poin","https://archive.org/details/C124922522/page/n373","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000/2020","held by department","Fire Department",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 2001","https://archive.org/details/igsl_san-francisco-real-prop-report_2001/page/n73","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2000/2020","held by department","Fire Department",null,"address","Democracy's Library: Real property owned by the city and county of San Francisco / 2001","https://archive.org/details/igsl_san-francisco-real-prop-report_2001/page/n127","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2001","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview05unse_7","ia:potreroview05unse_7","showcase_search"],["2001","described in","Mission Bay land exchanges between City, Port, State and Catellus Development Corporation not yet reflected in property book",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 2001","https://archive.org/details/igsl_san-francisco-real-prop-report_2001/page/n11","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2001","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview04unse_4","ia:potreroview04unse_4","showcase_search"],["2001","documented in","Real property owned by the city and county of San Francisco / 2001",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 2001","https://archive.org/details/igsl_san-francisco-real-prop-report_2001/page/n11","ia:igsl_san-francisco-real-prop-report_2001","x_dl_facts"],["2001","documented in","Data and needs analysis : part one of the Housing element revision : an element of the San Francisco general plan",null,"area","Democracy's Library: Data and needs analysis : part one of the Housing element revision : an element","https://archive.org/details/C124925153/page/n65","ia:C124925153","x_dl_facts"],["2001","described in","will include new public open space to serve the residents of its 6,000 new units",null,"area","Democracy's Library: Data and needs analysis : part one of the Housing element revision : an element","https://archive.org/details/C124925153/page/n73","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2001","units","Undeveloped Sites 1,893 potential new units",null,"area","Democracy's Library: Data and needs analysis : part one of the Housing element revision : an element","https://archive.org/details/C124925153/page/n65","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2001","units","Soft Sites 1,806 potential new units",null,"area","Democracy's Library: Data and needs analysis : part one of the Housing element revision : an element","https://archive.org/details/C124925153/page/n65","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2002","units","1,630 new units (undeveloped sites)",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : draft for publ","https://archive.org/details/C101694856/page/n70","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2002","described in","new development sends sewage to the SE Plant",null,"area","Democracy's Library: San Francisco Public Utilities Infrastructure Task Force : final report : June ","https://archive.org/details/C101694962/page/n72","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2002","described in","on-site wastewater treatment should be encouraged as part of the planning process; developers should bear a fair share of such costs",null,"area","Democracy's Library: San Francisco Public Utilities Infrastructure Task Force : final report : June ","https://archive.org/details/C101694962/page/n16","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2002","units","2,000 multi-family residences",null,"area","Democracy's Library: Disposal and reuse of Naval Station Treasure Island : draft environmental impac","https://archive.org/details/C101747471/page/n362","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2002","described in","PUC inaction cost opportunities for a cleaner, fairer, cheaper wastewater system",null,"area","Democracy's Library: San Francisco Public Utilities Infrastructure Task Force : final report : June ","https://archive.org/details/C101694962/page/n70","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2002","documented in","Housing element : an element of the San Francisco general plan : draft for public review",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : draft for publ","https://archive.org/details/C101694856/page/n79","ia:C101694856","x_dl_facts"],["2002","described in","Mission Bay land exchanges between City, Port, State and Catellus Development Corporation not yet reflected in property book",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 2002","https://archive.org/details/igsl_san-francisco-real-prop-report_2002/page/n3","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2002","units","potential construction of 2000 multi-family residences",null,"area","Democracy's Library: Disposal and reuse of Naval Station Treasure Island : draft environmental impac","https://archive.org/details/C101747471/page/n360","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2002","described in","new neighborhood planned in Redevelopment area providing housing in a variety of unit sizes at market and affordable rates",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : draft for publ","https://archive.org/details/C101694856/page/n92","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2002","area","up to 400,000 square feet of urban entertainment retail area",null,"area","Democracy's Library: Disposal and reuse of Naval Station Treasure Island : draft environmental impac","https://archive.org/details/C101747471/page/n360","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2002","documented in","Disposal and reuse of Naval Station Treasure Island : draft environmental impact statement",null,"area","Democracy's Library: Disposal and reuse of Naval Station Treasure Island : draft environmental impac","https://archive.org/details/C101747471/page/n360","ia:C101747471","x_dl_facts"],["2002","documented in","Real property owned by the city and county of San Francisco / 2002",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 2002","https://archive.org/details/igsl_san-francisco-real-prop-report_2002/page/n3","ia:igsl_san-francisco-real-prop-report_2002","x_dl_facts"],["2002","documented in","San Francisco Public Utilities Infrastructure Task Force : final report : June 1, 2000-June 17, 2002",null,"area","Democracy's Library: San Francisco Public Utilities Infrastructure Task Force : final report : June ","https://archive.org/details/C101694962/page/n16","ia:C101694962","x_dl_facts"],["2002","described in","analysis remains unfinished; significant TRC and public comments not considered or incorporated",null,"area","Democracy's Library: San Francisco Public Utilities Infrastructure Task Force : final report : June ","https://archive.org/details/C101694962/page/n75","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2002","described in","Complete the Mission Bay analysis",null,"area","Democracy's Library: San Francisco Public Utilities Infrastructure Task Force : final report : June ","https://archive.org/details/C101694962/page/n71","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2002","described in","Mission Bay alternative sewage study is unfinished",null,"area","Democracy's Library: San Francisco Public Utilities Infrastructure Task Force : final report : June ","https://archive.org/details/C101694962/page/n70","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2002","described in","Affordable Housing Fund responds to housing opportunities outside Redevelopment Project or Survey Areas and outside Mission Bay",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : draft for publ","https://archive.org/details/C101694856/page/n121","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2002","described in","Share wastewater treatment responsibility with new developments such as Mission Bay",null,"area","Democracy's Library: San Francisco Public Utilities Infrastructure Task Force : final report : June ","https://archive.org/details/C101694962/page/n77","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2002","described in","EPA-funded site-specific study of sustainable wastewater treatment options",null,"area","Democracy's Library: San Francisco Public Utilities Infrastructure Task Force : final report : June ","https://archive.org/details/C101694962/page/n74","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2002","documented in","Climate action plan for San Francisco local actions to reduce greenhouse emissions",null,"area","Democracy's Library: Climate action plan for San Francisco local actions to reduce greenhouse emissi","https://archive.org/details/p16255coll1_H1371674965007_file2/page/n135","ia:p16255coll1_H1371674965007_file2","x_dl_facts"],["2002","units","1,124 new units (soft sites)",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : draft for publ","https://archive.org/details/C101694856/page/n70","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2002","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview10unse_8","ia:potreroview10unse_8","showcase_search"],["2002","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview11unse_9","ia:potreroview11unse_9","showcase_search"],["2002","units","6,000 new units",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : draft for publ","https://archive.org/details/C101694856/page/n79","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2002","described in","Flooding from sea level rise would require vast investments in dikes, pumping stations or other infrastructure",null,"area","Democracy's Library: Climate action plan for San Francisco local actions to reduce greenhouse emissi","https://archive.org/details/p16255coll1_H1371674965007_file2/page/n135","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2003","described in","10 of the 25 LRVs needed for Mission Bay service",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n112","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2003","units","at least 1,000 units within the next five years",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : final draft fo","https://archive.org/details/C124925579/page/n89","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2003","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview05unse_8","ia:potreroview05unse_8","showcase_search"],["2003","described in","slated to accommodate 6,000 new units",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : final draft fo","https://archive.org/details/C124925579/page/n82","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2003","units","3,000 units of housing",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : final draft fo","https://archive.org/details/C124925579/page/n89","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2003","proposed","new neighborhood planned in redevelopment area, housing in a variety of unit sizes at market and affordable rates",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : final draft fo","https://archive.org/details/C124925579/page/n118","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2003","proposed","Redevelopment Plan and Design Guidelines adopted",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : final draft fo","https://archive.org/details/C124925579/page/n206","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2003","documented in","Housing element : an element of the San Francisco general plan : final draft for public review",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : final draft fo","https://archive.org/details/C124925579/page/n118","ia:C124925579","x_dl_facts"],["2003","described in","28 percent of units available to moderate, low, and very low income households (about 1,700 units)",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : final draft fo","https://archive.org/details/C124925579/page/n207","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2003","units","over 1,000 residential units under construction",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : final draft fo","https://archive.org/details/C124925579/page/n207","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2003","units","3,090 units",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : final draft fo","https://archive.org/details/C124925579/page/n89","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2003","proposed","adopted and being carried out by the San Francisco Redevelopment Agency",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : final draft fo","https://archive.org/details/C124925579/page/n89","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2003","described in","Additional N-line service not expected to be warranted until after IOS begins operation",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n110","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2003","proposed","up to 6,000 new residential units",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : final draft fo","https://archive.org/details/C124925579/page/n207","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2003","units","6,000 new units",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan : final draft fo","https://archive.org/details/C124925579/page/n99","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2004","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview04unse_7","ia:potreroview04unse_7","showcase_search"],["2004","described in","Funds Mayor's Office of Housing for housing outside redevelopment project or survey areas and outside Mission Bay",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan","https://archive.org/details/C101746510/page/n171","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2004","concerns place","Agenda",null,"area","SF Public Library scans: Agenda","https://archive.org/details/agenda2004sanf_1","ia:agenda2004sanf_1","showcase_search"],["2004","units","at least 1,000 units within the next five years",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan","https://archive.org/details/C101746510/page/n105","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2004","units","28 percent affordable, about 1,700 units at maximum build-out",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan","https://archive.org/details/C101746510/page/n233","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2004","units","6,000 new units",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan","https://archive.org/details/C101746510/page/n120","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2004","units","over 1,000 residential units under construction",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan","https://archive.org/details/C101746510/page/n233","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2004","proposed","Redevelopment Plan and Design Guidelines for Mission Bay adopted",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan","https://archive.org/details/C101746510/page/n232","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2004","described in","Plan for one of the largest undeveloped areas remaining in San Francisco",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan","https://archive.org/details/C101746510/page/n231","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2004","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview11unse_11","ia:potreroview11unse_11","showcase_search"],["2004","proposed","new neighborhood with housing in a variety of unit sizes at market and affordable rates",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan","https://archive.org/details/C101746510/page/n140","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2004","units","up to 6,000 new residential units",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan","https://archive.org/details/C101746510/page/n233","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2004","units","6,000 potential new units",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan","https://archive.org/details/C101746510/page/n95","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2004","units","6,000 new units",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan","https://archive.org/details/C101746510/page/n97","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2004","proposed","new neighborhood with housing in a variety of unit sizes, at market and affordable rates",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan","https://archive.org/details/C101746510/page/n140","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2004","units","3,090 units",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan","https://archive.org/details/C101746510/page/n105","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2004","documented in","Housing element : an element of the San Francisco general plan",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan","https://archive.org/details/C101746510/page/n171","ia:C101746510","x_dl_facts"],["2004","units","3,000 units of housing",null,"area","Democracy's Library: Housing element : an element of the San Francisco general plan","https://archive.org/details/C101746510/page/n105","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2005","concerns place","Peter Walker and Partners : defining the craft",null,"area","Books and texts: Peter Walker and Partners : defining the craft","https://archive.org/details/peterwalkerpartn0000walk","ia:peterwalkerpartn0000walk","showcase_search"],["2005","documented in","Real property owned by the city and county of San Francisco / 2005",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 2005","https://archive.org/details/igsl_san-francisco-real-prop-report_2005/page/n70","ia:igsl_san-francisco-real-prop-report_2005","x_dl_facts"],["2005","described in","Site of new Mission Bay Fire Station",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 2005","https://archive.org/details/igsl_san-francisco-real-prop-report_2005/page/n70","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2005","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview05unse_10","ia:potreroview05unse_10","showcase_search"],["2006","concerns place","Visitacion Valley Grapevine",null,"area","Books and texts: Visitacion Valley Grapevine","https://archive.org/details/visitacionvalley239unse","ia:visitacionvalley239unse","showcase_search"],["2006","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview02unse_11","ia:potreroview02unse_11","showcase_search"],["2006","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview2006unse_4","ia:potreroview2006unse_4","showcase_search"],["2006","documented in","Real property owned by the city and county of San Francisco / 2006",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 2006","https://archive.org/details/igsl_san-francisco-real-prop-report_2006/page/n1","ia:igsl_san-francisco-real-prop-report_2006","x_dl_facts"],["2006","described in","City's latest library, cover photo",null,"area","Democracy's Library: Real property owned by the city and county of San Francisco / 2006","https://archive.org/details/igsl_san-francisco-real-prop-report_2006/page/n1","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2006","depicted in","http://www.missionbayparks.com:80/ as captured 2006-09-07",null,"area","Wayback Machine: http://www.missionbayparks.com:80/ as captured 2006-09-07","https://web.archive.org/web/20060907030554/http://www.missionbayparks.com:80/","qipu:sf/place/fill/mission-bay","showcase_search"],["2007","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview2007unse","ia:potreroview2007unse","showcase_search"],["2007","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview2007unse_5","ia:potreroview2007unse_5","showcase_search"],["2007","recorded at","Land Grabs",null,"area","Audio: Land Grabs","https://archive.org/details/land-grabs-1","qipu:sf/place/fill/mission-bay","showcase_search"],["2007","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview2007unse_10","ia:potreroview2007unse_10","showcase_search"],["2007","depicted in","http://missionbayparks.com:80/ as captured 2007-02-24",null,"area","Wayback Machine: http://missionbayparks.com:80/ as captured 2007-02-24","https://web.archive.org/web/20070224021538/http://missionbayparks.com:80/","qipu:sf/place/fill/mission-bay","showcase_search"],["2007","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview2007unse_7","ia:potreroview2007unse_7","showcase_search"],["2007","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview2007unse_9","ia:potreroview2007unse_9","showcase_search"],["2008","described in","$6.9 million (≈ $10.8 million in 2026 dollars) operating cost increase, 40 additional buses",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n445","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2008","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview2008unse_3","ia:potreroview2008unse_3","showcase_search"],["2008","described in","$4.7 million (≈ $7.4 million in 2026 dollars) operating cost",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n456","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2008","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview2008unse","ia:potreroview2008unse","showcase_search"],["2008","depicted in","http://www.missionbayparks.com:80/ as captured 2008-02-23",null,"area","Wayback Machine: http://www.missionbayparks.com:80/ as captured 2008-02-23","https://web.archive.org/web/20080223234852/http://www.missionbayparks.com:80/","qipu:sf/place/fill/mission-bay","showcase_search"],["2008","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview2008unse_6","ia:potreroview2008unse_6","showcase_search"],["2009","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview2009unse_10","ia:potreroview2009unse_10","showcase_search"],["2009","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview2009unse_9","ia:potreroview2009unse_9","showcase_search"],["2009","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview2009unse_3","ia:potreroview2009unse_3","showcase_search"],["2009","depicted in","http://www.missionbayparks.com:80/ as captured 2009-03-02",null,"area","Wayback Machine: http://www.missionbayparks.com:80/ as captured 2009-03-02","https://web.archive.org/web/20090302152333/http://www.missionbayparks.com:80/","qipu:sf/place/fill/mission-bay","showcase_search"],["2009","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview2009unse_4","ia:potreroview2009unse_4","showcase_search"],["2009","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview2009unse_2","ia:potreroview2009unse_2","showcase_search"],["2009","concerns place","The Potrero View",null,"area","Books and texts: The Potrero View","https://archive.org/details/potreroview2009unse_7","ia:potreroview2009unse_7","showcase_search"],["2010","described in","PM10 205.8 lb/day, 258% of the 80 lb/day BAAQMD threshold (vehicular emissions, year 2010)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n405","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2010","described in","Traffic associated with Major New Site treated as increment to MTC Model year 2010 projections",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n89","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2010","described in","significant impact: v/c ratio deterioration on US 101 and I-280 corridors at LOS F",null,"segment","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922948/page/n58","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2010","described in","US 101 and I-280 freeway segments at LOS F in 2010 without the Major New Site; significant unavoidable traffic impact with the Major New Site",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n555","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2010","described in","model assumes three to four lanes per direction in year 2010",null,"segment","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n377","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2010","described in","year 2010 traffic assessed with and without the Major New Site",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n376","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2010","described in","Table A-3-17 Mission Bay corridor level of service, year 2010 without project (AM and PM peak-hour conditions for corridors such as US 101, Third Street and Fourth Street)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n715","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2010","described in","MTC Model used to project traffic to the year 2010",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n88","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2010","described in","MTC growth projections used to model 2010 traffic in Mission Bay area",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n71","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2010","described in","MTC 2010 model includes only a portion of total housing and employment projected at buildout",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n340","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2010","described in","NOx 97.8 lb/day, 123% of the 80 lb/day BAAQMD threshold (vehicular emissions, year 2010)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n405","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2010","described in","ROG 67.3 lb/day, 84% of the 80 lb/day BAAQMD threshold (vehicular emissions, year 2010)",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n405","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2010","depicted in","http://www.missionbayparks.com:80/ as captured 2010-01-13",null,"area","Wayback Machine: http://www.missionbayparks.com:80/ as captured 2010-01-13","https://web.archive.org/web/20100113012920/http://www.missionbayparks.com:80/","qipu:sf/place/fill/mission-bay","showcase_search"],["2011","depicted in","http://www.missionbayparks.com:80/ as captured 2011-03-22",null,"area","Wayback Machine: http://www.missionbayparks.com:80/ as captured 2011-03-22","https://web.archive.org/web/20110322035538/http://www.missionbayparks.com:80/","qipu:sf/place/fill/mission-bay","showcase_search"],["2012","concerns place","Class San Francisco",null,"area","Open Library: Class San Francisco","https://openlibrary.org/works/OL28020720W","web:openlibrary.org/works/OL28020720W","showcase_search"],["2012","depicted in","http://missionbayparks.com/ as captured 2012-01-31",null,"area","Wayback Machine: http://missionbayparks.com/ as captured 2012-01-31","https://web.archive.org/web/20120131214154/http://missionbayparks.com/","qipu:sf/place/fill/mission-bay","showcase_search"],["2012","recorded at","Club M-One Six 2012-07-26 Lewis Baden & Friends",null,"area","Audio: Club M-One Six 2012-07-26 Lewis Baden & Friends","https://archive.org/details/CM-OSix2012-07-26","qipu:sf/place/fill/mission-bay","showcase_search"],["2012","recorded at","Club M-One Six 2012-07-19 Lewis Baden & Friends",null,"area","Audio: Club M-One Six 2012-07-19 Lewis Baden & Friends","https://archive.org/details/CM-OSix2012-07-19","qipu:sf/place/fill/mission-bay","showcase_search"],["2012","recorded at","Club M-One Six 2012-09-13 Lewis Baden & Friends",null,"area","Audio: Club M-One Six 2012-09-13 Lewis Baden & Friends","https://archive.org/details/CM-OSix2012-09-13","qipu:sf/place/fill/mission-bay","showcase_search"],["2013","depicted in","http://missionbayparks.com/ as captured 2013-06-14",null,"area","Wayback Machine: http://missionbayparks.com/ as captured 2013-06-14","https://web.archive.org/web/20130614012011/http://missionbayparks.com/","qipu:sf/place/fill/mission-bay","showcase_search"],["2013","concerns place","Draft environmental assessment for Mission Bay Transit Loop Project",null,"area","SF Public Library scans: Draft environmental assessment for Mission Bay Transit Loop Project","https://archive.org/details/draftenvironment6201unit","ia:draftenvironment6201unit","showcase_search"],["2014","depicted in","http://missionbayparks.com/ as captured 2014-01-03",null,"area","Wayback Machine: http://missionbayparks.com/ as captured 2014-01-03","https://web.archive.org/web/20140103105246/http://missionbayparks.com/","qipu:sf/place/fill/mission-bay","showcase_search"],["2014","recorded at","The Evolving Eastern Shoreline",null,"area","Audio: The Evolving Eastern Shoreline","https://archive.org/details/EasternShorelineSept10201401","qipu:sf/place/fill/mission-bay","showcase_search"],["2015","described in","Corridor daily ridership decreases to about 2,000 trips",null,"segment","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n185","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2015","described in","Proposed redevelopment; traffic growth and truck proportion considered in cumulative analysis",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n201","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2015","depicted in","http://missionbayparks.com:80/ as captured 2015-01-19",null,"area","Wayback Machine: http://missionbayparks.com:80/ as captured 2015-01-19","https://web.archive.org/web/20150119070828/http://missionbayparks.com:80/","qipu:sf/place/fill/mission-bay","showcase_search"],["2015","described in","Third Street Light Rail does not assume buildout of Mission Bay by 2015, while the Mission Bay EIR does",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n512","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2015","described in","Total trips would increase by over 600 percent by 2015 given the present development scenario",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n64","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2015","depicted in","http://sfocii.org/mission-bay as captured 2015-11-05",null,"area","Wayback Machine: http://sfocii.org/mission-bay as captured 2015-11-05","https://web.archive.org/web/20151105185908/http://sfocii.org/mission-bay","qipu:sf/place/fill/mission-bay","showcase_search"],["2015","depicted in","http://sfocii.org/mission-bay-south-owner-participation-agreement as captured 2015-11-05",null,"area","Wayback Machine: http://sfocii.org/mission-bay-south-owner-participation-agreement as captured 2015-","https://web.archive.org/web/20151105194645/http://sfocii.org/mission-bay-south-owner-participation-agreement","qipu:sf/place/fill/mission-bay","showcase_search"],["2015","recorded at","Nurses protest site of new Warriors arena",null,"area","Audio: Nurses protest site of new Warriors arena","https://archive.org/details/A63_20150630145150380","qipu:sf/place/fill/mission-bay","showcase_search"],["2015","depicted in","http://sfocii.org/mission-bay-north-owner-participation-agreement as captured 2015-11-05",null,"area","Wayback Machine: http://sfocii.org/mission-bay-north-owner-participation-agreement as captured 2015-","https://web.archive.org/web/20151105194621/http://sfocii.org/mission-bay-north-owner-participation-agreement","qipu:sf/place/fill/mission-bay","showcase_search"],["2015","described in","Mission Bay trips represent about 31 percent of new trips",null,"area","Democracy's Library: Draft environmental impact statement/draft environmental impact report for the ","https://archive.org/details/C124915258/page/n181","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2015","depicted in","http://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreements as captured 2015-11-05",null,"area","Wayback Machine: http://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreement","https://web.archive.org/web/20151105194715/http://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreements","qipu:sf/place/fill/mission-bay","showcase_search"],["2016","depicted in","http://sfocii.org/mission-bay as captured 2016-01-05",null,"area","Wayback Machine: http://sfocii.org/mission-bay as captured 2016-01-05","https://web.archive.org/web/20160105183954/http://sfocii.org/mission-bay","qipu:sf/place/fill/mission-bay","showcase_search"],["2016","depicted in","http://sfocii.org/mission-bay-north-owner-participation-agreement as captured 2016-01-05",null,"area","Wayback Machine: http://sfocii.org/mission-bay-north-owner-participation-agreement as captured 2016-","https://web.archive.org/web/20160105193533/http://sfocii.org/mission-bay-north-owner-participation-agreement","qipu:sf/place/fill/mission-bay","showcase_search"],["2016","depicted in","http://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreements as captured 2016-01-05",null,"area","Wayback Machine: http://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreement","https://web.archive.org/web/20160105192850/http://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreements","qipu:sf/place/fill/mission-bay","showcase_search"],["2016","depicted in","http://missionbayparks.com/ as captured 2016-01-11",null,"area","Wayback Machine: http://missionbayparks.com/ as captured 2016-01-11","https://web.archive.org/web/20160111103232/http://missionbayparks.com/","qipu:sf/place/fill/mission-bay","showcase_search"],["2017","depicted in","http://missionbayparks.com/ as captured 2017-05-19",null,"area","Wayback Machine: http://missionbayparks.com/ as captured 2017-05-19","https://web.archive.org/web/20170519172544/http://missionbayparks.com/","qipu:sf/place/fill/mission-bay","showcase_search"],["2017","depicted in","http://sfocii.org:80/mission-bay as captured 2017-04-28",null,"area","Wayback Machine: http://sfocii.org:80/mission-bay as captured 2017-04-28","https://web.archive.org/web/20170428031054/http://sfocii.org:80/mission-bay","qipu:sf/place/fill/mission-bay","showcase_search"],["2017","depicted in","http://sfocii.org:80/mission-bay-north-mission-bay-south-owner-participation-agreements as captured 2017-05-26",null,"area","Wayback Machine: http://sfocii.org:80/mission-bay-north-mission-bay-south-owner-participation-agreem","https://web.archive.org/web/20170526020426/http://sfocii.org:80/mission-bay-north-mission-bay-south-owner-participation-agreements","qipu:sf/place/fill/mission-bay","showcase_search"],["2017","depicted in","http://sfocii.org:80/mission-bay-north-owner-participation-agreement as captured 2017-01-16",null,"area","Wayback Machine: http://sfocii.org:80/mission-bay-north-owner-participation-agreement as captured 20","https://web.archive.org/web/20170116203101/http://sfocii.org:80/mission-bay-north-owner-participation-agreement","qipu:sf/place/fill/mission-bay","showcase_search"],["2018","depicted in","http://sfocii.org/mission-bay as captured 2018-01-02",null,"area","Wayback Machine: http://sfocii.org/mission-bay as captured 2018-01-02","https://web.archive.org/web/20180102021914/http://sfocii.org/mission-bay","qipu:sf/place/fill/mission-bay","showcase_search"],["2018","depicted in","http://sfocii.org/mission-bay-north-owner-participation-agreement as captured 2018-01-02",null,"area","Wayback Machine: http://sfocii.org/mission-bay-north-owner-participation-agreement as captured 2018-","https://web.archive.org/web/20180102030757/http://sfocii.org/mission-bay-north-owner-participation-agreement","qipu:sf/place/fill/mission-bay","showcase_search"],["2018","recorded at","University of California Regents: 11-15-2018",null,"area","Audio: University of California Regents: 11-15-2018","https://archive.org/details/3Board111518edit","qipu:sf/place/fill/mission-bay","showcase_search"],["2018","depicted in","http://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreements as captured 2018-01-02",null,"area","Wayback Machine: http://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreement","https://web.archive.org/web/20180102025744/http://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreements","qipu:sf/place/fill/mission-bay","showcase_search"],["2018","depicted in","http://missionbayparks.com/ as captured 2018-03-29",null,"area","Wayback Machine: http://missionbayparks.com/ as captured 2018-03-29","https://web.archive.org/web/20180329113946/http://missionbayparks.com/","qipu:sf/place/fill/mission-bay","showcase_search"],["2018","recorded at","Rubenerd Show 377: The Golden Gate episode",null,"area","Audio: Rubenerd Show 377: The Golden Gate episode","https://archive.org/details/RubenerdShow377","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","recorded at","University of California Regents Working Group on UCOP Salary Ranges: 1-17-2019",null,"area","Audio: University of California Regents Working Group on UCOP Salary Ranges: 1-17-2019","https://archive.org/details/RegentsWorkingGrpUCOPSalary11719","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","San Francisco Port Commission Meeting - July 9, 2019",null,"area","Films and video: San Francisco Port Commission Meeting - July 9, 2019","https://archive.org/details/openpublica-san_francisco-california-570f42bf-4dde-4c0f-bb7c-5d72f3e9630f","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","recorded at","University of California Regents: Morning of Jan. 16, 2019",null,"area","Audio: University of California Regents: Morning of Jan. 16, 2019","https://archive.org/details/13PublicEngagementAndDevelopment11619","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","San Francisco Port Commission Meeting - June 11, 2019",null,"area","Films and video: San Francisco Port Commission Meeting - June 11, 2019","https://archive.org/details/openpublica-san_francisco-california-0880af97-54e3-4720-a1bd-f87829312e7a","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","Government Access Programming : SFGTV : September 5, 2019 11:00pm-12:01am PDT",null,"area","TV News Archive: Government Access Programming : SFGTV : September 5, 2019 11:00pm-12:01am PDT","https://archive.org/details/SFGTV_20190906_060000_Government_Access_Programming","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","Government Access Programming : SFGTV : August 24, 2019 2:00am-3:01am PDT",null,"area","TV News Archive: Government Access Programming : SFGTV : August 24, 2019 2:00am-3:01am PDT","https://archive.org/details/SFGTV_20190824_090000_Government_Access_Programming","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","recorded at","University of California Regents - Basic Needs: July 16, 2019",null,"area","Audio: University of California Regents - Basic Needs: July 16, 2019","https://archive.org/details/regentsbasicneeds71619","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","Government Access Programming : SFGTV : August 15, 2019 8:00pm-9:01pm PDT",null,"area","TV News Archive: Government Access Programming : SFGTV : August 15, 2019 8:00pm-9:01pm PDT","https://archive.org/details/SFGTV_20190816_030000_Government_Access_Programming","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","Government Access Programming : SFGTV : August 11, 2019 11:00am-12:01pm PDT",null,"area","TV News Archive: Government Access Programming : SFGTV : August 11, 2019 11:00am-12:01pm PDT","https://archive.org/details/SFGTV_20190811_180000_Government_Access_Programming","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","recorded at","University of California Regents: Morning of July 17, 2019",null,"area","Audio: University of California Regents: Morning of July 17, 2019","https://archive.org/details/1regentspublicengagementanddevelopment71719am","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","San Diego Environmental Committee Meeting – June 13, 2019",null,"area","Films and video: San Diego Environmental Committee Meeting – June 13, 2019","https://archive.org/details/openpublica-san_diego-california-d5fc0f7b-40ee-4f18-802f-3d129143593b","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","Port Commission Meeting, September 10, 2019",null,"area","Films and video: Port Commission Meeting, September 10, 2019","https://archive.org/details/openpublica-san_francisco-california-c0469075-d998-47f4-a7b4-da67e6eb483c","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","https://sfocii.org/mission-bay as captured 2019-01-02",null,"area","Wayback Machine: https://sfocii.org/mission-bay as captured 2019-01-02","https://web.archive.org/web/20190102021718/https://sfocii.org/mission-bay","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","Government Access Programming : SFGTV : August 29, 2019 5:00am-6:01am PDT",null,"area","TV News Archive: Government Access Programming : SFGTV : August 29, 2019 5:00am-6:01am PDT","https://archive.org/details/SFGTV_20190829_120000_Government_Access_Programming","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","Government Access Programming : SFGTV : April 13, 2019 7:00pm-8:00pm PDT",null,"area","TV News Archive: Government Access Programming : SFGTV : April 13, 2019 7:00pm-8:00pm PDT","https://archive.org/details/SFGTV_20190414_020000_Government_Access_Programming","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","Government Access Programming : SFGTV : September 7, 2019 4:00am-5:01am PDT",null,"area","TV News Archive: Government Access Programming : SFGTV : September 7, 2019 4:00am-5:01am PDT","https://archive.org/details/SFGTV_20190907_110000_Government_Access_Programming","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","recorded at","University of California Regents - Morning, May 15, 2019",null,"area","Audio: University of California Regents - Morning, May 15, 2019","https://archive.org/details/0RegentsAcademicAndStudentAffairs51519am","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","recorded at","University of California Regents - Investments - May 14, 2019",null,"area","Audio: University of California Regents - Investments - May 14, 2019","https://archive.org/details/RegentsInvestments51419","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","San Francisco Port Commission Meeting - October 22, 2019",null,"area","Films and video: San Francisco Port Commission Meeting - October 22, 2019","https://archive.org/details/openpublica-san_francisco-california-b5fc1ec6-1786-4b2d-833b-dfb51cd8f0f2","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","San Francisco Port Commission Meeting - November 12, 2019",null,"area","Films and video: San Francisco Port Commission Meeting - November 12, 2019","https://archive.org/details/openpublica-san_francisco-california-2727a2b3-29ab-41e0-9715-2d3adf5323ed","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","https://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreements as captured 2019-01-02",null,"area","Wayback Machine: https://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreemen","https://web.archive.org/web/20190102030136/https://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreements","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","recorded at","University of California Regents: July 18, 2019",null,"area","Audio: University of California Regents: July 18, 2019","https://archive.org/details/4regentsboardandgovernance71819","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","Government Access Programming : SFGTV : April 19, 2019 2:00pm-3:00pm PDT",null,"area","TV News Archive: Government Access Programming : SFGTV : April 19, 2019 2:00pm-3:00pm PDT","https://archive.org/details/SFGTV_20190419_210000_Government_Access_Programming","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","Government Access Programming : SFGTV : August 17, 2019 2:00am-3:01am PDT",null,"area","TV News Archive: Government Access Programming : SFGTV : August 17, 2019 2:00am-3:01am PDT","https://archive.org/details/SFGTV_20190817_090000_Government_Access_Programming","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","recorded at","University of California Regents: Governance & Compensation: Jan. 16, 2019",null,"area","Audio: University of California Regents: Governance & Compensation: Jan. 16, 2019","https://archive.org/details/RegentsGovernComp11619","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","Government Access Programming : SFGTV : August 15, 2019 5:00am-6:01am PDT",null,"area","TV News Archive: Government Access Programming : SFGTV : August 15, 2019 5:00am-6:01am PDT","https://archive.org/details/SFGTV_20190815_120000_Government_Access_Programming","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","Port Commission Meeting - May 14, 2019",null,"area","Films and video: Port Commission Meeting - May 14, 2019","https://archive.org/details/openpublica-san_francisco-california-2a73c19a-0259-46ef-96f0-13e833820789","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","Government Access Programming : SFGTV : September 4, 2019 4:00pm-5:01pm PDT",null,"area","TV News Archive: Government Access Programming : SFGTV : September 4, 2019 4:00pm-5:01pm PDT","https://archive.org/details/SFGTV_20190904_230000_Government_Access_Programming","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","https://sfocii.org/mission-bay-north-owner-participation-agreement as captured 2019-01-02",null,"area","Wayback Machine: https://sfocii.org/mission-bay-north-owner-participation-agreement as captured 2019","https://web.archive.org/web/20190102031643/https://sfocii.org/mission-bay-north-owner-participation-agreement","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","recorded at","University of California Regents: Afternoon of July 17, 2019",null,"area","Audio: University of California Regents: Afternoon of July 17, 2019","https://archive.org/details/3regentsfinanceandcapitalstrategies71719","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","recorded at","University of California Regents: Afternoon of Jan. 16, 2019",null,"area","Audio: University of California Regents: Afternoon of Jan. 16, 2019","https://archive.org/details/1AcademicAndStudentAffairsNationalLabs","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","https://missionbayparks.com/ as captured 2019-07-19",null,"area","Wayback Machine: https://missionbayparks.com/ as captured 2019-07-19","https://web.archive.org/web/20190719080513/https://missionbayparks.com/","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","concerns place","Classic San Francisco",null,"area","Open Library: Classic San Francisco","https://openlibrary.org/works/OL21866898W","web:openlibrary.org/works/OL21866898W","showcase_search"],["2019","depicted in","Government Access Programming : SFGTV : August 22, 2019 5:00am-6:01am PDT",null,"area","TV News Archive: Government Access Programming : SFGTV : August 22, 2019 5:00am-6:01am PDT","https://archive.org/details/SFGTV_20190822_120000_Government_Access_Programming","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","recorded at","University of California Regents: Nov. 12, 2019 - Basic Needs",null,"area","Audio: University of California Regents: Nov. 12, 2019 - Basic Needs","https://archive.org/details/specialcommitteeonbasicneeds","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","Government Access Programming : SFGTV : August 10, 2019 2:00am-3:01am PDT",null,"area","TV News Archive: Government Access Programming : SFGTV : August 10, 2019 2:00am-3:01am PDT","https://archive.org/details/SFGTV_20190810_090000_Government_Access_Programming","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","Government Access Programming : SFGTV : August 16, 2019 12:00am-1:01am PDT",null,"area","TV News Archive: Government Access Programming : SFGTV : August 16, 2019 12:00am-1:01am PDT","https://archive.org/details/SFGTV_20190816_070000_Government_Access_Programming","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","depicted in","Government Access Programming : SFGTV : September 8, 2019 3:00am-4:01am PDT",null,"area","TV News Archive: Government Access Programming : SFGTV : September 8, 2019 3:00am-4:01am PDT","https://archive.org/details/SFGTV_20190908_100000_Government_Access_Programming","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","recorded at","University of California Regents - Health Services: 12-10-2019",null,"area","Audio: University of California Regents - Health Services: 12-10-2019","https://archive.org/details/regentshealth12102019","qipu:sf/place/fill/mission-bay","showcase_search"],["2019","recorded at","University of California Regents - Afternoon of May 15, 2019",null,"area","Audio: University of California Regents - Afternoon of May 15, 2019","https://archive.org/details/1RegentsComplianceAndAudit51519pm","qipu:sf/place/fill/mission-bay","showcase_search"],["2020","depicted in","https://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreements as captured 2020-08-14",null,"area","Wayback Machine: https://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreemen","https://web.archive.org/web/20200814010504/https://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreements","qipu:sf/place/fill/mission-bay","showcase_search"],["2020","depicted in","Hidden San Francisco Stop T 1 Mission Plank Road",null,"area","Films and video: Hidden San Francisco Stop T 1 Mission Plank Road","https://archive.org/details/hidden-san-francisco-stop-t-1-mission-plank-road","qipu:sf/place/fill/mission-bay","showcase_search"],["2020","depicted in","San Francisco Port Commission Meeting Summary: March 10, 2020",null,"area","Films and video: San Francisco Port Commission Meeting Summary: March 10, 2020","https://archive.org/details/openpublica-san_francisco-california-1a24cbb2-c754-4a7d-854a-13431b1eb2a4","qipu:sf/place/fill/mission-bay","showcase_search"],["2020","depicted in","King Tide Sea Level Rise Virtual Walking Tour",null,"area","Films and video: King Tide Sea Level Rise Virtual Walking Tour","https://archive.org/details/king-tide-sea-level-rise-virtual-walking-tour","qipu:sf/place/fill/mission-bay","showcase_search"],["2020","depicted in","https://missionbayparks.com/ as captured 2020-02-25",null,"area","Wayback Machine: https://missionbayparks.com/ as captured 2020-02-25","https://web.archive.org/web/20200225041550/https://missionbayparks.com/","qipu:sf/place/fill/mission-bay","showcase_search"],["2020","depicted in","Port Commission Meeting - February 12, 2020",null,"area","Films and video: Port Commission Meeting - February 12, 2020","https://archive.org/details/openpublica-san_francisco-california-83f5b914-6c4c-418f-8860-a5e2a008e37c","qipu:sf/place/fill/mission-bay","showcase_search"],["2020","recorded at","University of California Regents, Morning: Jan. 22, 2020",null,"area","Audio: University of California Regents, Morning: Jan. 22, 2020","https://archive.org/details/3board12220","qipu:sf/place/fill/mission-bay","showcase_search"],["2020","depicted in","Port of San Francisco Commission Meeting - June 9, 2020: Budget, Rent Deferral, and Vision Zero Updates",null,"area","Films and video: Port of San Francisco Commission Meeting - June 9, 2020: Budget, Rent Deferral, and","https://archive.org/details/openpublica-san_francisco-california-5b484b82-2cef-4a1e-a7f3-23a37d588057","qipu:sf/place/fill/mission-bay","showcase_search"],["2020","described in","net balance reaching $13.9 million (≈ $18.1 million in 2026 dollars) by project completion in 2020",null,"area","Democracy's Library: Fiscal and financial evaluation of the Mission Bay Project","https://archive.org/details/C124903391/page/n22","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2020","recorded at","University of California Regents: 5-19-2020",null,"area","Audio: University of California Regents: 5-19-2020","https://archive.org/details/regents-finance-and-capital-strategies-committee-5-19-20","qipu:sf/place/fill/mission-bay","showcase_search"],["2020","depicted in","Hidden San Francisco Stop E 4 Laguna Dolores",null,"area","Films and video: Hidden San Francisco Stop E 4 Laguna Dolores","https://archive.org/details/hidden-san-francisco-stop-e-4-laguna-dolores","qipu:sf/place/fill/mission-bay","showcase_search"],["2020","depicted in","https://sfocii.org/mission-bay as captured 2020-01-01",null,"area","Wayback Machine: https://sfocii.org/mission-bay as captured 2020-01-01","https://web.archive.org/web/20200101083404/https://sfocii.org/mission-bay","qipu:sf/place/fill/mission-bay","showcase_search"],["2020","depicted in","https://sfocii.org/mission-bay-north-owner-participation-agreement as captured 2020-09-21",null,"area","Wayback Machine: https://sfocii.org/mission-bay-north-owner-participation-agreement as captured 2020","https://web.archive.org/web/20200921100754/https://sfocii.org/mission-bay-north-owner-participation-agreement","qipu:sf/place/fill/mission-bay","showcase_search"],["2020","depicted in","San Francisco Port Commission Meeting – August 11, 2020",null,"area","Films and video: San Francisco Port Commission Meeting – August 11, 2020","https://archive.org/details/openpublica-san_francisco-california-7cd92fd8-2bce-4600-a375-d46cd30abd1c","qipu:sf/place/fill/mission-bay","showcase_search"],["2020","recorded at","University of California Regents: Afternoon - Jan. 22, 2020",null,"area","Audio: University of California Regents: Afternoon - Jan. 22, 2020","https://archive.org/details/4academicandstudentaffairs","qipu:sf/place/fill/mission-bay","showcase_search"],["2020","described in","long-term buildout of the entire Mission Bay plan area by the year 2020",null,"area","Democracy's Library: Draft EIR : long range development plan, University of California, San Francisc","https://archive.org/details/C124922850/page/n71","qipu:sf/place/fill/mission-bay","x_dl_facts"],["2020","depicted in","Port Commission Meeting - April 28, 2020",null,"area","Films and video: Port Commission Meeting - April 28, 2020","https://archive.org/details/openpublica-san_francisco-california-a8af8364-b72c-4784-8695-30d6dae7f563","qipu:sf/place/fill/mission-bay","showcase_search"],["2020","depicted in","San Francisco Port Commission Meeting Summary - January 14, 2020",null,"area","Films and video: San Francisco Port Commission Meeting Summary - January 14, 2020","https://archive.org/details/openpublica-san_francisco-california-c7973ece-3f79-4679-af71-e1a7e23c3d5a","qipu:sf/place/fill/mission-bay","showcase_search"],["2021","depicted in","CCII (Commission on Community Investment and Infrastructure) : SFGTV : April 10, 2021 12:00am-2:16am PDT",null,"area","TV News Archive: CCII (Commission on Community Investment and Infrastructure) : SFGTV : April 10, 20","https://archive.org/details/SFGTV_20210410_070000_CCII_Commission_on_Community_Investment_and_Infrastructure","qipu:sf/place/fill/mission-bay","showcase_search"],["2021","depicted in","BOS Budget and Appropriations Committee : SFGTV : June 14, 2021 10:00am-2:00pm PDT",null,"area","TV News Archive: BOS Budget and Appropriations Committee : SFGTV : June 14, 2021 10:00am-2:00pm PDT","https://archive.org/details/SFGTV_20210614_170000_BOS_Budget_and_Appropriations_Committee","qipu:sf/place/fill/mission-bay","showcase_search"],["2021","depicted in","BOS Land Use Committee : SFGTV : January 18, 2021 5:10am-9:01am PST",null,"area","TV News Archive: BOS Land Use Committee : SFGTV : January 18, 2021 5:10am-9:01am PST","https://archive.org/details/SFGTV_20210118_131000_BOS_Land_Use_Committee","qipu:sf/place/fill/mission-bay","showcase_search"],["2021","depicted in","Dogpatch Walk And Talk June 26 2021",null,"area","Films and video: Dogpatch Walk And Talk June 26 2021","https://archive.org/details/dogpatch-walk-and-talk-june-26-2021","qipu:sf/place/fill/mission-bay","showcase_search"],["2021","concerns place","2022 Muni Service Network Documents",null,"area","Books and texts: 2022 Muni Service Network Documents","https://archive.org/details/1-2022-muni-service-network-storymap-print-survey-opt-contrast-0","ia:1-2022-muni-service-network-storymap-print-survey-opt-contrast-0","showcase_search"],["2021","depicted in","https://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreements as captured 2021-04-22",null,"area","Wayback Machine: https://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreemen","https://web.archive.org/web/20210422135814/https://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreements","qipu:sf/place/fill/mission-bay","showcase_search"],["2021","depicted in","BOS Land Use Committee : SFGTV : January 18, 2021 1:10am-5:11am PST",null,"area","TV News Archive: BOS Land Use Committee : SFGTV : January 18, 2021 1:10am-5:11am PST","https://archive.org/details/SFGTV_20210118_091000_BOS_Land_Use_Committee","qipu:sf/place/fill/mission-bay","showcase_search"],["2021","depicted in","https://missionbayparks.com/ as captured 2021-01-19",null,"area","Wayback Machine: https://missionbayparks.com/ as captured 2021-01-19","https://web.archive.org/web/20210119210822/https://missionbayparks.com/","qipu:sf/place/fill/mission-bay","showcase_search"],["2021","depicted in","KTVU FOX 2 News at 5 : KTVU : April 23, 2021 5:00pm-5:59pm PDT",null,"area","TV News Archive: KTVU FOX 2 News at 5 : KTVU : April 23, 2021 5:00pm-5:59pm PDT","https://archive.org/details/KTVU_20210424_000000_KTVU_FOX_2_News_at_5","qipu:sf/place/fill/mission-bay","showcase_search"],["2021","depicted in","Commission on Community Investment and Infrastructure : SFGTV : July 24, 2021 2:30pm-3:36pm PDT",null,"area","TV News Archive: Commission on Community Investment and Infrastructure : SFGTV : July 24, 2021 2:30p","https://archive.org/details/SFGTV_20210724_213000_Commission_on_Community_Investment_and_Infrastructure","qipu:sf/place/fill/mission-bay","showcase_search"],["2021","depicted in","Commission on Community Investment and Infrastructure : SFGTV : July 23, 2021 6:00am-8:01am PDT",null,"area","TV News Archive: Commission on Community Investment and Infrastructure : SFGTV : July 23, 2021 6:00a","https://archive.org/details/SFGTV_20210723_130000_Commission_on_Community_Investment_and_Infrastructure","qipu:sf/place/fill/mission-bay","showcase_search"],["2021","depicted in","San Francisco Port Commission Meeting – November 9, 2021",null,"area","Films and video: San Francisco Port Commission Meeting – November 9, 2021","https://archive.org/details/openpublica-san_francisco-california-1654bc91-0f74-43f6-b390-d2e9eee3b499","qipu:sf/place/fill/mission-bay","showcase_search"],["2021","depicted in","https://sfocii.org/mission-bay-north-owner-participation-agreement as captured 2021-04-22",null,"area","Wayback Machine: https://sfocii.org/mission-bay-north-owner-participation-agreement as captured 2021","https://web.archive.org/web/20210422144904/https://sfocii.org/mission-bay-north-owner-participation-agreement","qipu:sf/place/fill/mission-bay","showcase_search"],["2021","depicted in","https://sfocii.org/mission-bay as captured 2021-01-18",null,"area","Wayback Machine: https://sfocii.org/mission-bay as captured 2021-01-18","https://web.archive.org/web/20210118171918/https://sfocii.org/mission-bay","qipu:sf/place/fill/mission-bay","showcase_search"],["2021","depicted in","San Francisco Port Commission Meeting – August 10, 2021",null,"area","Films and video: San Francisco Port Commission Meeting – August 10, 2021","https://archive.org/details/openpublica-san_francisco-california-e1a4e51c-1609-4b25-8d4c-564ef28241d1","qipu:sf/place/fill/mission-bay","showcase_search"],["2021","depicted in","BOS Budget and Appropriations Committee : SFGTV : June 19, 2021 2:00am-6:01am PDT",null,"area","TV News Archive: BOS Budget and Appropriations Committee : SFGTV : June 19, 2021 2:00am-6:01am PDT","https://archive.org/details/SFGTV_20210619_090000_BOS_Budget_and_Appropriations_Committee","qipu:sf/place/fill/mission-bay","showcase_search"],["2022","depicted in","San Francisco Budget and Appropriations Committee Meeting - June 15, 2022",null,"area","Films and video: San Francisco Budget and Appropriations Committee Meeting - June 15, 2022","https://archive.org/details/openpublica-san_francisco-california-749e5e0b-25cb-4abe-b2fb-5ecade230a3b","qipu:sf/place/fill/mission-bay","showcase_search"],["2022","depicted in","https://sfocii.org/mission-bay-north-owner-participation-agreement as captured 2022-05-21",null,"area","Wayback Machine: https://sfocii.org/mission-bay-north-owner-participation-agreement as captured 2022","https://web.archive.org/web/20220521002113/https://sfocii.org/mission-bay-north-owner-participation-agreement","qipu:sf/place/fill/mission-bay","showcase_search"],["2022","depicted in","https://sfocii.org/mission-bay as captured 2022-01-19",null,"area","Wayback Machine: https://sfocii.org/mission-bay as captured 2022-01-19","https://web.archive.org/web/20220119041031/https://sfocii.org/mission-bay","qipu:sf/place/fill/mission-bay","showcase_search"],["2022","recorded at","Episode 166| Dr. Steve Hetts Describes How to Create Better Outcomes After Stroke",null,"area","Audio: Episode 166| Dr. Steve Hetts Describes How to Create Better Outcomes After Stroke","https://archive.org/details/tbfxrujd1inamshp3qdpxgzjdesrwqudtk5i1yrr","qipu:sf/place/fill/mission-bay","showcase_search"],["2022","depicted in","https://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreements as captured 2022-07-01",null,"area","Wayback Machine: https://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreemen","https://web.archive.org/web/20220701044100/https://sfocii.org/mission-bay-north-mission-bay-south-owner-participation-agreements","qipu:sf/place/fill/mission-bay","showcase_search"],["2022","depicted in","https://missionbayparks.com/ as captured 2022-01-20",null,"area","Wayback Machine: https://missionbayparks.com/ as captured 2022-01-20","https://web.archive.org/web/20220120065859/https://missionbayparks.com/","qipu:sf/place/fill/mission-bay","showcase_search"],["2022","depicted in","Planning Commission : SFGTV : March 15, 2022 12:00am-4:36am PDT",null,"area","TV News Archive: Planning Commission : SFGTV : March 15, 2022 12:00am-4:36am PDT","https://archive.org/details/SFGTV_20220315_070000_Planning_Commission","qipu:sf/place/fill/mission-bay","showcase_search"],["2022","depicted in","Redistricting Task Force : SFGTV : March 12, 2022 12:00pm-3:10pm PST",null,"area","TV News Archive: Redistricting Task Force : SFGTV : March 12, 2022 12:00pm-3:10pm PST","https://archive.org/details/SFGTV_20220312_200000_Redistricting_Task_Force","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","https://sfocii.org/mission-bay-cac-agendas as captured 2023-02-05",null,"area","Wayback Machine: https://sfocii.org/mission-bay-cac-agendas as captured 2023-02-05","https://web.archive.org/web/20230205212832/https://sfocii.org/mission-bay-cac-agendas","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Mayor's Press Availability : SFGTV : February 22, 2023 7:00pm-7:31pm PST",null,"area","TV News Archive: Mayor's Press Availability : SFGTV : February 22, 2023 7:00pm-7:31pm PST","https://archive.org/details/SFGTV_20230223_030000_Mayors_Press_Availability","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Mayor's Press Availability : SFGTV : February 19, 2023 11:30pm-12:01am PST",null,"area","TV News Archive: Mayor's Press Availability : SFGTV : February 19, 2023 11:30pm-12:01am PST","https://archive.org/details/SFGTV_20230220_073000_Mayors_Press_Availability","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","San Francisco Port Commission Regular Meeting - August 8, 2023",null,"area","Films and video: San Francisco Port Commission Regular Meeting - August 8, 2023","https://archive.org/details/openpublica-san_francisco-california-47253486-87a3-4851-bfb1-cfdec80e6f22","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Mayor's Press Availability : SFGTV : March 8, 2023 9:30pm-10:01pm PST",null,"area","TV News Archive: Mayor's Press Availability : SFGTV : March 8, 2023 9:30pm-10:01pm PST","https://archive.org/details/SFGTV_20230309_053000_Mayors_Press_Availability","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Treasure Island Development Authority : SFGTV : March 14, 2023 5:00am-8:16am PDT",null,"area","TV News Archive: Treasure Island Development Authority : SFGTV : March 14, 2023 5:00am-8:16am PDT","https://archive.org/details/SFGTV_20230314_120000_Treasure_Island_Development_Authority","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Mayor's Press Availability : SFGTV : March 3, 2023 3:30pm-4:01pm PST",null,"area","TV News Archive: Mayor's Press Availability : SFGTV : March 3, 2023 3:30pm-4:01pm PST","https://archive.org/details/SFGTV_20230303_233000_Mayors_Press_Availability","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","BOS Budget and Appropriations Committee : SFGTV : June 19, 2023 4:30am-8:31am PDT",null,"area","TV News Archive: BOS Budget and Appropriations Committee : SFGTV : June 19, 2023 4:30am-8:31am PDT","https://archive.org/details/SFGTV_20230619_113000_BOS_Budget_and_Appropriations_Committee","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","San Francisco Port Commission Meeting - February 28, 2023",null,"area","Films and video: San Francisco Port Commission Meeting - February 28, 2023","https://archive.org/details/openpublica-san_francisco-california-f9537f26-ad85-4f75-8308-eed632c828c6","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Commission on Community Investment and Infrastructure : SFGTV : September 12, 2023 12:30pm-2:01pm PDT",null,"area","TV News Archive: Commission on Community Investment and Infrastructure : SFGTV : September 12, 2023 ","https://archive.org/details/SFGTV_20230912_193000_Commission_on_Community_Investment_and_Infrastructure","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","San Francisco Budget and Appropriations Committee Special Meeting - June 9, 2023",null,"area","Films and video: San Francisco Budget and Appropriations Committee Special Meeting - June 9, 2023","https://archive.org/details/openpublica-san_francisco-california-c8ad663e-dcca-4a5f-abf0-fce7f11719cf","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Mayor's Press Availability : SFGTV : February 20, 2023 6:30am-7:01am PST",null,"area","TV News Archive: Mayor's Press Availability : SFGTV : February 20, 2023 6:30am-7:01am PST","https://archive.org/details/SFGTV_20230220_143000_Mayors_Press_Availability","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Commission on Community Investment & Infrastructure : SFGTV : August 25, 2023 10:30pm-12:01am PDT",null,"area","TV News Archive: Commission on Community Investment & Infrastructure : SFGTV : August 25, 2023 10:30","https://archive.org/details/SFGTV_20230826_053000_Commission_on_Community_Investment__Infrastructure","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Mayor's Press Availability : SFGTV : March 5, 2023 11:00am-12:01pm PST",null,"area","TV News Archive: Mayor's Press Availability : SFGTV : March 5, 2023 11:00am-12:01pm PST","https://archive.org/details/SFGTV_20230305_190000_Mayors_Press_Availability","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","San Francisco Port Commission Meeting - December 12, 2023",null,"area","Films and video: San Francisco Port Commission Meeting - December 12, 2023","https://archive.org/details/openpublica-san_francisco-california-fb1f7490-2727-4e3c-b1a6-8240d08c3379","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","KRON 4 News at 6am : KRON : September 26, 2023 6:00am-7:00am PDT",null,"area","TV News Archive: KRON 4 News at 6am : KRON : September 26, 2023 6:00am-7:00am PDT","https://archive.org/details/KRON_20230926_130000_KRON_4_News_at_6am","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","San Francisco Budget and Finance Committee Meeting - November 29, 2023",null,"area","Films and video: San Francisco Budget and Finance Committee Meeting - November 29, 2023","https://archive.org/details/openpublica-san_francisco-california-dd6fd2cc-d336-472a-ba62-78411877b734","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","KTVU FOX 2 News at 4pm : KTVU : March 23, 2023 4:00pm-5:00pm PDT",null,"area","TV News Archive: KTVU FOX 2 News at 4pm : KTVU : March 23, 2023 4:00pm-5:00pm PDT","https://archive.org/details/KTVU_20230323_230000_KTVU_FOX_2_News_at_4pm","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Mayor's Press Availability : SFGTV : February 19, 2023 11:00am-12:01pm PST",null,"area","TV News Archive: Mayor's Press Availability : SFGTV : February 19, 2023 11:00am-12:01pm PST","https://archive.org/details/SFGTV_20230219_190000_Mayors_Press_Availability","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Commission on Community Investment and Infrastructure : SFGTV : September 9, 2023 10:30pm-12:01am PDT",null,"area","TV News Archive: Commission on Community Investment and Infrastructure : SFGTV : September 9, 2023 1","https://archive.org/details/SFGTV_20230910_053000_Commission_on_Community_Investment_and_Infrastructure","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Port Commission : SFGTV : December 17, 2023 7:30pm-10:01pm PST",null,"area","TV News Archive: Port Commission : SFGTV : December 17, 2023 7:30pm-10:01pm PST","https://archive.org/details/SFGTV_20231218_033000_Port_Commission","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Commission on Community Investment & Infrastructure : SFGTV : August 19, 2023 10:30pm-12:01am PDT",null,"area","TV News Archive: Commission on Community Investment & Infrastructure : SFGTV : August 19, 2023 10:30","https://archive.org/details/SFGTV_20230820_053000_Commission_on_Community_Investment__Infrastructure","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","CCII (Commission on Community Investment and Infrastructure) : SFGTV : August 15, 2023 1:00pm-2:31pm PDT",null,"area","TV News Archive: CCII (Commission on Community Investment and Infrastructure) : SFGTV : August 15, 2","https://archive.org/details/SFGTV_20230815_200000_CCII_Commission_on_Community_Investment_and_Infrastructure","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Commission on Community Investment & Infrastructure : SFGTV : September 2, 2023 1:00am-2:31am PDT",null,"area","TV News Archive: Commission on Community Investment & Infrastructure : SFGTV : September 2, 2023 1:0","https://archive.org/details/SFGTV_20230902_080000_Commission_on_Community_Investment__Infrastructure","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","San Francisco Port Commission Meeting - July 11, 2023",null,"area","Films and video: San Francisco Port Commission Meeting - July 11, 2023","https://archive.org/details/openpublica-san_francisco-california-b6f2ec79-6434-4b0c-a226-6a1ca9d42ce6","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","San Francisco Board of Supervisors Rules Committee Meeting – March 20, 2023",null,"area","Films and video: San Francisco Board of Supervisors Rules Committee Meeting – March 20, 2023","https://archive.org/details/openpublica-san_francisco-california-1611ec35-cfd7-478a-a654-8c40821dace2","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Mayor's Press Availability : SFGTV : March 5, 2023 8:30pm-9:01pm PST",null,"area","TV News Archive: Mayor's Press Availability : SFGTV : March 5, 2023 8:30pm-9:01pm PST","https://archive.org/details/SFGTV_20230306_043000_Mayors_Press_Availability","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Commission on Community Investment & Infrastructure : SFGTV : August 19, 2023 1:00am-2:31am PDT",null,"area","TV News Archive: Commission on Community Investment & Infrastructure : SFGTV : August 19, 2023 1:00a","https://archive.org/details/SFGTV_20230819_080000_Commission_on_Community_Investment__Infrastructure","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","BOS Land Use & Transportation Committe : SFGTV : March 7, 2023 9:00am-10:01am PST",null,"area","TV News Archive: BOS Land Use & Transportation Committe : SFGTV : March 7, 2023 9:00am-10:01am PST","https://archive.org/details/SFGTV_20230307_170000_BOS_Land_Use__Transportation_Committe","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Mayor's Press Availability : SFGTV : February 23, 2023 5:00am-5:31am PST",null,"area","TV News Archive: Mayor's Press Availability : SFGTV : February 23, 2023 5:00am-5:31am PST","https://archive.org/details/SFGTV_20230223_130000_Mayors_Press_Availability","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","1862 Flood Thinkwalk With Joel Pomerantz Dec 2 2023",null,"area","Films and video: 1862 Flood Thinkwalk With Joel Pomerantz Dec 2 2023","https://archive.org/details/1862-flood-thinkwalk-with-joel-pomerantz-dec-2-2023","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Mayor's Press Availability : SFGTV : March 13, 2023 4:30pm-5:01pm PDT",null,"area","TV News Archive: Mayor's Press Availability : SFGTV : March 13, 2023 4:30pm-5:01pm PDT","https://archive.org/details/SFGTV_20230313_233000_Mayors_Press_Availability","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","San Francisco Board of Supervisors Regular Meeting – December 5, 2023",null,"area","Films and video: San Francisco Board of Supervisors Regular Meeting – December 5, 2023","https://archive.org/details/openpublica-san_francisco-california-f49b7669-7235-4842-807c-3f5b263356ef","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Mayor's Press Availability : SFGTV : February 26, 2023 11:00am-12:01pm PST",null,"area","TV News Archive: Mayor's Press Availability : SFGTV : February 26, 2023 11:00am-12:01pm PST","https://archive.org/details/SFGTV_20230226_190000_Mayors_Press_Availability","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Mayor's Press Availability : SFGTV : February 21, 2023 9:30am-10:01am PST",null,"area","TV News Archive: Mayor's Press Availability : SFGTV : February 21, 2023 9:30am-10:01am PST","https://archive.org/details/SFGTV_20230221_173000_Mayors_Press_Availability","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Commission on Community Investment & Infrastructure : SFGTV : August 18, 2023 10:30pm-12:01am PDT",null,"area","TV News Archive: Commission on Community Investment & Infrastructure : SFGTV : August 18, 2023 10:30","https://archive.org/details/SFGTV_20230819_053000_Commission_on_Community_Investment__Infrastructure","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Commission on Community Investment & Infrastructure : SFGTV : August 26, 2023 10:30pm-12:01am PDT",null,"area","TV News Archive: Commission on Community Investment & Infrastructure : SFGTV : August 26, 2023 10:30","https://archive.org/details/SFGTV_20230827_053000_Commission_on_Community_Investment__Infrastructure","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Mayor's Press Availability : SFGTV : February 24, 2023 3:30pm-4:01pm PST",null,"area","TV News Archive: Mayor's Press Availability : SFGTV : February 24, 2023 3:30pm-4:01pm PST","https://archive.org/details/SFGTV_20230224_233000_Mayors_Press_Availability","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","San Francisco Port Commission Meeting – February 14, 2023",null,"area","Films and video: San Francisco Port Commission Meeting – February 14, 2023","https://archive.org/details/openpublica-san_francisco-california-17798955-4832-4846-a1bb-1f79f43f84d2","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Commission on Community Investment & Infrastructure : SFGTV : September 1, 2023 10:30pm-12:01am PDT",null,"area","TV News Archive: Commission on Community Investment & Infrastructure : SFGTV : September 1, 2023 10:","https://archive.org/details/SFGTV_20230902_053000_Commission_on_Community_Investment__Infrastructure","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","KRON 4 News at 5am : KRON : September 26, 2023 5:00am-6:01am PDT",null,"area","TV News Archive: KRON 4 News at 5am : KRON : September 26, 2023 5:00am-6:01am PDT","https://archive.org/details/KRON_20230926_120000_KRON_4_News_at_5am","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","BOS Land Use & Transportation Committe : SFGTV : March 6, 2023 1:30pm-2:31pm PST",null,"area","TV News Archive: BOS Land Use & Transportation Committe : SFGTV : March 6, 2023 1:30pm-2:31pm PST","https://archive.org/details/SFGTV_20230306_213000_BOS_Land_Use__Transportation_Committe","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Mayor's Press Availability : SFGTV : March 1, 2023 1:00pm-1:31pm PST",null,"area","TV News Archive: Mayor's Press Availability : SFGTV : March 1, 2023 1:00pm-1:31pm PST","https://archive.org/details/SFGTV_20230301_210000_Mayors_Press_Availability","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Mayor's Press Availability : SFGTV : March 3, 2023 8:30am-9:01am PST",null,"area","TV News Archive: Mayor's Press Availability : SFGTV : March 3, 2023 8:30am-9:01am PST","https://archive.org/details/SFGTV_20230303_163000_Mayors_Press_Availability","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","BOS Public Safety & Neighborhood Services Committee : SFGTV : February 23, 2023 10:00am-11:01am PST",null,"area","TV News Archive: BOS Public Safety & Neighborhood Services Committee : SFGTV : February 23, 2023 10:","https://archive.org/details/SFGTV_20230223_180000_BOS_Public_Safety__Neighborhood_Services_Committee","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Commission on Community Investment & Infrastructure : SFGTV : August 26, 2023 1:00am-2:31am PDT",null,"area","TV News Archive: Commission on Community Investment & Infrastructure : SFGTV : August 26, 2023 1:00a","https://archive.org/details/SFGTV_20230826_080000_Commission_on_Community_Investment__Infrastructure","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","BOS Budget and Appropriations Committee : SFGTV : June 15, 2023 10:00am-2:00pm PDT",null,"area","TV News Archive: BOS Budget and Appropriations Committee : SFGTV : June 15, 2023 10:00am-2:00pm PDT","https://archive.org/details/SFGTV_20230615_170000_BOS_Budget_and_Appropriations_Committee","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Port Commission : SFGTV : December 24, 2023 7:30pm-10:01pm PST",null,"area","TV News Archive: Port Commission : SFGTV : December 24, 2023 7:30pm-10:01pm PST","https://archive.org/details/SFGTV_20231225_033000_Port_Commission","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","BOS Budget and Appropriations Committee : SFGTV : March 10, 2023 3:00am-5:31am PST",null,"area","TV News Archive: BOS Budget and Appropriations Committee : SFGTV : March 10, 2023 3:00am-5:31am PST","https://archive.org/details/SFGTV_20230310_110000_BOS_Budget_and_Appropriations_Committee","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Mayor's Press Availability : SFGTV : February 27, 2023 1:00pm-1:31pm PST",null,"area","TV News Archive: Mayor's Press Availability : SFGTV : February 27, 2023 1:00pm-1:31pm PST","https://archive.org/details/SFGTV_20230227_210000_Mayors_Press_Availability","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Port Commission Meeting Recap – October 10, 2023",null,"area","Films and video: Port Commission Meeting Recap – October 10, 2023","https://archive.org/details/openpublica-san_francisco-california-36bc383c-33b4-422e-b695-d86af4832814","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","San Francisco Port Commission Meeting - June 13, 2023",null,"area","Films and video: San Francisco Port Commission Meeting - June 13, 2023","https://archive.org/details/openpublica-san_francisco-california-ca2c2a8c-1ab6-4f9b-a3b8-c5e7dc0fe3ae","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Commission on the Environment : SFGTV : September 6, 2023 10:00pm-11:36pm PDT",null,"area","TV News Archive: Commission on the Environment : SFGTV : September 6, 2023 10:00pm-11:36pm PDT","https://archive.org/details/SFGTV_20230907_050000_Commission_on_the_Environment","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Mayor's Press Availability : SFGTV : March 1, 2023 9:30pm-10:01pm PST",null,"area","TV News Archive: Mayor's Press Availability : SFGTV : March 1, 2023 9:30pm-10:01pm PST","https://archive.org/details/SFGTV_20230302_053000_Mayors_Press_Availability","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","University of California Regents: Health/Athletics 10-11-2023",null,"area","Films and video: University of California Regents: Health/Athletics 10-11-2023","https://archive.org/details/health-services-committee-afternoon","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","https://missionbayparks.com/ as captured 2023-01-24",null,"area","Wayback Machine: https://missionbayparks.com/ as captured 2023-01-24","https://web.archive.org/web/20230124190027/https://missionbayparks.com/","qipu:sf/place/fill/mission-bay","showcase_search"],["2023","depicted in","Mayor's Press Availability : SFGTV : March 2, 2023 12:30pm-1:01pm PST",null,"area","TV News Archive: Mayor's Press Availability : SFGTV : March 2, 2023 12:30pm-1:01pm PST","https://archive.org/details/SFGTV_20230302_203000_Mayors_Press_Availability","qipu:sf/place/fill/mission-bay","showcase_search"],["2024","depicted in","San Francisco Rules Committee Regular Meeting - February 12, 2024",null,"area","Films and video: San Francisco Rules Committee Regular Meeting - February 12, 2024","https://archive.org/details/openpublica-san_francisco-california-622efbd6-cc8d-42ca-afce-9a008b1b8397","qipu:sf/place/fill/mission-bay","showcase_search"],["2024","depicted in","https://sfocii.org/mission-bay-cac-agendas as captured 2024-06-22",null,"area","Wayback Machine: https://sfocii.org/mission-bay-cac-agendas as captured 2024-06-22","https://web.archive.org/web/20240622103146/https://sfocii.org/mission-bay-cac-agendas","qipu:sf/place/fill/mission-bay","showcase_search"],["2024","depicted in","San Francisco Port Commission Meeting Summary: June 11, 2024",null,"area","Films and video: San Francisco Port Commission Meeting Summary: June 11, 2024","https://archive.org/details/openpublica-san_francisco-california-1ec23e60-d2ef-49d8-9d0b-4fbe233b4bb5","qipu:sf/place/fill/mission-bay","showcase_search"],["2024","depicted in","San Francisco Land Use and Transportation Committee Meeting - July 8, 2024",null,"area","Films and video: San Francisco Land Use and Transportation Committee Meeting - July 8, 2024","https://archive.org/details/openpublica-san_francisco-california-ea9d9444-67d5-4134-badc-1943e18cd81f","qipu:sf/place/fill/mission-bay","showcase_search"],["2024","depicted in","Commission on Community Investment & Infrastructure : SFGTV : May 28, 2024 4:30pm-8:01pm PDT",null,"area","TV News Archive: Commission on Community Investment & Infrastructure : SFGTV : May 28, 2024 4:30pm-8","https://archive.org/details/SFGTV_20240528_233000_Commission_on_Community_Investment__Infrastructure","qipu:sf/place/fill/mission-bay","showcase_search"],["2024","depicted in","San Francisco Port Commission Meeting - February 27, 2024",null,"area","Films and video: San Francisco Port Commission Meeting - February 27, 2024","https://archive.org/details/openpublica-san_francisco-california-1e42447c-0563-40c0-9fb4-4e6a767946c4","qipu:sf/place/fill/mission-bay","showcase_search"],["2024","depicted in","Commission on Community Investment & Infrastructure : SFGTV : June 8, 2024 12:22am-3:41am PDT",null,"area","TV News Archive: Commission on Community Investment & Infrastructure : SFGTV : June 8, 2024 12:22am-","https://archive.org/details/SFGTV_20240608_072200_Commission_on_Community_Investment__Infrastructure","qipu:sf/place/fill/mission-bay","showcase_search"],["2024","depicted in","Public Safety and Neighborhood Services Committee Meeting - March 28, 2024",null,"area","Films and video: Public Safety and Neighborhood Services Committee Meeting - March 28, 2024","https://archive.org/details/openpublica-san_francisco-california-92820446-0154-4902-af01-86725e301080","qipu:sf/place/fill/mission-bay","showcase_search"],["2024","depicted in","San Francisco Port Commission Regular Meeting – November 25, 2024",null,"area","Films and video: San Francisco Port Commission Regular Meeting – November 25, 2024","https://archive.org/details/openpublica-san_francisco-california-213255d0-07d8-467b-aef7-c5d463778016","qipu:sf/place/fill/mission-bay","showcase_search"],["2024","depicted in","San Francisco Port Commission Meeting - February 6, 2024",null,"area","Films and video: San Francisco Port Commission Meeting - February 6, 2024","https://archive.org/details/openpublica-san_francisco-california-30fb909c-e1e0-4733-a054-f2d3aff8d441","qipu:sf/place/fill/mission-bay","showcase_search"],["2024","depicted in","SFPUC Commission Meeting: March 12, 2024 – Biosolids Amendment, Flood Study, and Audits",null,"area","Films and video: SFPUC Commission Meeting: March 12, 2024 – Biosolids Amendment, Flood Study, and Au","https://archive.org/details/openpublica-san_francisco-california-d8fa53fa-f950-4537-8ec2-ebc3e3ad4fc7","qipu:sf/place/fill/mission-bay","showcase_search"],["2024","depicted in","San Francisco Land Use and Transportation Committee Regular Meeting - December 9, 2024",null,"area","Films and video: San Francisco Land Use and Transportation Committee Regular Meeting - December 9, 2","https://archive.org/details/openpublica-san_francisco-california-75b564f7-1f5c-45ab-bc17-145e0c5f2763","qipu:sf/place/fill/mission-bay","showcase_search"],["2024","depicted in","San Francisco Police Commission Meeting – September 18, 2024",null,"area","Films and video: San Francisco Police Commission Meeting – September 18, 2024","https://archive.org/details/openpublica-san_francisco-california-f4c6742b-5a3e-4020-9cf2-43e36b4afbf8","qipu:sf/place/fill/mission-bay","showcase_search"],["2024","recorded at","Resisting Fascism & Ecological Collapse with Writer-Organizer-Activist CHRIS CARLSSON",null,"area","Audio: Resisting Fascism & Ecological Collapse with Writer-Organizer-Activist CHRIS CARLSSON","https://archive.org/details/tjiypt9uyqwgohrd9zvb7knx6f6mmbagjlyxd9nu","qipu:sf/place/fill/mission-bay","showcase_search"],["2024","depicted in","San Francisco Port Commission Meeting: Fisherman's Wharf Term Sheet and Dry Dock Funding, October 8, 2024",null,"area","Films and video: San Francisco Port Commission Meeting: Fisherman's Wharf Term Sheet and Dry Dock Fu","https://archive.org/details/openpublica-san_francisco-california-fc94b2e4-015c-4da8-aabd-078201674a93","qipu:sf/place/fill/mission-bay","showcase_search"],["2024","depicted in","Port Commission : SFGTV : December 31, 2023 7:30pm-10:01pm PST",null,"area","TV News Archive: Port Commission : SFGTV : December 31, 2023 7:30pm-10:01pm PST","https://archive.org/details/SFGTV_20240101_033000_Port_Commission","qipu:sf/place/fill/mission-bay","showcase_search"],["2024","recorded at","Resisting Ecological Collapse & Fascism with Writer-Organizer-Activist CHRIS CARLSSON",null,"area","Audio: Resisting Ecological Collapse & Fascism with Writer-Organizer-Activist CHRIS CARLSSON","https://archive.org/details/huarc3rdq2mfm0nasjaosdvkdoe8p7jtmxqycbsb","qipu:sf/place/fill/mission-bay","showcase_search"],["2025","depicted in","Port Commission Meeting - March 11, 2025: Ferry Landing, Mission Rock, and Pier 29 Arts Activation",null,"area","Films and video: Port Commission Meeting - March 11, 2025: Ferry Landing, Mission Rock, and Pier 29 ","https://archive.org/details/openpublica-san_francisco-california-75917d1f-cf09-4a71-8253-993a1714d1fc","qipu:sf/place/fill/mission-bay","showcase_search"],["2025","depicted in","https://sfocii.org/mission-bay-cac-agendas as captured 2025-02-17",null,"area","Wayback Machine: https://sfocii.org/mission-bay-cac-agendas as captured 2025-02-17","https://web.archive.org/web/20250217050428/https://sfocii.org/mission-bay-cac-agendas","qipu:sf/place/fill/mission-bay","showcase_search"],["2025","depicted in","San Francisco Port Commission Meeting - May 13, 2025",null,"area","Films and video: San Francisco Port Commission Meeting - May 13, 2025","https://archive.org/details/openpublica-san_francisco-california-709e923d-bbf1-4e90-b407-bf7c6ac02938","qipu:sf/place/fill/mission-bay","showcase_search"],["2025","depicted in","San Francisco BOS Budget and Appropriations Committee Meeting - June 11, 2025",null,"area","Films and video: San Francisco BOS Budget and Appropriations Committee Meeting - June 11, 2025","https://archive.org/details/openpublica-san_francisco-california-199ef6a9-018f-4133-ba43-d082bed9d0cc","qipu:sf/place/fill/mission-bay","showcase_search"],["2025","depicted in","SF Police Commission Meeting Covers Crime Trends, District Boundaries, and DGO 1.06 on February 19, 2025",null,"area","Films and video: SF Police Commission Meeting Covers Crime Trends, District Boundaries, and DGO 1.06","https://archive.org/details/openpublica-san_francisco-california-ebde06bd-2a2d-4307-8bad-309e7d49ae3f","qipu:sf/place/fill/mission-bay","showcase_search"],["2025","depicted in","Environment Committee Meeting Summary - October 16, 2025",null,"area","Films and video: Environment Committee Meeting Summary - October 16, 2025","https://archive.org/details/openpublica-san_diego-california-f4f22dc8-46dd-4c98-b7e4-3e02ed90cd3a","qipu:sf/place/fill/mission-bay","showcase_search"],["2025","depicted in","San Diego Active Transportation & Infrastructure Committee Meeting – March 20, 2025",null,"area","Films and video: San Diego Active Transportation & Infrastructure Committee Meeting – March 20, 2025","https://archive.org/details/openpublica-san_diego-california-e9360d0e-a373-404a-b6a7-01666681357c","qipu:sf/place/fill/mission-bay","showcase_search"],["2025","depicted in","https://missionbayparks.com/ as captured 2025-11-17",null,"area","Wayback Machine: https://missionbayparks.com/ as captured 2025-11-17","https://web.archive.org/web/20251117220006/https://missionbayparks.com/","qipu:sf/place/fill/mission-bay","showcase_search"],["2025","depicted in","Budget and Finance Committee Meeting - March 26, 2025: Multiple Agenda Items Including Port Leases, Housing Loans, and Shelter Lease Extension",null,"area","Films and video: Budget and Finance Committee Meeting - March 26, 2025: Multiple Agenda Items Includ","https://archive.org/details/openpublica-san_francisco-california-abee50a9-195f-4ce4-90e9-6289e66046be","qipu:sf/place/fill/mission-bay","showcase_search"],["2025","depicted in","San Francisco Police Commission Meeting - March 12, 2025",null,"area","Films and video: San Francisco Police Commission Meeting - March 12, 2025","https://archive.org/details/openpublica-san_francisco-california-74eb2d72-5304-44c5-b95e-067ac01cce30","qipu:sf/place/fill/mission-bay","showcase_search"],["2025","depicted in","San Francisco Port Commission Meeting - February 25, 2025",null,"area","Films and video: San Francisco Port Commission Meeting - February 25, 2025","https://archive.org/details/openpublica-san_francisco-california-95708e1f-ca29-4aba-8e69-cbf2b3aceba9","qipu:sf/place/fill/mission-bay","showcase_search"],["2025","depicted in","San Francisco Board of Supervisors Budget and Finance Committee Regular Meeting - July 9, 2025",null,"area","Films and video: San Francisco Board of Supervisors Budget and Finance Committee Regular Meeting - J","https://archive.org/details/openpublica-san_francisco-california-0c45b9e8-3532-4878-a02a-361901301bc9","qipu:sf/place/fill/mission-bay","showcase_search"],["2025","depicted in","San Francisco Port Commission Meeting - July 8, 2025",null,"area","Films and video: San Francisco Port Commission Meeting - July 8, 2025","https://archive.org/details/openpublica-san_francisco-california-053f6ed7-5cf6-11f0-b7f5-005056a89546","qipu:sf/place/fill/mission-bay","showcase_search"],["2026","depicted in","San Francisco Public Safety Committee Hearing on Liquor Licenses and Tree Canopy Equity - September 24, 2026",null,"area","Films and video: San Francisco Public Safety Committee Hearing on Liquor Licenses and Tree Canopy Eq","https://archive.org/details/openpublica-san_francisco-california-2ddfeb80-7d76-48c7-a6b2-1edee6d2bb4f","qipu:sf/place/fill/mission-bay","showcase_search"],["2026","depicted in","San Francisco Planning Commission Hearing - March 19, 2026",null,"area","Films and video: San Francisco Planning Commission Hearing - March 19, 2026","https://archive.org/details/openpublica-san_francisco-california-a343a1eb-9b39-4c86-b482-97080ca45f09","qipu:sf/place/fill/mission-bay","showcase_search"],["2026","depicted in","San Francisco Port Commission Meeting – August 12, 2026",null,"area","Films and video: San Francisco Port Commission Meeting – August 12, 2026","https://archive.org/details/openpublica-san_francisco-california-bb89f711-967e-11f1-bb61-005056a89546","qipu:sf/place/fill/mission-bay","showcase_search"],["2026","depicted in","San Francisco Port Commission Meeting - March 10, 2026: Reports, Policy Updates, and Project Feasibility",null,"area","Films and video: San Francisco Port Commission Meeting - March 10, 2026: Reports, Policy Updates, an","https://archive.org/details/openpublica-san_francisco-california-ac1afb79-9c24-4609-8146-5720f8522c25","qipu:sf/place/fill/mission-bay","showcase_search"],["2026","depicted in","University of California Regents: 5-6-2026",null,"area","Films and video: University of California Regents: 5-6-2026","https://archive.org/details/regents-finance-and-capital-strategies-academic-and-student-affairs-5-6-2026","qipu:sf/place/fill/mission-bay","showcase_search"],["2026","depicted in","SF Public Safety Committee: Liquor Licenses & Tree Canopy Equity Hearing (Sept 25, 2026)",null,"area","Films and video: SF Public Safety Committee: Liquor Licenses & Tree Canopy Equity Hearing (Sept 25, ","https://archive.org/details/openpublica-san_francisco-california-c9780734-fbeb-4cd2-94d0-0627d51b4fa2","qipu:sf/place/fill/mission-bay","showcase_search"],["2026","depicted in","Environment Committee Meeting - April 16, 2026",null,"area","Films and video: Environment Committee Meeting - April 16, 2026","https://archive.org/details/openpublica-san_diego-california-95457d60-808c-4240-95ac-e0e8601faf05","qipu:sf/place/fill/mission-bay","showcase_search"],["2026","depicted in","San Francisco Board of Supervisors Regular Meeting - October 6, 2026",null,"area","Films and video: San Francisco Board of Supervisors Regular Meeting - October 6, 2026","https://archive.org/details/openpublica-san_francisco-california-094eebd5-d27d-4439-82ce-656b2581d659","qipu:sf/place/fill/mission-bay","showcase_search"],["2026","depicted in","San Francisco Port Commission Meeting - September 15, 2026: Grant Amendment, CFD Formation, and Park Redesign",null,"area","Films and video: San Francisco Port Commission Meeting - September 15, 2026: Grant Amendment, CFD Fo","https://archive.org/details/openpublica-san_francisco-california-3d353563-cc1e-401a-8e87-3f00345b19e3","qipu:sf/place/fill/mission-bay","showcase_search"],["2026","depicted in","Budget & Finance Committee Meeting – July 8, 2026",null,"area","Films and video: Budget & Finance Committee Meeting – July 8, 2026","https://archive.org/details/openpublica-san_francisco-california-854bf1fc-2fe6-4a20-afca-470b9b3e3069","qipu:sf/place/fill/mission-bay","showcase_search"],["2026","depicted in","San Francisco Board of Supervisors Land Use and Transportation Committee - September 14, 2026",null,"area","Films and video: San Francisco Board of Supervisors Land Use and Transportation Committee - Septembe","https://archive.org/details/openpublica-san_francisco-california-37336672-251b-42bf-99cb-abb4db326fd7","qipu:sf/place/fill/mission-bay","showcase_search"],["2026","depicted in","https://missionbayparks.com/ as captured 2026-03-17",null,"area","Wayback Machine: https://missionbayparks.com/ as captured 2026-03-17","https://web.archive.org/web/20260317002044/https://missionbayparks.com/","qipu:sf/place/fill/mission-bay","showcase_search"],[null,"recorded at","University of California Regents: Meeting of Jan. 17, 2019",null,"area","Audio: University of California Regents: Meeting of Jan. 17, 2019","https://archive.org/details/RegentsFullBoard11719","qipu:sf/place/fill/mission-bay","showcase_search"],[null,"recorded at","Art & Politics: Brian Barneclo",null,"area","Audio: Art & Politics: Brian Barneclo","https://archive.org/details/ArtPoliticsBrianBarneclo","qipu:sf/place/fill/mission-bay","showcase_search"],[null,"concerns place","Mission Bay : draft supplement to the Draft environmental impact report",null,"area","SF Public Library scans: Mission Bay : draft supplement to the Draft environmental impact report","https://archive.org/details/missionbaydrafts1719city","ia:missionbaydrafts1719city","showcase_search"],[null,"recorded at","University of California Regents - Investments: 11-13-2018",null,"area","Audio: University of California Regents - Investments: 11-13-2018","https://archive.org/details/InvestmentsSubcom11132018","qipu:sf/place/fill/mission-bay","showcase_search"],[null,"recorded at","University of California Regents, Afternoon: 11-14-2018",null,"area","Audio: University of California Regents, Afternoon: 11-14-2018","https://archive.org/details/2FinanceAndCapitalStrategiesCommittee111418pm","qipu:sf/place/fill/mission-bay","showcase_search"],[null,"recorded at","Vanished Waters: A History of San Francisco's Mission Bay",null,"area","Audio: Vanished Waters: A History of San Francisco's Mission Bay","https://archive.org/details/VanishedWatersAHistoryOfSanFranciscosMissionBay","qipu:sf/place/fill/mission-bay","showcase_search"],[null,"concerns place","Mission Bay, existing land uses/employment",null,"area","SF Public Library scans: Mission Bay, existing land uses/employment","https://archive.org/details/missionbayexisti1986rech","ia:missionbayexisti1986rech","showcase_search"],[null,"recorded at","University of California Regents (Investments) Nov. 14, 2017",null,"area","Audio: University of California Regents (Investments) Nov. 14, 2017","https://archive.org/details/RegentsInvest111417","qipu:sf/place/fill/mission-bay","showcase_search"],[null,"recorded at","University of California Regents: May 16, 2019",null,"area","Audio: University of California Regents: May 16, 2019","https://archive.org/details/regents-board-5-16-19edit","qipu:sf/place/fill/mission-bay","showcase_search"],[null,"concerns place","Mission Bay Pavilion",null,"area","Other: Mission Bay Pavilion","https://archive.org/details/ArchiveIt-Collection-19803","ia:ArchiveIt-Collection-19803","showcase_search"],[null,"concerns place","[Agenda]",null,"area","SF Public Library scans: [Agenda]","https://archive.org/details/agenda1999sanf_4","ia:agenda1999sanf_4","showcase_search"],[null,"concerns place","Wetlands/playfields : special studies : wetland habitat creation at the Mission Bay project site on assessor's block #3880, near piers 48 and 50",null,"area","SF Public Library scans: Wetlands/playfields : special studies : wetland habitat creation at the Mis","https://archive.org/details/wetlandsplayfiel1986prep","ia:wetlandsplayfiel1986prep","showcase_search"],[null,"depicted in","Ecology Emerges: Ruth Gravanis",null,"area","Films and video: Ecology Emerges: Ruth Gravanis","https://archive.org/details/EcologyEmergesRuthGravanis","qipu:sf/place/fill/mission-bay","showcase_search"],[null,"concerns place","Mission Bay subdivision regulations : for the information and guidance of all subdividers, engineers, and surveyors with reference to the subdivision of land within Mission Bay project area within the City and County of San Francisco and to supplement the Mission Bay subdivision code",null,"area","SF Public Library scans: Mission Bay subdivision regulations : for the information and guidance of a","https://archive.org/details/missionbaysubdiv1998sanf","ia:missionbaysubdiv1998sanf","showcase_search"],[null,"recorded at","University of California Regents, Sept. 15, 2015",null,"area","Audio: University of California Regents, Sept. 15, 2015","https://archive.org/details/Regents91515Edited","qipu:sf/place/fill/mission-bay","showcase_search"],[null,"recorded at","University of California Regents: Jan. 15, 2019",null,"area","Audio: University of California Regents: Jan. 15, 2019","https://archive.org/details/1RegentsInvestments11519","qipu:sf/place/fill/mission-bay","showcase_search"]],"up_the_hierarchy":null,"all_records_view":null,"note":"Claims about this place only. Its parent and children have their own documents (a parcel inherits nothing; ask the block for decisions placed at block level).","release":"v0.7.1","licence":"CC0-1.0 (claims); sources keep their own rights","view":"https://data.qipu.org/#id=qipu:sf/place/fill/mission-bay","id_policy":"https://data.qipu.org/README.html#stable-ids","sameAs":["http://www.wikidata.org/entity/Q6878535"]}